Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend Unit 1
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
Nine Mile Point Unit 3
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

Bell Bend Nuclear Power Plant Application

Bell Bend
Who:   PPL Bell Bend, LLC

What:   Application for a combined license (COL) for an AREVA U.S. Evolutionary Power Reactor (U.S. EPR) designated as the Bell Bend Nuclear Power Plant Unit 1

When:   October 10, 2008 (date of application submittal)

Where:   New Site adjacent to PPL's Susquehanna Steam Electric Station, Luzerne County, PA.

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
10/10/08 PPL Bell Bend, LLC's transmittal letter for Bell Bend Nuclear Power Plant COLA
  • Part 1 - General Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - Limited Work Authorization
  • Part 7 - Departures and Exemption Requests
  • Part 8 - Security Plan
  • Part 9 - Sensitive Information [This Part contains safeguards information which is with-held from public availability]
  • Part 10 - Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
  • Part 11A - Quality Assurance Program Description (QAPD)
  • Part 11B - AREVA Design Control Document
  • Part 11C - AREVA DCD Supplements
  • Part 11D - NEI References
  • Part 11E - Fuel Rack Supplements
  • Part 11F - Boring Logs
  • Part 11G - Seismic Refraction
  • Part 11H - Wetlands Delineation Report
  • Part 11I - Cultural Resources
  • Part 11J - Terrestrial Ecology
  • Part 11K - Aquatic Ecology
  • Part 11L - Noise Studies
  • Part 11M - Traffic Impact Studies

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 10/10/08 - A
Acceptance Review
Acceptance Review Start
10/14/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
12/15/08 - T
Review Schedule Established/Schedule Letter Issued to Applicant
TBD
Safety Review
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant
 
Phase 2 - SER with Open Items issued
 
Phase 3 - ACRS Review of SER with Open Items Complete
 
Phase 4 - Advanced SER with no Open Items Issued
 
Phase 5 - ACRS Review of SER with no Open Items Complete
 
Phase 6 - Final SER Issued
 
Environmental Review
Phase 1 - Environmental impact statement (EIS) summary report issued
 
Phase 2 - Draft EIS issued to EPA
 
Phase 3 - Response to public comments on draft EIS issued
 
Phase 4 - Final EIS issued to EPA
 
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
12/30/08 Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process
11/05/08 Acknowledgement of Receipt of Application

To top of page

Public Meetings

Date Description
01/29/09 Environmental Scoping Process
11/20/08 Public Meeting with PPL Bell Bend LLC to discuss issues regarding application submittal

To top of page

Contacts

Contacts for the Bell Bend COL Application
Safety Project Manager Michael Canova
Environmental Project Manager Stacey Imboden
Contact a Public Affairs Officer