skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Fermi

1.0 Site Identification

Location: Newport, MI
License No.: DRP-9
Docket No.: 50-16
License Status: SAFSTOR
Project Manager: Ted Smith

2.0 Site Status Summary

The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) is located in Monroe County, Michigan. The site boundary is completely contained within the Fermi 2 site boundary, adjacent to Lake Erie. The site consists of six main buildings and several smaller gallery buildings and interconnections. Fermi 1 has an onsite groundwater monitoring program, which has found no groundwater contamination due to Fermi 1 operations.

Fermi 1 was a fast breeder reactor power plant cooled by sodium and operated at essentially atmospheric pressure. The reactor plant was designed for a maximum capacity of 430 Mwt; however, the maximum reactor power with the first core loading (Core A) was 200 Mwt. The primary system was filled with sodium in December of 1960 and criticality was achieved in August 1963. The reactor was tested at low power in its first couple years of operation. Power ascension testing above 1 Mwt commenced in December 1965, immediately following receipt of the high power operating license. In October 1966, during a power ascension, a zirconium plate at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt. Radiation monitors alarmed and the operators manually shut down the reactor. No abnormal releases to the environment occurred. Three years and nine months later, the cause had been determined, cleanup completed, fuel replaced, and Fermi 1 was restarted. In 1972, the core was approaching the burnup limit. In November 1972, the Power Reactor Development Company made the decision to decommission Fermi 1. The fuel and blanket subassemblies were shipped offsite in 1973. The non-radioactive secondary sodium system was drained and the sodium sent to Fike Chemical Company. The radioactive primary sodium was stored in storage tanks and in 55 gallon drums until the sodium was shipped offsite in 1984. Decommissioning of the Fermi 1 plant was originally completed in December 1975. The site has been in a SAFSTOR status, awaiting final decommissioning. The license for Fermi 1 expires in 2025.

3.0 Major Technical or Regulatory Issues

The facility is currently in SAFSTOR condition. However, decommissioning work continues under the licensee's SAR: bulk sodium has been removed from the site, the reactor vessel has been inerted (i.e. residual sodium has been passivated through controlled chemical reaction) and is being prepared for removal, and the three primary loops are being inerted and disposed. There is no spent fuel onsite. The licensee is preparing an LTP for submittal to NRC in mid 2009.

4.0 Estimated Date For Closure

10/01/2012



Privacy Policy | Site Disclaimer
Thursday, November 13, 2008