Search Options | ||||
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us |
LICENSEE: SOUTH CAROLINA ELECTRIC & GAS CO. SITE: SUMMER 1 EN NUMBER:30752 DOCKET: 05000395 EVENT DATE: 05-17-96 RX TYPE: PWR EVENT TIME: 00:00 VENDORS: W-3-LP NOTIFY DATE: 07-15-96 EMERGENCY CLASS: N/A REGION: 2 STATE: SC TIME: 16:15 OPS OFFICER: BOB STRANSKY 10 CFR SECTION: CDEF 21.21(b)(2) DEFECTS/NONCOMPLIANCE UNIT SCRAM RX INIT INITIAL MODE CURR CURRENT MODE CODE CRIT PWR PWR 1 N N 0 HOT SHUTDOWN 0 HOT SHUTDOWN 10 CFR PART 21 REPORT REGARDING FAILURES OF ABB/ITE 27N RELAYS. THE FOLLOWING IS TEXT OF A FACSIMILE SUBMITTED BY THE LICENSEE: "NONCONFORMANCE NOTICE 5472 REPORTS THE THIRD FAILURE OF ABB/ITE 27N RELAYS AT V.C. SUMMER NUCLEAR STATION WITHIN A THREE YEAR PERIOD. IN EACH CASE, THE TIMER INTEGRATED CIRCUIT U5 WAS DETERMINED TO BE DEFECTIVE. IN ALL CASES, V.C. SUMMER NUCLEAR STATION ENSURED THAT THE ASSOCIATED APPLICATIONS WERE RESTORED TO OPERABLE STATUS UPON IDENTIFICATION, REPLACEMENT AND TESTING OF THE RESPECTIVE 27N RELAYS. ABB HAS NOT ESTABLISHED A ROOT CAUSE FOR WHAT APPEARS TO BE A REPETITIVE FAILURE OF THE U5 TIMER. THIS REPORT IS BEING MADE PURSUANT TO 10 CFR PART 21." THE NRC RESIDENT INSPECTOR HAS BEEN INFORMED BY THE LICENSEE.