Shieldalloy Metallurgical Corporation Newfield Facility - Decommissioning Plan

Shieldalloy Metallurgical Corporation Newfield Facility - Decommissioning Plan

Shieldalloy Metallurgical Corporation Newfield Facility

On this page:

Application Information:

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Letters and Correspondence

Milestone Schedule for Shieldalloy ER Review and EIS Preparation*

  Planned Actual
Receive Application October 2005 June 30, 2006
Acceptance Review Completed November 2005 October 18, 2006
NOI/Scoping FRN Issued November 15, 2006 December 28, 2007
Scoping Meeting and Site Visit (NJ) December 12, 2006 December 12, 2007
Scoping Comment Period Ends January 15, 2007 January 31, 2007
Draft EIS/FRN Availability July 17, 2007  
DSEIS Public Meeting (NJ) August 16, 2007  
Draft EIS Public Comment Period Ends September 15, 2007  
Issue Final EIS to EPA March 19, 2008  

* These schedules reflect work plans that are subject to change. Early completion of a milestone may affect the target date of future milestones. Subsequent meetings and comment periods may change based on the revised schedule. This work plan will be updated on a periodic basis. Please see the NRC Public Meetings Page or contact the listed PM for the latest information on meetings and status.

Public Involvement

  1. The public is encouraged to participate in the decommissioning process through public meetings, and public comment periods on rules, guidance, and other documents. The Shieldalloy Environmental Public Comments page provides an opportunity for the public to submit comments electronically to the NRC during the EIS scoping comment period which ends at midnight on January 31, 2007.

  2. Two public meetings were held in Newfield, NJ. A public information session on the review of the Shieldalloy Decommissioning Plan (DP) was held on December 5, 2007. On December 12, 2007, the NRC staff conducted a scoping meeting in support of the review of the environmental report submitted with the Shieldalloy DP. Over one-hundred people were in attendance at each meeting. Links to the transcripts and meeting presentations are provided below:

Public Information Session PDF Icon
Information Session Presentation
Environmental Scoping Meeting PDF Icon
Scoping Meeting Presentation

Project Managers for Shieldalloy Decommissioning Review

Shieldalloy PMs

Decommissioning Review Kenneth Kalman
Environmental Review Gregory Suber
NRC Region I Contact Marie Miller