Home > Facility Info Finder > Sites Undergoing Decommissioning > Complex Materials > Shieldalloy Metallurgical Corporation (SMC) > Newfield Facility - Decommissioning Plan
Shieldalloy Metallurgical Corporation Newfield Facility - Decommissioning Plan
Shieldalloy Metallurgical Corporation Newfield Facility -
Decommissioning Plan
On this page:
Application Information:
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
Letters and Correspondence
Milestone Schedule for Shieldalloy ER Review and EIS Preparation*
|
Planned |
Actual |
Receive Application |
October 2005 |
June 30, 2006 |
Acceptance Review Completed |
November 2005 |
October 18, 2006 |
NOI/Scoping FRN Issued |
November 15, 2006 |
December 28, 2007 |
Scoping Meeting and Site Visit (NJ) |
December 12, 2006 |
December 12, 2007 |
Scoping Comment Period Ends |
January 15, 2007 |
January 31, 2007 |
Draft EIS/FRN Availability |
July 17, 2007 |
|
DSEIS Public Meeting (NJ) |
August 16, 2007 |
|
Draft EIS Public Comment Period Ends |
September 15, 2007 |
|
Issue Final EIS to EPA |
March 19, 2008 |
|
* These schedules reflect work plans that are subject to change. Early completion of a milestone
may affect the target date of future milestones. Subsequent meetings and comment periods
may change based on the revised schedule. This work plan will be updated on a periodic basis.
Please see the NRC Public Meetings Page or contact the listed PM for the latest information on
meetings and status.
Public Involvement
-
The public is encouraged to participate in the decommissioning process through public meetings, and public comment periods on rules, guidance, and other documents. The Shieldalloy Environmental Public Comments page provides an opportunity for the public to submit comments electronically to the NRC during the EIS scoping comment period which ends at midnight on January 31, 2007.
- Two public meetings were held in Newfield, NJ. A public information session on the review of the Shieldalloy Decommissioning Plan (DP) was held on December 5, 2007. On December 12, 2007, the NRC staff conducted a scoping meeting in support of the review of the environmental report submitted with the Shieldalloy DP. Over one-hundred people were in attendance at each meeting. Links to the transcripts and meeting presentations are provided below:
Public Information Session
Information Session Presentation
Environmental Scoping Meeting
Scoping Meeting Presentation
Project Managers for Shieldalloy Decommissioning Review
Shieldalloy PMs |
Decommissioning Review |
Kenneth Kalman |
Environmental Review |
Gregory Suber |
NRC Region I Contact |
Marie Miller |
|