skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
New Reactors
What We Regulate
Combined License Applications
Design Certification Applications
Early Site Permits Applications
How We Regulate
Regulations, Guidance, and Communications
Regulatory Oversight

Regulatory Oversight for New Reactors

A new construction inspection program (CIP) is being developed for plants licensed in accordance with the requirements of 10 CFR Part 52. The introduction of "inspections, tests, analyses, and acceptance criteria" (ITAAC) into the Part 52 licensing process creates a design specific pre-approved set of performance standards that the licensee must meet and that the Commission must find have been met, before the licensee can load fuel and operate the plant.

As a result, a major focus of the CIP is on the licensee work being performed to support the completion of the ITAAC. However, additional inspections of quality assurance verification activities and operational programs will also be needed to provide assurance that these activities and programs are in compliance with applicable Nuclear Regulatory Commission (NRC) requirements. The CIP is being developed to address the specific needs associated with verifying the successful completion of the ITAAC as well as to incorporate lessons learned from previous NRC construction inspections.

Additional background documents of interest for revision of the CIP include the following:

For additional information about the NRC's oversight of new reactors, see the following related pages:

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Inspection Manual Chapters

Chapter Title
IMC 0614 Documenting 10 CFR 52 Construction Audit Activities
IMC 2501 Early Site Permit (ESP)
IMC 2502 Pre-Combined License (Pre-COL) Phase
IMC 2503 Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
IMC 2504 Non-ITAAC Inspections
IMC 2507 Vendor Inspections
IMC 2508 Design Certification

To top of page

Commission Papers (SECY)

SECY Title SRM
08-0155 Update on the Development of the Construction Inspection Program for New Reactor Construction under 10 CFR Part 52  
07-0049 Construction Inspection Roles And Responsibilities  
07-0047 Staff Approach To Verifying The Closure Of Inspections, Tests, Analyses, And Acceptance Criteria (ITAAC) Through A Sample Based Inspection Program 07-0047
06-0220 Final Rule to Update 10 CFR Part 52  
06-0114 Description Of The Construction Inspection Program For Plants Licensed Under 10 CFR Part 52  
06-0041 Proposed Strategy to Support Implementation of New Reactor Construction Inspection Program 06-0041
05-0197 Review Of Operational Programs In A Combined License Application And Generic Emergency Planning Inspections, Tests, Analyses, and Acceptance Criteria 05-0197
04-0032 Programmatic Information Needed For Approval Of A Combined License Without Inspections, Tests, Analyses, and Acceptance Criteria 04-0032
02-0067 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) For Operational Programs (Programmatic ITAAC) 02-0067

To top of page

Public Meetings

Our Public Meetings and Involvement page and NUREG/BR-0215, "Public Involvement in the Regulatory Process," provide general information about the available opportunities for public involvement in NRC activities. For more specific information about public meetings that the NRC staff has conducted in connection with its regulatory oversight for new reactors, see the following related pages:

2000s: | 2008 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002

To top of page



Privacy Policy | Site Disclaimer
Tuesday, November 04, 2008