GUIDE FOR CURING OF PORTLAND CEMENT CONCRETE PAVEMENTS
PUBLICATION NO. FHWA-RD-02-099
Final Report
FOREWORD
Curing has long been recognized as an important process in constructing durable concrete pavements. Proper curing allows the concrete to develop its potential strength and durability. Inadequate curing can result in surface damage in the form of plastic shrinkage cracking, spalling, and erosion of paste. Since many variables influence the choice of curing materials and when and how to apply curing, the guidance contained in this document should be very helpful to those responsible for concrete curing operations. It was developed through a review of the literature and of other available guidance supplemented by laboratory testing as necessary where information was lacking. It places particular emphasis on attention to details with respect to moisture retention and concrete temperature control.
This is Volume I of two volumes. Sufficient copies of this report are being distributed to provide eight copies to each FHWA Resource Center, four copies to each FHWA Division, and a minimum of six copies to each State highway agency. Direct distribution is being made to the division offices for their forwarding to the State highway agencies. Additional copies for the public are available from the National Technical Information Service (NTIS), 5285 Port Royal Road, Springfield, Virginia 22161. Fifty copies of Curing of Portland Cement Concrete Pavements, Volume II Final Report (FHWA-HRT-05-038) will be distributed, and Volume I and Volume II will be available online at www.tfhrc.gov.
T. Paul Teng, P.E.
Director, Office of Infrastructure
Research and Development
NOTICE
This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document. This report does not constitute a standard, specification, or regulation.
The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers' names appear in this report only because they are considered essential to the objective of the document.
Quality Assurance Statement
The Federal Highway Administration (FHWA) provides high-quality information to serve Government, industry, and the public in a manner that promotes public understanding. Standards and policies are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically reviews quality issues and adjusts its programs and processes to
ensure continuous quality improvement.
1. Report No.
FHWA-RD-02-099 |
2. Government Accession No. |
3. Recipient's Catalog No. |
4. Title and Subtitle
Incremental Costs and Performance Benefits of Various Features of Concrete Pavements |
5. Report Date
January 2005 |
6. Performing Organization Code |
7. Author(s)
Toy S. Poole |
8. Performing Organization Report No. |
9. Performing Organization Name and Address
Structures Laboratory
USAE Research and Development Center (ERDC)
3909 Halls Ferry Road
Vicksburg, MS 39180-6199 |
10. Work Unit No. (TRAIS) |
11. Contract or Grant No.
DTFH61-98-Y-50030 |
12. Sponsoring Agency Name and Address
Federal Highway Administration
6300 Georgetown Pike
McLean, VA 22101-2296 |
13. Type of Report and Period Covered
|
14. Sponsoring Agency Code |
15. Supplementary Notes
Contracting Officer’s Technical Representatives (COTR): Stephen
Forster and Peter Kopac, HRDI-11 |
16. Abstract
This document provides guidance on details of concrete curing practice as they pertain to
construction of portland cement concrete pavements. The guide is organized around the major
events in curing pavements: curing immediately after placement (initial curing), curing during
the period after final finishing (final curing), and termination of curing and evaluation of
effectiveness of curing. Information is presented on selection of curing materials and
procedures, analysis of concrete properties and jobsite conditions, and on ways to adjust
curing practice to account for specific project conditions. |
17. Key Words
Portland cement concrete pavements, curing |
18. Distribution Statement
|
19. Security Classif. (of this report)
Unclassified |
20. Security Classif. (of this page)
Unclassified |
21. No. of Pages
49 |
22. Price |
Form DOT F 1700.7 (8-72) Reproduction of completed page authorized
TABLE OF CONTENTS
CHAPTER 1. INTRODUCTION
CHAPTER 2. GENERAL TESTING, ANALYSIS, AND PLANNING BEFORE CONSTRUCTION
Concrete Materials and Mixture Proportions-Effect on Curing
Determination of Bleeding for Job Concrete
Importance of Time of Initial Setting
Anticipate Probable Drying and Thermal Stress Conditions on the Job
Analysis of Multiple Factors Affecting Early Moisture-Loss Management
Planning for Potential Corrective Action
CHAPTER 3. THE INITIAL CURING PERIOD
Verify Onsite Drying Conditions.
Effective Onsite Adjustments to Correct for Excessive Drying.
CHAPTER 4. THE FINAL CURING PERIOD
Curing Compound Methods
Water-Added Methods
Curing with Sheet Materials
Temperature-Control Methods
CHAPTER 5. TERMINATION OF CURING AND VERIFICATION OF CURING EFFECTIVENESS
Length of Curing
Verification of Curing
REFERENCES
OTHER SOURCES
LIST OF FIGURES
Figure 1. Chart. Major points for preconstruction planning
Figure 2. Equation. Bleeding rate from water-cement ratio
Figure 3. Equation. Time-averaged bleeding rate
Figure 4. Graph. Plot of bleed water formation v. time for a typical paving
mixture
Figure 5. Equation. Time of setting-adjustment for concrete temperature
Figure 6. Equation. Evaporation rate of bleed water-effect of environmental
conditions
Figure 7. Chart. Evaporation rate nomograph from ACI 308
Figure 8. Graph. Plot of cumulative bleed and cumulative evaporation v. time
Figure 9. Graph. Effect of reducing concrete placing temperature from 30 °C
to 25 °C
Figure 10. Graph. Effect of reducing evaporation by 50 percent by using
evaporation reducer
Figure 11. Chart. Major items requiring attention during construction-initial
curing period
Figure 12. Equation. Temperature of fresh concrete from ingredients
Figure 13. Equation. Frequency of application of evaporation reducer
Figure 14. Chart. Major items requiring attention during construction-final
curing period
Figure 15. Chart. Major features in curing compound practice
Figure 16. Equation. Drying time for curing compound-temperature correction
Figure 17. Equation. Application rate for curing compound-correction
for texturing
Figure 18. Chart. Major features of curing with added water
Figure 19. Chart. Major features of curing with water-retention methods
Figure 20. Chart. Thermal effects
Figure 21. Chart. Considerations pertinent to the termination of curing
Next