Strategic Objective 6 Maintenance and rehabilitation strategy selection and performance prediction

The following boxes are Analysis Outcomes for Objective 6. To see specific analysis projects for each Outcome, click on the corresponding box.

Red Box: A. Performance and efficacy of maintenance and rehabilitation treatments as function of pre-treatment condition. C1 (Critical priority, number 1 in sequence).

Red Box: B. Guidelines for timing and selection of pavement maintenance and rehabilitation options and expected performance impacts of each. C2 (Critical priority, number 2 in sequence).


Priorities

Critical = color-coded red box for critical priority
Very High = color-coded blue box for very high priority
High = color-coded green box for high priority
Sequence = number-coded boxes 1, 2, or 3 in sequence

Note: Sequence numbers denote the order in which Analysis Outcomes should be addressed for a given Objective. Analysis Outcomes with the same sequence number can be addressed at the same time.

Back to Analysis

 