|
Cameras | Incidents & Weather | Construction | Truck Restrictions | Weather Stations | Snow Zones Incidents & Weather Highway | Details |
---|
I-205 MP 14.58 - 19.61
I-205, 15 miles North of Interstate 5 Incident #: 58138 | Informational only Information Comments: The I-205 bike/ped path is closed between Clackamas Town Center and Division Street due to TriMet's light-rail project. Due to TriMet's light rail construction along I-205, the multi-use path is closed to thru traffic between SE Caruthers Street, just north of SE Division Street, and SE Sunnyside Road adjacent to Clackamas Town Center. The path is expected to reopen, with improvements, early in 2009.
An alternative route that parallels I-205 is available for pedestrians, cyclists and people using mobility devices. To learn more about the bike path detour, click on the TriMet link below Click here for additional information Public Contact: TriMet Phone: (503) 962-2150 Last Updated: 05/23/2008 1:36 pm <return to map | ORE224 MP 49.97 ORE224, Ripplebrook Ranger Station Incident #: 58931 | Informational only Information Comments: ORE 224 becomes Forest Service Road 46 at the Ripplebrook Ranger Station. For road conditions beyond this point, see the Forest Service web site. Click here for additional information Public Contact: Clackamas River Ranger District Phone: (503) 630-6861 Last Updated: 08/18/2008 12:30 pm <return to map | ConstructionHighway | Details |
---|
I-5 MP 251.21 - 252.08
I-5, 3 miles South of Intersection with ORE22, in Salem Incident #:69224 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) 1 Lane Comments: Modernization: one lane, ramps, and right shoulder of NB traffic periodically interrupted by closure or flagging at night from 8:00pm to 6:00am daily. Grading, drainage, structures, paving, signing, illumination, signals and roadside development project
Public Contact: District 3 Office Phone: (503) 986-2900 Last Updated: 05/08/2009 09:28 am <return to map | I-5 MP 305 - 307
I-5, 3 miles South of Oregon Washington Border Incident #:63811 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Southbound) Median , All Lanes , Shoulder (Northbound) Median , All Lanes , Shoulder Comments: Intermittent lane closures are expected on local streets and ramps during the week of May 9-16. A contractor is working on a project to widen I-5 between Victory Boulevard and Lombard Street. The 1.2-mile project includes adding a third lane to southbound I-5, constructing a new southbound entrance ramp bridge at Columbia Boulevard, widening bridges and adding shoulders to northbound I-5. Lane closures on I-5 will only take place during nighttime hours, generally between 8 p.m. and 5 a.m.
The afternoon of Monday, May 11, the contractor will open the newly constructed Columbia Boulevard entrance to I-5 southbound. The contractor may temporarily close the Columbia Boulevard on-ramp to remove barricades before the opening of the newly constructed entrance ramp.
During the week of May 9-16, the contractor will work on building new bridge alignments and installing illumination throughout the project area. During daytime work hours there will be periodic lane closures on Schmeer Road, Columbia Boulevard and the Columbia Boulevard to I-5 southbound on-ramp. Watch for shoulder closures on the northbound I-5 Victory Boulevard off-ramp. Flaggers will be on site to direct motorists and bicyclists during these lane closures.
Please be aware that work zone speed limits are enforced by enhanced police traffic patrols in the area.
Click the link below for more information.
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 1:30 pm <return to map | I-84 MP 43.9 - 64
I-84, Cascade Locks Incident #:60772 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder Comments: Watch for roadside crews and construction equipment on I-84 at Moffett Creek, Cascade Locks, Moody Avenue, Herman Creek & 2nd St. in Hood River. A contractor is working on a project to replace and repair several bridges along Interstate 84 between Cascade Locks and Hood River.
**I-84 at Cascade Locks interchange (milepost 44): Westbound lanes are on a temporary alignment over U.S. 30 (Wa-Na-Pa Street). Expect daytime one-way traffic controlled by flaggers on the roadway connecting U.S. 30 to S.E. Frontage Road (beneath I-84). Watch for roadside crews and construction equipment and construction vehicles exiting and entering the westbound travel lanes of I-84.
**I-84 over Moody Avenue (milepost 44): Watch for roadside work crews and construction equipment.
**I-84 over Herman Creek connector - Wyeth Road (milepost 47): Expect single-lane traffic eastbound and westbound over U.S. 30 Wyeth Road until spring 2009. Watch for roadside crews and construction equipment. On Wyeth Road at I-84, watch for daytime one-way traffic controlled by flaggers.
**I-84 eastbound over UPRR (milepost 63.5): Expect daytime single-lane closures. Watch for roadside work crews and construction equipment entering and exiting the travel lanes.
**Second Street over UPRR at Hood River: Watch for roadside crews and construction equipment under the bridge. Expect temporary reduction in local parking availability.
**I-84 at Moffett Creek: Eastbound lanes are on a temporary alignment. Watch for daytime single-lane closures eastbound. Watch for roadside work crews and construction equipment entering and exiting the eastbound and westbound travel lanes of I-84. Please drive carefully through the work zone.
**I-84 at the Dodson Interchange: Watch for construction vehicles entering and exiting the traffic lanes. Please drive carefully through the work zone.
Click on the link below for more information.
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 12:55 pm <return to map | ORE6 MP 33.25 - 34.25
ORE6, Tillamook - Washington County Line Incident #:68090 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder Comments: Lane closures expected for the week of May 9-16 during daytime hours. Motorists will be directed by flaggers. Expect up to 20 min. delays. A contractor is working on a project to build retaining walls on Highway 6 at the site of three landslides near the summit from mile post 33.25 to 34.25. Work will primarily take place on the north side of the highway. This project also includes grinding, paving and striping in the project area. Motorists may experience up to 20-minute delays on Highway 6 during work hours.
During the week of Monday, May 11, to Friday, May 15, the contractor will be drilling holes, setting beams and pouring concrete at mile post 34.25. Please watch for drilling equipment in the roadway during work hours. During daytime work hours, there will be intermittent lane closures in both directions of Highway 6.
Flaggers will direct motorists during the closures. Daytime work hours are from 7 a.m. to 5 p.m. On Friday, May 15, the contractor will finish work by 3 p.m. to accommodate weekend traffic in the area.
Please pay extra attention to construction workers on the shoulders when driving through the work zone.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 12:52 pm <return to map | ORE18 MP 23.82 - 26.28
ORE18, 1 mile East of Valley Junction Incident #:57101 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder Comments: Modernization Project: 2 lane, 2 way traffic periodically interrupted by flagging at night from Mon 6:00am to Fri 6:00am. Grading, drainage, structures, signing, illumination and roadside development project.
Public Contact: Area 3 Office Phone: (503) 986-2900 Last Updated: 05/08/2009 09:27 am <return to map | ORE22 MP 11.83 - 14.08
ORE22, 10 miles East of Intersection with I-5, in Salem Incident #:58292 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder Comments: Motorists should expect daytime delays on Cascade Hwy due to a two-way, one-lane, flagger controlled traffic configuration. Public Contact: Area 3 Office Phone: (503) 986-2900 Last Updated: 05/08/2009 09:26 am <return to map | ORE213 MP 0 - 3.9
ORE213, Oregon City Incident #:61832 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder Comments: Paving will require day and nighttime lane closures the week of Sunday, May 10 through Friday, May 15. A contractor is working on a project to repave Highway 213 (Cascade Highway South) from Interstate 205 to Conway Drive in Oregon City. The work includes roadway repairs, repaving, new signs, and updated signals.
A contractor is working on a project to repave Highway 213 (Cascade Highway South) from Interstate 205 to Conway Drive in Oregon City. The work includes roadway repairs, repaving, new signs, and updated signals.
Nighttime paving on northbound Highway 213 between Meyers Road and Molalla Avenue will require a single lane closure beginning at 10 p.m. Friday, May 8, to 9 a.m. Saturday, May 9. Flaggers will control one-way traffic on Highway 213; during the paving work motorists traveling northbound will use the southbound lane.
Monday, May 11, through Friday, May 15, the contractor will replace sidewalks between Beavercreek Road and Conway during daytime work hours. Nighttime work will include paving and barrier placement starting from 7:30 p.m. to 5:30 a.m. nightly. Motorists will experience lane closures and short delays during the daytime and nighttime work hours.
Motorists should be aware that police will be carrying out enhanced traffic enforcement in the work zone. Please note the posted speed is 45 mph until the work is complete.
Click the link below for more information.
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 1:22 pm <return to map | ORE217 MP 1.47 - 0
ORE217, 1 mile South of US 26 Incident #:68093 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) Median , All Lanes , Shoulder Comments: Be aware of new lane configurations on Highway 217 northbound to U.S. 26. A contractor is working on a project to add a third through-lane to Highway 217 northbound between Highway 8 (Tualatin-Valley Highway) and U.S. 26 (Sunset Highway). This project also includes building retaining walls and improving drainage on the highway, lengthening the Wilshire St. overpass, and paving and striping the project area and the Highway 217/U.S. 26 interchange ramps. Lane closures on Highway 217 will only take place during nighttime hours of 7 p.m. to 5 a.m.
The contractor recently completed installation of temporary concrete barriers and striping through the project area. Motorists should watch for temporary lane restrictions as well as permanent changes to the lane configurations. These changes included shifting northbound traffic to the west to create a work zone along the right shoulder.
Additionally, only one lane will connect Highway 217 northbound to U.S. 26 eastbound. The center lane of Highway 217 northbound will now only continue north to Barnes Rd. and will not connect to U.S. 26 eastbound. These new lane configurations will be in place for the duration of the project.
The contractor will continue to prepare the project area and begin building a retaining wall on Highway 217 near the Walker Rd. on-ramp north to the Wilshire Street overpass the week of Monday, May 11, to Friday, May 15. This work will take place during daytime work hours from 7:30 a.m. to 4 p.m.
The contractor has canceled rock blasting until further notice. Once the rock blasting is scheduled, ODOT will issue traffic advisories to warn motorists and neighbors of the rock blasting.
Please be aware that work zone speed limits will be enforced by enhanced police traffic patrols in the area. Fines will double in this construction zone.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 1:23 pm <return to map | ORE99E MP .89 - 1.69
ORE99E, Portland Incident #:33312 | Estimated delay under 20 minutes Construction Work Comments: Ramp to Hwy 99E southbound, south of the viaducts will be closed between S.E. Division Pl. & S.E. Ivon until July. Motorists will be detoured to S.E. 4th Ave. Work is under way on a project to replace the Martin Luther King, Jr. Boulevard and Grand
Avenue viaducts on Highway 99E. Lane closures will only take place during nighttime hours. Normal daytime work hours are 7 a.m. to 5 p.m., Monday, May 11, to Friday, May 15.
On Monday, May 11, the contractor will close the on and off-ramp to southbound Highway 99E, south of the viaducts between S.E. Division Place and S.E. Ivon Street. The on and off-ramp will remain open during the closure. Motorists traveling to and from Highway 99E southbound will be detoured to S.E. 4th Avenue. The partial on and off-ramp closure will be in effect until July.
The contractor will continue working on the construction of bridge footings and columns for the new southbound Highway 99E (MLK Jr. Boulevard) bridge structure during daytime work hours. False work construction will require intermittent one-way traffic controlled by flaggers on Division Street between SE 3rd Avenue and SE 7th Avenue.
The column and footings construction work will require the closure of Caruthers Street under the viaducts. Bikes and motor traffic will be detoured around the construction work during the Caruthers Street closure.
The contractor has closed the ramp connecting westbound Division Street to northbound Highway 99E (Grand Avenue). This ramp is scheduled to be closed until 2010 to allow crews to remove the existing northbound viaduct and build a new structure. During the ramp closure, motorists will be directed to take Division Street to northbound 7th Avenue to westbound Clay Street to northbound Highway 99E (Grand Avenue).
Please be alert to enhanced police traffic patrols in the Highway 99E viaduct replacement
Click the link below for more information.
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 1:28 pm <return to map | ORE99E MP 11.3 - 12.2
ORE99E, Gladstone Incident #:58555 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder Comments: Expect intermittent lane closures in both directions for this project on McLoughlin Boulevard in Oregon City. A contractor for Oregon City and ODOT is working on a project on McLoughlin Boulevard (Highway 99E) between 10th Street and Dunes Drive. The project includes paving, new signals, I-205 ramp modifications and pedestrian walkway upgrades, among other improvements.
Expect intermittent lane closures in both directions for this project on McLoughlin Boulevard in Oregon City.
For more information, click on the link below.
Click here for additional information Public Contact: Aleta Froman-Goodrich, Oregon City Phone: (503) 496-1570 Last Updated: 10/03/2008 3:51 pm <return to map | US20 MP 14.68 - 27.75
US20, 8 miles West of Eddyville Incident #:37726 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) All Lanes , Shoulder (Eastbound) All Lanes , Shoulder Comments: On-going road work will cause delays Monday through Friday 7 AM to 5 PM. One lane closure with pilot car leading traffic in the other lane. Public Contact: Area 4 Project Manager Phone: (541) 757-4104 Last Updated: 05/08/2009 2:56 pm <return to map | US26 MP 23.6 US26, Sandy Incident #:68588 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder Comments: Eastbound lanes will be shifted to the left for a slide repair project in the city of Sandy. A contractor is working on an emergency slide repair project on the eastbound direction of U.S. 26 (Mt. Hood Highway) in Sandy at mile post 23.6 between Ruben Lane and University Avenue. Work includes building a stone embankment to repair the road base in the slide area and restoring damaged roadway, curb, guardrail and shoulder.
The right lane of eastbound U.S. 26 has been closed to allow the contractor to work during the slide repair project.
Traffic has been shifted to the left, with two eastbound lanes maintained by using the median.
During the week of May 11-14, the contractor will continue constructing the stone embankment and installation of a waterline. Please watch for crews along the roadway and trucks entering the highway.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 1:28 pm <return to map | US26 MP 37.26 - 42.25
US26, 6 miles East of Cherryville Incident #:60267 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder Comments: Traffic is not expected to be impacted during the week of May 9-16. A contractor is working on a safety project to add a left-turn lane on U.S. 26 from Wildwood to Wemme near Welches. The project also will repave Mt. Hood Highway between the Salmon River Bridge and E. Lolo Pass Road.
No work is planned for the week of Saturday, May 9 through Friday, May 16. The contractor will return in the next few weeks to finish paving and striping.
Please watch for construction activities when driving through the work zone on U.S 26.
Click on the link below for more information.
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 12:51 pm <return to map | US26 MP 64.29 - 57.16
US26, 2 miles East of Cornelious Pass Exit Incident #:70109 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound) Median , All Lanes , Shoulder Comments: Motorists should be aware of temporary striping and lane shifts in the project area. A contractor has started work on a paving project on U.S. 26 (Sunset Highway) from 185th Ave. to Glencoe Rd. In addition to paving both directions of the highway and the ramps, work will include adding cable barrier in the center median, repairing guardrail, upgrading highway signs, and striping. Work on the project will primarily take place at night.
For the week of Monday, May 11, through Friday, May 15, the contractor will be excavating and performing drainage and guardrail work under the Helvetia and Glencoe structures. This work will take place during daytime work hours. Nighttime work will consist of moving barricades in the project area. Motorists should expect lane closures during the night work.
For more information:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 1:29 pm <return to map | US30 MP 2 - 3.9
US30, Portland Incident #:67205 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Eastbound) Median , All Lanes , Shoulder (Westbound) Median , All Lanes , Shoulder Comments: Expect eastbound US 30/Yeon lane closures May 9-16 for pavement repair. A contractor is working to repave U.S. 30/Yeon Avenue from Nicolai Street to Kittridge Avenue. Work includes removing the top layer of existing asphalt and installing a new asphalt surface. New pavement striping will be added. Current substandard sidewalks ramps will be replaced. Daytime work hours are from 7 a.m. to 4 p.m. All work requiring lane closures on the highway will take place during nighttime hours from 7 p.m. to 5:30 a.m.
During the week of Monday, May 11, to Friday, May 15, the contractor will perform pavement repair requiring nighttime lane closures on U.S. 30. This is in preparation for paving activities, which will begin in the upcoming weeks.
Please be alert to enhanced police traffic patrols in the U.S. 30 Yeon Avenue Preservation work area.
For more information please visit:
Click here for additional information Public Contact: Kimberly Dinwiddie Phone: (503) 731-8281 Last Updated: 05/08/2009 1:30 pm <return to map | US101 MP 39.5 US101, 6 miles North of Nehalem Incident #:69328 | Estimated delay of 20 minutes - 2 hours Construction Work Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder Comments: Emergency bridge work. Flaggers will control traffic for one lane opening until further notice. 25 MPH through the work zone. Public Contact: ODOT/NWTOC Salem Phone: (800) 977-6368 Last Updated: 04/17/2009 10:15 am <return to map | US101 MP 39.5 US101, 6 miles North of Nehalem Incident #:69982 | Estimated delay under 20 minutes Construction Work Comments: Crews will be working on the Necarney Creek Bridge for repairs. Traffic is single lane with flaggers. Motorists should use caution and drive carefully This project at Oswald West State park is an emergency repair of damange caused by a vehicle crash. the work consists of repairing damaged bridge deck and bridge rail. Traffic will be single lane and flagger - controlled 24 hours per day, seven days per week. Expect delays. Use extreme caution.
Public Contact: District 1 Office Phone: (503) 325-7222 Last Updated: 05/01/2009 10:17 am <return to map | US101 MP 63.82 - 64.06
US101, Tillamook Incident #:69983 | Estimated delay under 20 minutes Construction Work Comments: Crews are working on highway improvements on US101 at its intersection with Latimer Road in Tillamook. Please drive carefully and use caution. This project consists of installing turning lanes, traffic signals, and other miscellaneous highway improvements on US 101 at the intersection with Latimer Road in Tillamook. No work is scheduled for this week. The project is scheduled to be completed in June, 2009.
Public Contact: District 1 Office Phone: (503) 325-7222 Last Updated: 05/01/2009 10:27 am <return to map | US101 MP 133.65 - 133.86
US101, 7 miles North of Newport Incident #:60756 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder Comments: Miscellaneous roadwork may require one lane of traffic be closed during working hours. Delays are expected to be 5 minutes or less. Public Contact: Area 4 Project Manager Phone: (541) 757-4104 Last Updated: 05/07/2009 4:21 pm <return to map | US101 MP 4.51 - 5.31
US101, Astoria Incident #:65352 | Estimated delay under 20 minutes Construction Work Lanes Affected: (Northbound) Median , All Lanes , Shoulder (Southbound) Median , All Lanes , Shoulder Comments: Repairs on the Youngs Bay Bridge continue. Expect full closure of bridge Sunday through Thursday nights 9 PM and 6 AM. Use posted detour. Repairs consist of upgrading electrical and mechanical components and painting the bridge. Detour is provided along US 101 Business and West Marine Drive over the Old Youngs Bay Bridge and Lewis and Clark Bridge. Expect minor delays. Work is scheduled to complete in April 2009.
Public Contact: Astoria Project Manager Phone: (503) 325-4732 Last Updated: 05/01/2009 12:16 pm <return to map | Trucking (Commercial Vehicle) RestrictionsHighway | Details |
---|
99 MP 1.05 ORE99E, Portland Incident #: 52196 | Informational only Commercial Vehicle Information Details: OR99E SB Union Av. Viaduct OR99E SB Union Av. Viaduct at MP1.05 under City of Portland jurisdiction on MLK Blvd is restricted to single vehicles only and legal axle weights with a maximum GVW of 50,000 lbs. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-5 MP 234.69 I-5, Albany Incident #: 69315 | Informational only Commercial Vehicle Information Details: I-5 NB MP 234 (OR99E on-ramp to I-5 NB) Effective May 3, 2009 the on-ramp from OR99E to I-5 NB will be closed between the hours of 6 AM to 12 PM on Sundays only. There will be a signed detour route in place using Century Drive Frontage Rd. to I-5. Estimated date of completion is May 31, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-5 MP 302.6 I-5, 1 mile North of I-405 North Interchange Incident #: 69016 | Informational only Commercial Vehicle Information Details: I-5 MP 302.60 SB Effective May 15, 2009 this section of I-5 will be closed between the hours of 11 PM and 9 AM for two nights only. Estimated date of completion is May 17, 2009South Bound I-5 traffic will be detoured to I-405 SB. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-5 MP 305.44 - 306.7
I-5, 3 miles South of Oregon Washington Border Incident #: 56401 | Informational only Commercial Vehicle Information Details: I-5 MP 305.44 to MP 306.70 NB & SB Effective April 21, 2008 this section of I-5 will be restricted to 14 ft. 00 in. in width between the hours of 11 PM to 5 AM. In addition the height will be restricted to 15 ft 11 in. SB & 15 ft. 08 in. NB. 24 hours per day. Estimated date of completion is October 31, 2010. In addition, beginning June 1, 2008 this section of I-5 will be closed intermittently between the hours of 11:30 PM and 4:30 AM. There will be signed detour routes in place North Bound & Southbound. SB: Take Exit 307 to N. Marine Dr, OR99E (MLK Blvd); US30 Bypass (N. Lombard), re-enter I-5 at exit 305. NB take exit 305-A to US30 Bypass (N. Lombard), OR99E (MLK Blvd.), Marine DR & re-enter I-5 at exit 307. Estimated date of completion is June 19, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-5 MP 305.93 I-5, 2 miles South of Oregon Washington Border Incident #: 57199 | Informational only Commercial Vehicle Information Details: I-5 MP 305.93 SB on ramp from Columbia Blvd Effective May 21, 2008 the SB on ramp from Columbia blvd to I-5 will be restricted to 17 ft. 00 in. in width. Estimated date of completion is October 31, 2010 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-5 MP 306.7 - 305.44
I-5, 1 mile South of Oregon Washington Border Incident #: 56402 | Informational only Commercial Vehicle Information Details: I-5 MP 305.44 to MP 306.70 NB & SB Effective April 21, 2008 this section of I-5 will be restricted to 14 ft. 00 in. in width between the hours of 11 PM to 5 AM. In addition the height will be restricted to 15 ft 11 in. SB & 15 ft. 08 in. NB. 24 hours per day. Estimated date of completion is October 31, 2010. In addition, beginning June 1, 2008 this section of I-5 will be closed intermittently between the hours of 11:30 PM and 4:30 AM. There will be signed detour routes in place North Bound & Southbound. SB: Take Exit 307 to N. Marine Dr, OR99E (MLK Blvd); US30 Bypass (N. Lombard), re-enter I-5 at exit 305. NB take exit 305-A to US30 Bypass (N. Lombard), OR99E (MLK Blvd.), Marine DR & re-enter I-5 at exit 307. Estimated date of completion is June 19, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 14.76 I-84, 2 miles East of The Gresham Exit Incident #: 69316 | Informational only Commercial Vehicle Information Details: I-84 MP 14.76 (207th Ave./Fairview Parkway on-ramp to I-84 EB) Effective May 9, 2009 the on-ramp from 207th Ave./Fairview Parkway will be closed between the hours of 6 AM & 12 PM for one day only. There will be a signed detour route authorizing Sandy Blvd to 238th, to I-84 EB. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 15.65 I-84, 1 mile West of Troutdale Incident #: 69317 | Informational only Commercial Vehicle Information Details: I-84 MP 15.65 (238th Ave. on-ramp to I-84 WB) Effective May 9, 2009 the on-ramp from 238th to I-84 WB will be closed between the hours of 6 AM and 12 PM for one day only. There will be a signed detour authorizing Sandy Blvd to 207th/Fairview Parkway to I-84 WB. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 17.68 I-84, 1 mile East of Troutdale Incident #: 46171 | Informational only Commercial Vehicle Information Details: I-84 MP 17.68 WB (Sandy River Bridge) I-84 MP 17.68 WB only Sandy River Bridge is restricted to STP's beyond Wt. Table 5. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 21.9 - 22.36
I-84, 5 miles East of Troutdale Incident #: 70177 | Informational only Commercial Vehicle Information Details: I-84 MP 21.10 to MP 22.20 Effective May 19, 2009, between the hours of 6:00 am and 4:30 pm, this section of I-84 will be restricted to 17 feet 00 in. in width. Estimated date of completion is May 21, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 22.29 - 21.89
I-84, 5 miles East of Troutdale Incident #: 70122 | Informational only Commercial Vehicle Information Details: I-84 MP 22.20 to MP 21.10 Effective May 19, 2009, between the hours of 6:00 am and 4:30 pm, this section of I-84 will be restricted to 17 feet 00 in. in width and 15 feet 05 in. in height. All loads over 15 feet 05 in. in height will need to go up & over at exit 22. Estimated date of completion is May 21, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 37.6 - 40.17
I-84, 7 miles West of Cascade Locks Incident #: 69409 | Informational only Commercial Vehicle Information Details: I-84 MP 38 to MP 40 EB Effective April 21, 2009 this section of I-84 will be restricted to 16 feet 00 in. in width. Estimated date of completion is September 4, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 40.18 - 38.98
I-84, 5 miles West of Cascade Locks Incident #: 70231 | Informational only Commercial Vehicle Information Details: I-84 MP 40 to MP 38 WB Effective May 7, 2009, this section of I-84 will be restricted to 16 feet 00 in. in width. Estimated date of completion is September 4, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 46.35 - 47.62
I-84, 1 mile East of Cascade Locks Incident #: 61692 | Informational only Commercial Vehicle Information Details: I-84 MP 47.00 to MP 48.00 EB & WB Effective September 15, 2008 this section of I-84 will be restricted to 16 feet 00 in. in width. Estimated date of completion is July 3, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | I-84 MP 48.08 - 47.31
I-84, 3 miles East of Cascade Locks Incident #: 61693 | Informational only Commercial Vehicle Information Details: I-84 MP 47.00 to MP 48.00 EB & WB Effective September 15, 2008 this section of I-84 will be restricted to 16 feet 00 in. in width. Estimated date of completion is July 3, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE6 MP 32.88 ORE6, Tillamook - Washington County Line Incident #: 67462 | Informational only Commercial Vehicle Information Details: OR6 MP 33.00 to MP 34.50 EB & WB Effective March 9, 2009 this section of OR6 will be restricted to 18 feet 00 in. in width. Estimated date of completion is October 15, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE18 MP 46.75 ORE18, McMinnville Incident #: 69657 | Informational only Commercial Vehicle Information Details: OR18 MP Y46.75 (OR18 Spur -Three Mile Lane) EB Effective May 11, 2009 this section of OR18 Spur will be restricted to 10 feet 00 in. in width between the hours of 8:30 PM and 5:30 AM. Estimated date of completion is May 15, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE18 MP 51.57 ORE18, 1 mile West of Intersection with Pacific Highway West ORE99W Incident #: 46128 | Informational only Commercial Vehicle Information Details: OR18 MP 51.57 Yamhill River near Dayton MP 51.57 Yamhill River Bridge near Dayton is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE22 MP 2.82 ORE22, 1 mile East of Intersection with I-5, in Salem Incident #: 69401 | Informational only Commercial Vehicle Information Details: OR22 MP 2.82 Hwy #162 (Crossing under Cordon Rd) Effective May 11, 2009 this section of OR22 will be restricted to 14 feet 00 in. in width and 15 feet 06 in. in height in between the hours of 8 AM and 4 PM. Estimated date of completion is May 15, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE22 MP 10.49 ORE22, 10 miles East of Intersection with Oregon Coast Highway US101 Incident #: 46173 | Informational only Commercial Vehicle Information Details: OR22 MP 10.49 Louie Creek OR22 Louie Creek Bridge at MP10.49 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle; Weight Table 3 only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE22 MP 10.66 ORE22, Tillamook - Yamhill County Line Incident #: 46174 | Informational only Commercial Vehicle Information Details: OR22 MP 10.66 Louie Creek OR22 Louie Creek Bridge at MP10.66 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle; Weight Table 3 only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE22 MP 13.33 ORE22, 10 miles West of Mehama Incident #: 57198 | Informational only Commercial Vehicle Information Details: OR22 MP 13.33 WB Ramps (Cascade Hwy) Effective September 8, 2008 the WB off ramp from OR22 to Cascade Hwy and the WB on ramp from Cascade Hwy to OR22 will be closed. Estimated date of completion is July 31, 2010. In addition beginning July 1,2008 through August 15, 2010 Cascade Hwy will be restricted 12 ft. 00 in. in width crossing under OR22. There will be a signed detour route in place consisting of Fern Ridge, Shaff, and Golf Club Rd. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE22 MP 30.03 ORE22, Mill City Incident #: 46130 | Informational only Commercial Vehicle Information Details: OR22 Mill City Bridge (not on main OR22) Bridge actually on conn 1g2ay 1c30.29 MP C30.29 - 1st Street crossing over the Santiam River is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE43 MP 11.43 ORE43, Interstate 205 Incident #: 67186 | Informational only Commercial Vehicle Information Details: OR43 MP 11.43 Arch Bridge Effective February 23, 2009 the Arch Bridge on OR43 at MP11.43 will be restricted to legal axle weights and a maximum of 28,000 lbs GVW. No commercial trucks allowed. Estimated date of completion is November 1, 2011. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE53 MP .11 ORE53, Intersection with Sunset Highway US26 Incident #: 46165 | Informational only Commercial Vehicle Information Details: OR53 MP 0.11 North Fork Necanicum OR53 North Fork Necanicum Creek Bridge at MP0.11 is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle; Weight Table 3. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE53 MP 5.981 ORE53, 6 miles South of Intersection with Sunset Highway US26 Incident #: 46164 | Informational only Commercial Vehicle Information Details: OR53 MP 5.98 Jack Horner Creek OR53 Jack Horner Creek Bridge at MP5.98 is restricted to 20,000 lbs. single axle, 40,000 lbs tandem axle; Weight Table 3. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE99 MP 1 - 1.49
ORE99E, Portland Incident #: 49845 | Informational only Commercial Vehicle Information Details: OR99E SB MP 0.90 to MP 1.50 (MLK/Union Ave Viaduct) Effective April 17, 2007, this section of OR99E in SE Portland will be restricted to a maximum of 21 ft. 00 in. in width across two traffic lanes. The bridge is restricted to less than 80,000 lbs. (see bridge list). Estimated date of completion is April, 2010. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE99 MP 12.2 ORE99W, Tigard Incident #: 46135 | Informational only Commercial Vehicle Information Details: OR99W SB MP 12.20 Tualatin River Bridge MP 12.20 Tualatin River Bridge in King City is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE99 MP 24.5 ORE99E, Aurora Incident #: 69807 | Informational only Commercial Vehicle Information Details: OR(99E (Hwy #81 - South of Canby) SB This section of OR99E will be restricted to 16 feet 00 in. in width. Estimated date of completion is July 10, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE130 MP 3.23 ORE130, 3 miles East of Intersection with Pacific Coast Highway US101 Incident #: 46141 | Informational only Commercial Vehicle Information Details: OR130 MP 3.23 Panther Creek MP 3.23 Panther Creek 3.23 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE130 MP 3.6 ORE130, 4 miles East of Intersection with Pacific Coast Highway US101 Incident #: 46142 | Informational only Commercial Vehicle Information Details: OR130 MP 3.60 Squaw Creek MP 3.60 Squaw Creek 3.60 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE130 MP 3.82 ORE130, 4 miles East of Intersection with Pacific Coast Highway US101 Incident #: 46143 | Informational only Commercial Vehicle Information Details: OR130 MP 3.82 Austin Creek MP 3.82 Austin Creek 3.82 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE130 MP 4.15 ORE130, 4 miles East of Intersection with Pacific Coast Highway US101 Incident #: 46144 | Informational only Commercial Vehicle Information Details: OR130 MP 4.15 Little Nestucca MP 4.15 Little Nestucca River 4.15 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE130 MP 4.76 ORE130, 5 miles West of Intersection with Three Rivers Highway ORE22 Incident #: 46145 | Informational only Commercial Vehicle Information Details: OR130 MP 4.76 Bear Creek MP 4.76 Bear Creek 4.76 miles east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE153 MP 3.98 - 4.57
ORE153, 2 miles West of Amity Incident #: 69805 | Informational only Commercial Vehicle Information Details: OR153 (Bellevue-Hopewell hwy #153) EB & WB Effective May 30, 2009 this section of OR153 Bellevue-Hopewell hwy will be closed. Estimated date of completion is June 1, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE153 MP 4.57 - 3.98
ORE153, 1 mile West of Amity Incident #: 69806 | Informational only Commercial Vehicle Information Details: OR153 (Bellevue-Hopewell hwy #153) EB & WB Effective May 30, 2009 this section of OR153 Bellevue-Hopewell hwy will be closed. Estimated date of completion is June 1, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE153 MP 5.88 ORE153, Amity Incident #: 46177 | Informational only Commercial Vehicle Information Details: OR153 MP 5.88 Bellvue-Hopewell Hwy OR153 MP 5.88 Salt Creek Bridge (Ash Swale) just west of Amity is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle, Wt. Table 3 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE202 MP 43.7 ORE202, 2 miles North of Mist Incident #: 46137 | Informational only Commercial Vehicle Information Details: OR202 MP 43.70 Banzer Bridge MP 43.70 Banzer Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads. Vehicles exceeding these weights may cross the bridge if they hug the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | ORE219 MP 23.46 ORE219, 3 miles South of Newberg Incident #: 46139 | Informational only Commercial Vehicle Information Details: OR219 MP 23.46 Willamette River near Newberg MP 23.46 Willamette River Bridge near Newberg is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3 Non-Divisible loads Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US20 MP 15.69 US20, 7 miles West of Eddyville Incident #: 70262 | Informational only Commercial Vehicle Information Details: US20 (Hwy #033) MP 15.69 at Elk City Rd EB & WB Effective July 6, 2009 this section of US20 will be restricted to 13 feet 06 in. in width. In addition Elk City Rd will be closed to all traffic. Estimated date of completion is July 21, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US20 MP 23.38 US20, Eddyville Incident #: 46116 | Informational only Commercial Vehicle Information Details: US20 (Corvallis-Newport Hwy) MP 23.38 Effective May 19, 2006 at MP 23.38 Yaquina River Bridge near Eddyville is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads. Vehicles exceeding these weights may cross the bridge if they straddle the centerline, do not exceed 25 MPH and are the only vehicle on the bridge. Certified flaggers are required to stop traffic. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 2.24 US26, 2 miles East of Intersection with Oregon Coast Highway US101 Incident #: 46161 | Informational only Commercial Vehicle Information Details: US26 MP 2.24 Volmer Creek US26 Volmer Creek Bridge at MP2.24 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle; Weight Table 3 only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 3.26 US26, 3 miles East of Intersection with Oregon Coast Highway US101 Incident #: 46162 | Informational only Commercial Vehicle Information Details: US26 MP 3.26 Johnson Creek US26 Johnson Creek Bridge at MP3.26 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem axle; Weight Table 3 only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 23.87 - 24.61
US26, Sandy Incident #: 69013 | Informational only Commercial Vehicle Information Details: US26 (Hwy #026) MP 23.87 to MP 24.61 EB & WB Effective July 9, 2009 this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 6:30 PM and 10 PM for one night only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 24.631 - 23.87
US26, Sandy Incident #: 69014 | Informational only Commercial Vehicle Information Details: US26 (Hwy #026) MP 23.87 to MP 24.61 EB & WB Effective July 9, 2009 this section of US26 will be restricted to 11 feet 00 in. in width between the hours of 6:30 PM and 10 PM for one night only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 56.98 US26, 1 mile East of North Plains Incident #: 68677 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) Glencoe Rd Exit 57 EB Effective May 12, 2009 the on and off ramps at Glencoe Rd Exit 57 will be closed between the hours of 9:30 PM and 5:00 AM on the following dates: May 12, 2009; June 15, 16, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 57.16 - 64.41
US26, 1 mile East of North Plains Incident #: 69407 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) MP 57 to MP 65 EB Effective May 27, 2009 this section of I-5 will be restricted to 15 feet 00 in. in height between the hours of 9 PM and 6 AM. Estimated date of completion is June 5, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 57.33 US26, 1 mile East of North Plains Incident #: 68678 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) Glencoe Rd Exit WB Effective May 11, 2009 the on and off ramps at Glencoe Rd Exit 57 will be closed both between the hours of 9:30 PM and 5:00 AM on the following dates: May 11, 2009; June 2, 3, 4, 5, & 30, 2009; July 1, 2 & 3, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 61.06 US26, 1 mile West of Cornelious Pass Exit Incident #: 69402 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) Helvetia rd Exit 61 EB Effective May 13 the on and off ramps from Helvetia Rd (Exit 61)will be closed between the hours of 9:30 PM and 5 AM on the following dates: May 13th & 29th, 2009; June 17th & 18th, 2009. The height will be restricted to 17 feet 01 in. in height on the same dates. .In addition the exit ramp will be closed on June 13, 2009 between the hours of 8 AM and 12:00 PM for one day only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 62.45 US26, Cornelious Pass Exit Incident #: 69405 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) Cornelius Pass Rd. - Exit 62 WB Effective May 15 , 2009 the on and off ramps at Cornelius Pass Rd (Exit 62) will be closed between the hours of 9:30 PM and 5 AM on the following dates: May 15th & 26th, 2009; June 23rd through June 25th, 2009. In addition the height will be restricted to 16 feet 08 in. in height. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 62.46 US26, Cornelious Pass Exit Incident #: 69404 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) Cornelius Pass Rd. - Exit 62 EB Effective May 18 , 2009 the on and off ramps at Cornelius Pass Rd (Exit 62) will be closed between the hours of 9:30 PM and 5 AM on the following dates: May 18th & 27th, 2009; June 19th, 2009. In addition the height will be restricted to 16 feet 11 in. in height. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 64.28 US26, 2 miles East of Cornelious Pass Exit Incident #: 69403 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) 185th Ave. Exit 64 WB Effective May 20, 2009 the on and off ramp at 185th Ave. (Exit 64) will be closed between the hours of 9:30 PM and 5 AM for one night only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 64.29 US26, 2 miles East of Cornelious Pass Exit Incident #: 69406 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) 185th Ave. Exit 64 EB Effective May 21, 2009 the on and off ramps at 185th Ave. (Exit 64) will be closed between the hours of 9:30 PM and 5 AM for one night only. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US26 MP 64.52 - 57.15
US26, 3 miles East of Cornelious Pass Exit Incident #: 69408 | Informational only Commercial Vehicle Information Details: US26 (Hwy #047) MP 57 to MP 65 WB Effective May 27, 2009 this section of US26 will be restricted to 14 feet 00 in. in height between the hours of 9 PM and 6 AM. Estimated date of completion is June 5, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US30 MP .03 HWY100, Troutdale Incident #: 46184 | Informational only Commercial Vehicle Information Details: US30 MP 0.03 Historic Columbia River Highway Historic US30 MP 0.03 Sandy River Bridge is restricted to 30 tons Gross. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US30 MP 13.14 HWY100, 6 miles East of Corbett Incident #: 46182 | Informational only Commercial Vehicle Information Details: US30 MP 13.14 Historic Columbia River Highway Historic US30 MP13.14 Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Wt. Talbe 1 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US30 MP 20.39 HWY100, 2 miles West of Ainsworth State Park Incident #: 46183 | Informational only Commercial Vehicle Information Details: US30 MP 20.39 Historic Columbia River Highway Historic US30 MP 20.39 Horsetail Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, Wt. Talbe 1 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US30 MP 48.67 US30, Ranier Incident #: 46124 | Informational only Commercial Vehicle Information Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) This bridge belongs to Washington State. Restricted to 21,500 lbs. per axle. No gross weight restriction. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US101 MP 4.78 US101B, 2 miles West of Astoria Incident #: 46123 | Informational only Commercial Vehicle Information Details: US101 Business MP 4.78 (Lewis & Clark Bridge) MP 4.78 Drawbridge crossing Lewis & Clark River (2.5 miles south of Astoria) is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US101 MP 4.91 US101, Astoria Incident #: 68799 | Informational only Commercial Vehicle Information Details: US101 MP 4.50 to MP 5.31 NB & SB Young's Bay Bridge Effective October 15, 2007 the Young's Bay bridge will have intermittent lane and bridge closures between the hours of 9 PM an 6 AM. There will be a signed detour route in place when the bridge is closed for authorized loads to use US101 Business which will accommodate loads up to 10 ft.00 in in width and legal axle weights up to 105,500 lbs (No heavy haul). Estimated date of completion is May 31, 2009. Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | US101 MP 40.71 US101, 4 miles North of Nehalem Incident #: 46120 | Informational only Commercial Vehicle Information Details: US101 MP 40.71 Neahkanie Mtn Chasm Effective November 15, 2004 at MP 40.71 Neahkahnie Mountain Chasm Bridge near Manzanita is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible loads Public Contact: Motor Carrier Over-Dimension Permit Unit Phone: (503) 373-0000 Last Updated: 05/08/2009 7:00 pm <return to map | Automated Road & Weather StationsLocation | Details |
---|
Blue Box Pass (US 26 MP 63.4) | No Current Report From This Station. Last Updated: 05/07/09 04:10 am
<return to map | I-5 at Salem - Enchanted Way | Temp: 52.1F Dew Point: 34.4F Rel. Humidity: 51% Wind Direction: NW Wind (Avg.): 0 mph Wind (Gusts): 1 mph
Last Updated: 05/08/09 10:01 pm
<return to map | I-84 at Cascade Locks | Temp: 50F Dew Point: 44.2F Rel. Humidity: 80% Wind Direction: E Wind (Avg.): 1 mph Wind (Gusts): 3 mph
Last Updated: 05/08/09 10:03 pm
<return to map | I-84 at Troutdale | Temp: 52.7F Dew Point: 35.4F Rel. Humidity: 52% Wind Direction: S Wind (Avg.): 0 mph Wind (Gusts): 1 mph
Last Updated: 05/08/09 10:02 pm
<return to map | OR30 at Bradley State Wayside | Temp: 44F Dew Point: 40F Rel. Humidity: 86% Wind Direction: SW Wind (Avg.): 1 mph Wind (Gusts): 3 mph
Last Updated: 05/08/09 10:02 pm
<return to map | ORE18 at Murphy Hill | Temp: 42.9F Dew Point: 38F Rel. Humidity: 83% Wind Direction: SE Wind (Avg.): 0 mph Wind (Gusts): 0 mph
Last Updated: 05/08/09 10:03 pm
<return to map | US101 at Astoria Columbia River Bridge | Temp: 48.7F Dew Point: 38.7F Rel. Humidity: 68% Wind Direction: N Wind (Avg.): 16 mph Wind (Gusts): 20 mph
Last Updated: 05/08/09 10:04 pm
<return to map | US26 at Brightwood Weigh Station | Temp: 42.5F Dew Point: 40.6F Rel. Humidity: 93% Wind Direction: SE Wind (Avg.): 0 mph Wind (Gusts): 0 mph
Last Updated: 05/08/09 10:01 pm
<return to map | US26 at Quartz Creek | Temp: 43.2F Dew Point: 38.8F Rel. Humidity: 84% Wind Direction: NW Wind (Avg.): 0 mph Wind (Gusts): 0 mph
Last Updated: 05/08/09 10:00 pm
<return to map | US26 at Timber Junction | Temp: 44.5F Dew Point: 39.6F Rel. Humidity: 83% Wind Direction: W Wind (Avg.): 6 mph Wind (Gusts): 7 mph Precipitation: 0.0 in.
Last Updated: 05/08/09 10:01 pm
<return to map | Snow ZonesDetails |
---|
ORE35 MP 60 - MP 83.56 White River - Jct US26 to ODOT Maintenance Station | Minimum Chain Restriction: Carry chains or traction tires regardless of conditions. <return to map | ORE47 MP 0 - MP 11.71 OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist | Minimum Chain Restriction: Carry chains or traction tires regardless of conditions. <return to map | ORE173 MP .12 - MP 5.49 Timberline - US26/Government Camp to Timberline Lodge | Minimum Chain Restriction: Carry chains or traction tires regardless of conditions. <return to map | US26 MP 42.5 - MP 60 Mt Hood (Elev. 3995') - Zigzag to Jct with OR35 | Minimum Chain Restriction: Carry chains or traction tires regardless of conditions. <return to map | US26 MP 37.73 - MP 45.43 Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy | Minimum Chain Restriction: Carry chains or traction tires regardless of conditions. <return to map | US26 MP 57.45 - MP 76 Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct | Minimum Chain Restriction: Carry chains or traction tires regardless of conditions. <return to map | US30 MP 48.31 - MP 61.01 Rainier to Clatskanie | Minimum Chain Restriction: Carry chains or traction tires regardless of conditions. <return to map | |
Printer-Friendly
Contact Us
|