|
Average System Cost Methodology (ASCM)
Concurrent with the WP-07 Supplemental Power Rate
Case, BPA is reviewing and updating the 1984 Average System Cost (ASC) Methodology
in recognition of changes in energy markets and/or policy decisions over the
past 20 years. BPA is proposing to implement a new 2008 ASC Methodology in
parallel with the WP-07 Supplemental Rate Case.
Monthly Rate Tables
Additional background information can be accessed through the links to
the right.
|
|
|
|
|