Lower Redwood Creek Interim Flood Reduction Measures & Floodplain Restoration
An Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) have been completed for the Lower Redwood Creek Interim Flood Reduction Measures & Floodplain Restoration project. The project helped to reduce flooding on Pacific Way in Muir Beach and maintain passage for federally threatened fish in Redwood Creek. The project also restored habitat and the floodplain at the GGNRA Banducci site, further upstream.
Coho salmon are a federally threatend species more...
Did You Know?
A 1-foot sea level rise can lead to shorelines eroding back 100 feet, and increase the chances of a 100-year flood event in low coastal areas to once every 10 years.