Department of Health and Human Services with stylized eagle made up of silhouetted human faces C D C
Department of Health and Human Services
Centers for Disease Control and Prevention

National Institute for Occupational Safety and Health (NIOSH)
Search NIOSH NIOSH Home NIOSH Topics Site Index Databases and Information Resources NIOSH Products Contact Us

NIOSH Program Area:

Office of Compensation Analysis and Support (OCAS)

 

Mound Plant
(Site Profile Number 028)

Location: Miamisburg, Ohio

Also Known As: Dayton Project
                         Miamisburg Closure Project
                         Miamisburg Environmental Management Project (MEMP)
                         Monsanto Research Corp.
                         MOUND
                         Mound Site
                         Units I, III and IV

Site Profile

  1. Introduction
    (Approved September 9, 2004)
    this document in PDF PDF 87 KB (6 pages)


  2. Site Description
    (Page Change Revision July 7, 2006)
    this document in PDF PDF 543 KB (33 pages)

    Page Change Revision Includes: Page change revision initiated for biennial review. Incorporates NIOSH formal review comments. Changes were made to the required language on pages 5 and 6 in Section 2.0. No sections were deleted.


  3. Occupational Medical Dose
    (Page Change Revision March 31, 2006)
    this document in PDF PDF 140 KB (18 pages)

    Page Change Revision Includes: Page change initiated to include boilerplate language in Section 3.1 on pages 5 and 6. Makes changes to Tables 3-6, 3-7 and 3-8 on pages 9 and 10 as requested by NIOSH. No sections were deleted.


  4. Occupational Environmental Dose
    (Approved October 6, 2004)
    this document in PDF PDF 914 KB (113 pages)


  5. Occupational Internal Dose
    (Approved September 9, 2004)
    this document in PDF PDF 456 KB (65 pages)


  6. Occupational External Dose
    (Approved August 11, 2004)
    this document in PDF PDF 350 KB (51 pages)

Top of Page

Technical Information Bulletins (TIBs)

  • Internal Dosimetry Coworker Data for the Mound Site
    this document in PDF PDF 185 KB (30 pages)

    Document Number: ORAUT-OTIB-0061 Rev-00

    About this Document: Assigns Mound internal doses based on coworker bioassay data. Incorporates formal internal and NIOSH review comments. There is no change to the assigned dose and no PER is required.

    Approved: June 22, 2007

Top of Page

Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)

NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.

At the current time, no PERs or PEPs specific to Mound Plant have been developed. However, we have developed PERs and PEPs that pertain to multiple sites. To view all PERs and PEPs that have been developed, please refer to the Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs) page.

Top of Page

Worker Outreach Activities

Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.

At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.

Below are the Worker Outreach Activities for the Mound Plant:

  • January 18, 2005
    Meeting with PACE International and Guard Unions

    Final Minutes
    this document in PDF PDF 37 KB (7 pages)


  • January 18, 2005
    Meeting with Dayton Building and Construction Trades Council

    Final Minutes
    this document in PDF PDF 32 KB (5 pages)

Top of Page

Advisory Board Work Group on the Mound Plant


This Work Group is responsible to review the SEC petition from the Mound petitioners, to review the NIOSH Evaluation Report of the petition, to consider issues raised by the Board's contractor (SC&A), and to assist NIOSH and SC&A in the resolution of such issues. The Work Group must independently evaluate the integrity and completeness of the data upon which dose reconstructions are based. The Work Group will consider the assumptions and judgments of historical facts provided in the Evaluation Report and develop appropriate recommendations for the Board's consideration. The Work Group will also consider any reviews provided by SC&A regarding the petition, and will use a deliberative process to narrow the scope of the SEC important issues and questions. The Work Group should strive to develop a recommendation to the Board on adding a class to the SEC.
  • Work Group Members
    Josie Beach-Chair
    Bradley Clawson
    Robert Presley
    Phillip Schofield
    Paul Ziemer
  • Meeting Information

    • October 27
      Meeting of the Advisory Board's Work Group on the Mound Plant

      Cincinnati Airport Marriott
      2395 Progress Dr.
      Hebron, KY 41048
      (859) 586-0166

      9:30 a.m. (Eastern time)

      This meeting is open to the public, but without a public comment period. Teleconference call access is available for this meeting and it is limited only by the number of ports available. To access the meeting via the teleconference call access, you must dial 1-866-659-0537. To be automatically connected to the meeting, you will need to enter the following participant code: 9933701.

      Agenda
      this document in PDF PDF 8 KB (1 page)

      Transcript
      this document in PDF PDF 401 KB (235 pages)

      Please note that as part of the procedures and processes of the Advisory Board's Work Groups, several kinds of pre-decisional documents may be developed. These documents, which can include white papers, matrices, working drafts, etc., are distributed among the Work Group members as research and background tools to facilitate discussion and deliberation. The discussions during the above meeting may cover a pre-decisional document. Because these types of documents are pre-decisional in nature, may contain sensitive information, and may change over time, they are not posted on our Web site. These finalized, reviewed and redacted pre-decisional documents are also available to other interested parties through an appropriate Freedom of Information Act request. Requests for documents not in the public domain should be submitted to the CDC/ATSDR Freedom of Information Act Office at foiarequests@cdc.gov.

    • July 14, 2008
      Meeting of the Advisory Board's Work Group on the Mound Plant

      Cincinnati Airport Marriott
      2395 Progress Dr.
      Hebron, KY 41048
      (859) 586-0166

      9:00 a.m. (Eastern time)

      This meeting is open to the public, but without a public comment period. Teleconference call access is available for this meeting and it is limited only by the number of ports available. To access the meeting via the teleconference call access, you must dial 1-866-659-0537. To be automatically connected to the meeting, you will need to enter the following participant code: 9933701.

      Agenda
      this document in PDF PDF 7 KB (1 page)

      Please note that as part of the procedures and processes of the Advisory Board's Work Groups, several kinds of pre-decisional documents may be developed. These documents, which can include white papers, matrices, working drafts, etc., are distributed among the Work Group members as research and background tools to facilitate discussion and deliberation. The discussions during the above meeting may cover a pre-decisional document. Because these types of documents are pre-decisional in nature, may contain sensitive information, and may change over time, they are not posted on our Web site. These finalized, reviewed and redacted pre-decisional documents are also available to other interested parties through an appropriate Freedom of Information Act request. Requests for documents not in the public domain should be submitted to the CDC/ATSDR Freedom of Information Act Office at foiarequests@cdc.gov.

    • April 1, 2008
      Meeting of the Advisory Board's Work Group on Mound
      Cincinnati Airport Marriott
      2395 Progress Dr.
      Hebron, KY 41048
      (859) 586-0166

      9:00 a.m. to 3:30 p.m.(Eastern time)

      This meeting is open to the public, but without a public comment period. Teleconference call access is available for this meeting and it is limited only by the number of ports available. To access the meeting via the teleconference call access, you must dial 1-866-659-0537. To be automatically connected to the meeting, you will need to enter the following participant code: 9933701.

      Agenda items will be provided at a later date.

      Transcript
      this document in PDF PDF 351 KB (251 pages)

      Please note that as part of the procedures and processes of the Advisory Board's Work Groups, several kinds of pre-decisional documents may be developed. These documents, which can include white papers, matrices, working drafts, etc., are distributed among the Work Group members as research and background tools to facilitate discussion and deliberation. The discussions during the above meeting may cover a pre-decisional document. Because these types of documents are pre-decisional in nature, may contain sensitive information, and may change over time, they are not posted on our Web site. These finalized, reviewed and redacted pre-decisional documents are also available to other interested parties through an appropriate Freedom of Information Act request. Requests for documents not in the public domain should be submitted to the CDC/ATSDR Freedom of Information Act Office at foiarequests@cdc.gov.


Top of Page

Comments on Mound Plant Documents

How to Submit Comments
Comments on Mound Plant documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (028) on all comments.

Comments Received

Top of Page

Special Exposure Cohort Petition Information for the Mound Plant

  • Class Added to the SEC

    Employees of the Department of Energy (DOE), its predecessor agencies, and DOE contractors or subcontractors who worked in any areas at the Mound Plant site from October 1, 1949, through February 28, 1959, for a number of work days aggregating at least 250 work days or in combination with work days within the parameters established for one or more other classes of employees in the SEC.

  • Petition Information
    • Location: Dayton, Ohio

      Job Titles and/or Job Duties: All workers

      Period of Employment: February 1, 1949 through the present

    • Location: Miamisburg, Ohio

      Job Titles and/or Job Duties: All workers

      Period of Employment: February 1, 1949 through the present

    NOTE: The two petitions listed above have been merged into one petition.

  • Federal Register Notice Announcing that the Mound Plant SEC Petition has met the Minimum Qualifications for Review and Evaluation
    August 28, 2007
    this document in PDF PDF 41 KB (1 page)

    October 3, 2007
    this document in PDF PDF 51 KB (1 page)

  • Copy of the Petition Received
    Mound Plant Petition
    this document in PDF PDF 971 KB (10 pages)

    Additional Mound Plant Petition (note: this petition was merged with the one listed above)
    this document in PDF PDF 2.3 MB (16 pages)

  • SEC Petition Evaluation Report
    Mound Plant Petition
    this document in PDF PDF 395 KB (95 pages)

  • Petition to be Discussed by the Advisory Board
    The Mound Plant SEC petition was discussed by the Advisory Board on January 8, 2008, during its regular meeting.

  • Advisory Board Recommendation on SEC Petition
    Advisory Board recommendation regarding the Mound Plant SEC Petition
    this document in PDF PDF 435 KB (2 pages)

  • HHS Letter to Congress Regarding the SEC Petition
    HHS letter to Congress regarding the Mound Plant SEC Petition
    this document in PDF PDF 1.4 MB (140 pages)

  • Federal Register Notice: Designation of a Class of Employees for Addition to the Special Exposure Cohort
    March 12, 2008
    this document in PDF PDF 45 KMB (1 page)

  • HHS Designation of Additional Members to the SEC
    HHS Designation regarding the Mound Plant SEC Petition
    this document in PDF PDF 43 KB (4 pages)

  • Effective Date for the SEC Class
    April 2, 2008

  • Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort
    May 1, 2008
    this document in PDF PDF 57 KB (2 pages)

  • Letter to DOL Regarding the Addition of a New Class of Employees to the SEC
    Letter to DOL Regarding the Addition of a New Class of Employees to the SEC for the Mound Plant
    this document in PDF PDF 20 KB (1 page)

  • Letter from DOL Regarding the Return of All Cases for the New SEC Class
    Not applicable at this time.
    (Note: this only applies if the class is added to the SEC.)

Top of Page

Previous Versions of Mound Plant Documents

Top of Page

Page last updated: December 3, 2008
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)

Find It !
On this page...
Site Profile
Technical Information Bulletins (TIBs)
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
Worker Outreach Activities
Advisory Board Work Group on the Mound Plant
Comments on Mound Plant Documents
Special Exposure Cohort Petition Information for the Mound Plant
Previous Versions of Mound Plant Documents
Claimant Corner
Claim Information
Commonly Used Acronyms
FAQs
General Activities on AWE Cases
General Activities on DOE Cases
Help A-Z
List of Work Sites
Phone Interview Information
OCAS Print Materials
Status of Your Dose Reconstruction
OCAS Directory
About OCAS
The Act (EEOICPA)
Advisory Board
Conflict or Bias Policy and Disclosure Statements
Dose Reconstruction
Help A-Z
Latest Update to OCAS Web Site
Probability of Causation
(NIOSH-IREP)

Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
Public Meetings
Regulatory Record
(Public Docket)

Related Links
Special Exposure Cohort
Technical Documents Used in Dose Reconstruction
Timeline of Major OCAS Events
OCAS Main Page