General Operations Plans for Fiscal Year 2008
(Oct. 2007-Sept. 2008)

HFIR

Operating Status

  • Operate six full-power operating cycles during FY2008.  Each cycle is 23-25 days.
  • Install and commission the US/Japan Cold Triple-Axis Spectrometer on guide CG-4.

SNS

Operating Status

Install and commission 4 new instruments:

  1. Cold Neutron Chopper Spectrometer (CNCS) - Beamline 5
  2. Powder Diffractometer (POWGEN) - Beamline 11A
  3. Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) - Beamline 6
  4. Spallation Neutrons and Pressure Diffractometer (SNAP) - Beamline 3

 

 