Jump to main content.


Mid-Year 2007 BRAC Program Snapshot



Base Realignment and Closure (BRAC) Information Summary

BRAC Federal Facilities by BRAC Round
Pie chart: BRAC 1 - 18% (19), BRAC 2 - 24% (26), BRAC 3 - 26% (28), BRAC  4 - 32% (34)

NPL Status of BRAC Facilities

NPL Status Number of BRAC Facilities
Proposed
3
Final
34
Deleted
1
Soon to be Proposed
1
Non NPL
68
Total
107

Back To Top

Current Site Work
Bar Graph Showing Current Site Work: Ongoing Removals – 47, Active TAGs – 6, Ongoing RI/FS Actions – 93, Ongoing RDs – 14, Ongoing RAs – 60, Ongoing O&M – 44

Completed Site Work
Bar Graph Showing Completed Site Work: Removed Comps – 449, Decision Documents 642, RD 218, RA 257, OPS 44, 5 Year Reviews 54, Partial Deletions 4

BRAC Federal Facility Site Cleanup Pipeline
Federal Facility Cleanup Pipeline: NPL Facilities – 107, Facilities with IAGs – 34, Active RABs/SSABs – 69, Final Remedy Selected – 25, All Construction Completed – 10, Deleted Facilities – 1


Notes: All data from 4/9/2007 CERCLIS 3. BRAC cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.

Back To Top


Interagency Agreements

% of BRAC Federal Facilities with Completed IAGs
Federal Agencies that have not acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
Navy 9 35 25.7%
Army 11 40 27.5%
Air Force 12 29 41.4%
Dept. of Defense 0 1 0.0%
Federal Agencies that have acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
DLA 2 2 100.0%

Back To Top


Institutional Controls at BRAC Facilities

Remedial Actions and Removal Actions with Institutional Controls

Bar Graph Showing Remedial and Removal Actions with ICs: Remedial Actions – 142, Removals – 8
Note: There are 45 BRAC Federal Facilities with Institutional Controls.

Back To Top


Status of 5 Year Review Protectiveness Statements

Bar Graph Showing Post-Construction Completion Activity at BRAC Facilities: Protective – 10, Will be Protective by Remedy Complete – 2, Protective in the Short Term – 10, Not Protective – 1, Protectiveness Deferred – 4, Complete – 9

Back To Top


Environmental Indicators at Federal Facilities

EI Status for Final NPL BRAC Federal Facilities (CERCLA)
(Total Facilities = 35)


Bar Graph Showing the EI Status for Final NPL Federal Facilities (CERCLA): Controlled – 30, Insufficient Data – 3, Not Controlled – 2, Controlled – 19, Insufficient Data - 8, Not Controlled – 7, Not a GW Site – 1
Note: 54% of Facilities have both Human Exposure and Groundwater controlled; 3% of Facilities have neither Human Exposure nor Groundwater controlled

Back To Top


Notes:

  • All data from 4/9/2007 CERCLIS 3.
    BRAC cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.

Back To Top


[ FFRRO Home ]
Web page maintained by Federal Facilities Restoration and Reuse Office
Comments: comments_ffrro@epa.gov


Local Navigation


Jump to main content.