Cost Information for NRRSS Records (with cost values)


Number
of
Projects

14,641
Projects
with
Cost
Values

8,889

 
Total
Costs

$7,287,169,530.50
 
% with
Cost

60

 
Minimum
Cost

$1.00

 
Maximum
Cost

$426,885,000.00

 
Median
Cost

$36,112.00

 
% with
Monitoring

15
 
% with
Project
Contact

40

 
Mean
Cost

$819,796.32
Upper 95%
Confidence
Interval
Value

$15,376,824.66

 
Standard
Deviation

10503442.292540

 


 

 

Project Intent Information for All NRRSS Nodes


 
Project
Intent

Aesthetics/Recreation/Education
Bank Stabilization
Channel Reconfiguration
Dam Removal/Retrofit
Fish Passage
Floodplain Reconnection
Flow Modification
In-stream Habitat Improvement
In-stream Species Management
Land Acquisition
Riparian Management
Stormwater Management
Water Quality Management
Other

Number
of
Projects

1,131
2,546
557
468
859
323
476
2,292
369
247
5,141
536
4,816
759
Projects
with
Cost
Values

814
1,422
178
250
683
236
300
1,586
270
223
2,882
381
3,841
559

 
Total
Costs

$1,462,758,458.24
$925,324,576.06
$1,358,189,741.87
$548,716,241.00
$122,378,405.54
$1,983,971,374.70
$1,644,743,549.33
$922,056,144.72
$448,919,109.00
$540,817,767.00
$1,467,668,981.37
$727,221,748.78
$2,374,423,944.02
$291,674,058.41
 
% with
Cost

71
55
31
53
79
73
63
69
73
90
56
71
79
73

 
Minimum
Cost

$200.00
$100.00
$1,000.00
$1,500.00
$400.00
$1,200.00
$300.00
$100.00
$150.00
$4,700.00
$30.05
$300.00
$30.05
$479.80

 
Maximum
Cost

$414,000,000.00
$150,000,000.00
$415,000,000.00
$150,000,000.00
$17,500,000.00
$415,000,000.00
$415,000,000.00
$372,000,000.00
$116,377,500.00
$110,000,000.00
$150,000,000.00
$150,000,000.00
$200,000,000.00
$116,377,500.00

 
Median
Cost

$64,212.50
$42,744.50
$160,000.00
$90,000.00
$30,000.00
$187,890.00
$177,726.00
$24,000.00
$72,155.50
$734,920.00
$18,288.50
$180,000.00
$44,850.00
$64,558.82

 
% with
Monitoring

29
18
36
24
15
43
40
13
42
4
13
47
18
18
 
% with
Project
Contact

84
66
36
29
66
85
64
61
66
8
26
82
46
69

 
Mean
Cost

$1,797,000.56
$650,720.52
$7,630,279.45
$2,194,864.96
$179,177.75
$8,406,658.37
$5,482,478.50
$581,372.10
$1,662,663.37
$2,425,191.78
$509,253.64
$1,908,718.50
$618,178.58
$521,778.28
Upper 95%
Confidence
Interval
Value

$25,792,609.10
$8,862,897.25
$79,166,857.79
$19,743,324.22
$1,355,370.14
$74,936,401.27
$53,901,120.53
$14,362,621.20
$15,139,050.15
$14,408,277.15
$6,830,657.31
$16,393,241.75
$8,244,151.61
$7,954,502.41

 
Standard
Deviation

17313732.160758
5925393.729011
51616326.171234
12661871.978851
848666.953440
48003706.484537
34935867.465753
9943688.463020
9723718.859527
8646245.840865
4561130.002791
10451127.156579
5502425.757595
5362989.423852

Note: Some NRRSS Records may have more than one Project Intent selected.
Total number of NRRSS records with one or more Project Intent values is: 12468
Total number of NRRSS records with no Project Intent values is: 2173
Percentage of NRRSS records with no Project Intent values is: 14%

 


 

Top Ten Activities for Project Intent: Aesthetics/Recreation/Education


Type
of
Activity

Other
Preventing/Removing Inputs
Vegetation
Vegetation
Other
Shape
Vegetation
Other
Preventing/Removing Inputs
Vegetation

 
 
Activity

Education
Cleaning (e.g. trash removal)
Revegetation unspecified
Revegetation - seedlings/saplings
Agricultural BMPs
Bank or channel reshaping
Eradication of weeds/nonnative plants
Research
Riparian buffer creation/maintenance
Revegetation - live stakes

 
 
Total

330
75
73
52
39
35
34
28
27
25


 

Top Ten Activities for Project Intent: Bank Stabilization


Type
of
Activity

Structure
Vegetation
Vegetation
Vegetation
Shape
Structure
Structure
Vegetation
Structure
Structure

 
 
Activity

Rip rap
Revegetation - seedlings/saplings
Revegetation unspecified
Revegetation - live stakes
Grading - banks
Boulders added
LWD added
Revegetation - seeds
Deflectors
Root wads

 
 
Total

682
397
316
302
250
202
198
186
177
136


 

Top Ten Activities for Project Intent: Channel Reconfiguration


Type
of
Activity

Shape
Structure
Vegetation
Shape
Vegetation
Preventing/Removing Inputs
Structure
Shape
Structure
Vegetation

 
 
Activity

Bank or channel reshaping
Rip rap
Revegetation unspecified
Meander creation
Revegetation - seedlings/saplings
Riparian buffer creation/maintenance
Rock vanes
Grading - banks
Root wads
Revegetation - live stakes

 
 
Total

150
83
83
75
75
74
72
69
57
55


 

Top Ten Activities for Project Intent: Dam Removal/Retrofit


Type
of
Activity

Structure
Vegetation
Flow
Vegetation
Structure
Shape
Shape
Vegetation
Structure
Structure

 
 
Activity

Dam removal
Revegetation unspecified
Flow regime enhancement
Revegetation - seeds
Fish passage installed
Meander creation
Bank or channel reshaping
Revegetation - seedlings/saplings
Fish ladders installed
Rip rap

 
 
Total

259
11
10
9
8
7
6
6
4
4


 

Top Ten Activities for Project Intent: Fish Passage


Type
of
Activity

Structure
Structure
Structure
Shape
Structure
Structure
Structure
Structure
Structure
Vegetation

 
 
Activity

Fish passage installed
LWD removed
Fish ladders installed
Pools created
LWD added
Weirs (rock vortex)
Dam removal
Boulders added
Fish screens installed
Revegetation - seedlings/saplings

 
 
Total

286
179
111
88
86
69
57
47
47
44


 

Top Ten Activities for Project Intent: Floodplain Reconnection


Type
of
Activity

Shape
Vegetation
Flow
Other
Vegetation
Vegetation
Shape
Structure
Shape
Structure

 
 
Activity

Bank or channel reshaping
Revegetation - seedlings/saplings
Reinstating/maintaining hydraulic connections
Wetland - construction
Revegetation - live stakes
Revegetation unspecified
Grading - banks
Weirs (rock vortex)
Meander creation
Boulders added

 
 
Total

30
23
20
18
17
16
13
11
11
10


 

Top Ten Activities for Project Intent: Flow Modification


Type
of
Activity

Flow
Flow
Vegetation
Vegetation
Structure
Shape
Other
Flow
Other
Other

 
 
Activity

Flow regime enhancement
Water level control/maintenance
Revegetation unspecified
Revegetation - seedlings/saplings
Boulders added
Bank or channel reshaping
Wetland - construction
Reinstating/maintaining hydraulic connections
Monitoring - flow
Backwater sediment dredging

 
 
Total

74
45
36
32
21
19
18
17
17
17


 

Top Ten Activities for Project Intent: In-stream Habitat Improvement


Type
of
Activity

Structure
Structure
Preventing/Removing Inputs
Structure
Vegetation
Shape
Structure
Vegetation
Vegetation
Structure

 
 
Activity

LWD added
Boulders added
Sand traps
Deflectors
Revegetation - seedlings/saplings
Pools created
Rip rap
Revegetation unspecified
Revegetation - live stakes
Root wads

 
 
Total

523
322
271
247
244
232
226
205
160
159


 

Top Ten Activities for Project Intent: In-stream Species Management


Type
of
Activity

Other
Other
Shape
Vegetation
Flow
Structure
Other
Other
Preventing/Removing Inputs
Vegetation

 
 
Activity

Native species reintroduction
Native species protection
Bank or channel reshaping
Revegetation unspecified
Flow regime enhancement
Dam removal
Monitoring - biota
Monitoring - flow
Fencing
Revegetation - seedlings/saplings

 
 
Total

24
23
13
13
7
7
7
6
5
5


 

Top Ten Activities for Project Intent: Land Acquisition


Type
of
Activity

Other
Vegetation
Shape
Other
Preventing/Removing Inputs
Other
Other
Flow
Preventing/Removing Inputs
Preventing/Removing Inputs

 
 
Activity

Land acquistion or purchase
Revegetation unspecified
Bank or channel reshaping
Native species protection
Fencing
Monitoring - flow
Wetland - conservation
Irrigation (increased efficiency)
Livestock exclusion (specific activities unspecified)
Riparian buffer creation/maintenance

 
 
Total

39
11
4
4
3
3
3
2
2
2


 

Top Ten Activities for Project Intent: Riparian Management


Type
of
Activity

Vegetation
Preventing/Removing Inputs
Preventing/Removing Inputs
Vegetation
Preventing/Removing Inputs
Vegetation
Vegetation
Structure
Shape
Structure

 
 
Activity

Revegetation - seedlings/saplings
Riparian buffer creation/maintenance
Livestock exclusion (specific activities unspecified)
Revegetation unspecified
Fencing
Revegetation - live stakes
Eradication of weeds/nonnative plants
LWD added
Bank or channel reshaping
Boulders added

 
 
Total

1957
855
639
319
215
194
171
113
109
99


 

Top Ten Activities for Project Intent: Stormwater Management


Type
of
Activity

Vegetation
Other
Preventing/Removing Inputs
Vegetation
Shape
Structure
Other
Shape
Shape
Vegetation

 
 
Activity

Revegetation unspecified
Wetland - construction
Riparian buffer creation/maintenance
Revegetation - seedlings/saplings
Bank or channel reshaping
Rip rap
Urban BMPS
Grading - banks
Meander creation
Revegetation - seeds

 
 
Total

25
25
20
19
18
16
16
14
13
13


 

Top Ten Activities for Project Intent: Water Quality Management


Type
of
Activity

Preventing/Removing Inputs
Preventing/Removing Inputs
Vegetation
Vegetation
Preventing/Removing Inputs
Other
Vegetation
Structure
Other
Structure

 
 
Activity

Riparian buffer creation/maintenance
Livestock exclusion (specific activities unspecified)
Revegetation - seedlings/saplings
Revegetation unspecified
Fencing
Agricultural BMPs
Revegetation - live stakes
Boulders added
Education
LWD added

 
 
Total

795
707
336
274
245
228
201
162
155
154


 

Top Ten Activities for Project Intent: Other


Type
of
Activity

Other
Other
Vegetation
Structure
Structure
Vegetation
Shape
Other
Vegetation
Other

 
 
Activity

Research
Education
Revegetation unspecified
Rip rap
Culverts added
Revegetation - seedlings/saplings
Grading-unspecified
Monitoring - biota
Eradication of weeds/nonnative plants
Wetland - construction

 
 
Total

311
101
84
75
68
32
30
29
22
21



 

 

Project Information by Year of Completion for All NRRSS Nodes


 
Year of
Completion

1901
1964
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2014
2018
2025
2030
2042

 
Number of
Projects

1
1
11
2
3
3
4
21
6
4
3
5
5
6
10
14
33
58
55
42
78
101
187
130
192
231
248
288
281
444
595
807
1,147
1,731
2,432
1,137
157
47
18
7
6
2
1
1
1
1
1

 
% with
Cost

100
0
9
0
0
33
25
0
0
0
0
0
0
0
60
50
75
65
83
83
82
82
82
84
75
61
67
64
68
46
46
44
54
56
66
81
47
48
100
71
83
50
100
0
100
0
100

 
Minimum
Cost

$10,625,100.00
$0.00
$15,000.00
$0.00
$0.00
$633,428.00
$1,974.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$18,570.00
$2,150.00
$1,500.00
$400.00
$150.00
$1,013.00
$500.00
$400.00
$200.00
$500.00
$1,000.00
$400.00
$500.00
$750.00
$769.00
$1,205.00
$853.00
$100.00
$500.00
$77.50
$42.05
$30.05
$4,119.40
$32,500.00
$10,000.00
$25,000.00
$50,000.00
$6,000,000.00
$5,000,000.00
$0.00
$160,000.00
$0.00
$42,386,000.00

 
Maximum
Cost

$10,625,100.00
$0.00
$15,000.00
$0.00
$0.00
$633,428.00
$1,974.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$51,114.00
$372,000.00
$274,800.00
$250,000.00
$262,700.00
$175,000.00
$560,000.00
$2,070,000.00
$2,092,000.00
$2,885,000.00
$2,310,000.00
$2,022,000.00
$15,715,778.00
$150,000,000.00
$5,967,000.00
$36,000,000.00
$10,647,000.00
$20,000,000.00
$110,000,000.00
$50,509,000.00
$200,000,000.00
$52,000,000.00
$2,183,251.00
$1,184,443.00
$13,175,000.00
$283,000.00
$150,000.00
$6,000,000.00
$5,000,000.00
$0.00
$160,000.00
$0.00
$42,386,000.00

 
Median
Cost

$10,625,100.00
$0.00
$15,000.00
$0.00
$0.00
$633,428.00
$1,974.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$25,423.25
$10,400.00
$7,023.00
$12,830.50
$15,954.00
$34,000.00
$26,672.00
$16,392.00
$16,000.00
$26,205.10
$29,628.00
$32,922.96
$28,094.00
$34,336.50
$40,000.00
$68,007.00
$57,159.00
$50,000.00
$43,515.00
$15,000.00
$15,000.00
$39,594.00
$192,868.00
$300,000.00
$177,930.00
$184,000.00
$125,000.00
$6,000,000.00
$5,000,000.00
$0.00
$160,000.00
$0.00
$42,386,000.00

 
% with
Monitoring

100
0
0
0
0
33
0
0
0
0
0
0
0
16
0
7
12
3
5
7
11
10
9
6
11
12
14
15
16
16
16
14
21
9
7
11
14
8
38
28
50
50
0
100
100
0
0
 
% with
Project
Contact

100
100
54
100
0
33
25
66
0
25
0
20
0
33
80
92
84
67
78
90
64
89
86
89
81
78
76
82
74
49
35
35
37
25
21
49
44
19
5
28
16
100
100
100
100
100
100

Note: Some of the categories for each year may have incomplete information available.

 

 

 

 

Number of Projects with the Number of Intent Categories for All NRRSS Nodes


# of Intent Categories

1
2
3
4
5
6
7
8
9
10
11
12
13
14

# Projects

7,279
3,450
981
425
306
21
6
0
0
0
0
0
0
0

Note: Not all NRRSS records have a project intent number selected.

 

 


 

 

 

Statistics Pages for Nodes


   Australia Node Statistics Page
  
   California Node Statistics Page
  
   Lower Cheaspeake Node Statistics Page
  
   Upper Cheaspeake Node Statistics Page
  
   Central Great Node Statistics Page
  
   Upper Midwest Node Statistics Page
  
   Pacific NW Node Statistics Page
  
   Southeast Node Statistics Page
  
   Southwest Node Statistics Page
  
   Internode Node Statistics Page
  
 


 

Additional Statistics for NRRSS

NRRSS Home | NRRSS Public Area |

     NRRSS comments, questions: Emily S. Bernhardt     Web page and database contact: Bruce Powell


This NBII site is developed and maintained by the
Center for Biological Informatics of the U.S. Geological Survey

U.S. Geological Survey logo  Center for Biological Informatics logo


   FirstGov science.gov

   Creation date: Tue Mar 28 04:15:01 MST 2006