National River Restoration Science Synthesis (NRRSS)
River Restoration in our Nation: A Scientific Synthesis to Inform Policy,
Grassroots Actions, and Future Research
National River Restoration Science Synthesis (NRRSS) Statistics Page for
All Node Areas
Statistics for March 28, 2006
Cost Information for NRRSS Records (with cost values)
|
|
|
|
|
|
|
|
  % with Project Contact |
|
|
Upper 95% Confidence Interval Value |
|
|
|
Project Intent Information for All NRRSS Nodes
Aesthetics/Recreation/Education Bank Stabilization Channel Reconfiguration Dam Removal/Retrofit Fish Passage Floodplain Reconnection Flow Modification In-stream Habitat Improvement In-stream Species Management Land Acquisition Riparian Management Stormwater Management Water Quality Management Other |
|
1,131 2,546 557 468 859 323 476 2,292 369 247 5,141 536 4,816 759 |
|
814 1,422 178 250 683 236 300 1,586 270 223 2,882 381 3,841 559 |
|
$1,462,758,458.24 $925,324,576.06 $1,358,189,741.87 $548,716,241.00 $122,378,405.54 $1,983,971,374.70 $1,644,743,549.33 $922,056,144.72 $448,919,109.00 $540,817,767.00 $1,467,668,981.37 $727,221,748.78 $2,374,423,944.02 $291,674,058.41 |
|
71 55 31 53 79 73 63 69 73 90 56 71 79 73 |
|
$200.00 $100.00 $1,000.00 $1,500.00 $400.00 $1,200.00 $300.00 $100.00 $150.00 $4,700.00 $30.05 $300.00 $30.05 $479.80 |
|
$414,000,000.00 $150,000,000.00 $415,000,000.00 $150,000,000.00 $17,500,000.00 $415,000,000.00 $415,000,000.00 $372,000,000.00 $116,377,500.00 $110,000,000.00 $150,000,000.00 $150,000,000.00 $200,000,000.00 $116,377,500.00 |
|
$64,212.50 $42,744.50 $160,000.00 $90,000.00 $30,000.00 $187,890.00 $177,726.00 $24,000.00 $72,155.50 $734,920.00 $18,288.50 $180,000.00 $44,850.00 $64,558.82 |
|
29 18 36 24 15 43 40 13 42 4 13 47 18 18 |
|
  % with Project Contact |
84 66 36 29 66 85 64 61 66 8 26 82 46 69 |
|
$1,797,000.56 $650,720.52 $7,630,279.45 $2,194,864.96 $179,177.75 $8,406,658.37 $5,482,478.50 $581,372.10 $1,662,663.37 $2,425,191.78 $509,253.64 $1,908,718.50 $618,178.58 $521,778.28 |
|
Upper 95% Confidence Interval Value |
$25,792,609.10 $8,862,897.25 $79,166,857.79 $19,743,324.22 $1,355,370.14 $74,936,401.27 $53,901,120.53 $14,362,621.20 $15,139,050.15 $14,408,277.15 $6,830,657.31 $16,393,241.75 $8,244,151.61 $7,954,502.41 |
|
17313732.160758 5925393.729011 51616326.171234 12661871.978851 848666.953440 48003706.484537 34935867.465753 9943688.463020 9723718.859527 8646245.840865 4561130.002791 10451127.156579 5502425.757595 5362989.423852 |
|
Note: Some NRRSS Records may have more than one Project Intent selected.
Total number of NRRSS records with one or more Project Intent values is: 12468
Total number of NRRSS records with no Project Intent values is: 2173
Percentage of NRRSS records with no Project Intent values is: 14%
|
Top Ten Activities for Project Intent: Aesthetics/Recreation/Education
Other Preventing/Removing Inputs Vegetation Vegetation Other Shape Vegetation Other Preventing/Removing Inputs Vegetation |
|
Education Cleaning (e.g. trash removal) Revegetation unspecified Revegetation - seedlings/saplings Agricultural BMPs Bank or channel reshaping Eradication of weeds/nonnative plants Research Riparian buffer creation/maintenance Revegetation - live stakes |
|
|
|
Top Ten Activities for Project Intent: Bank Stabilization
Structure Vegetation Vegetation Vegetation Shape Structure Structure Vegetation Structure Structure |
|
Rip rap Revegetation - seedlings/saplings Revegetation unspecified Revegetation - live stakes Grading - banks Boulders added LWD added Revegetation - seeds Deflectors Root wads |
|
682 397 316 302 250 202 198 186 177 136 |
|
|
Top Ten Activities for Project Intent: Channel Reconfiguration
Shape Structure Vegetation Shape Vegetation Preventing/Removing Inputs Structure Shape Structure Vegetation |
|
Bank or channel reshaping Rip rap Revegetation unspecified Meander creation Revegetation - seedlings/saplings Riparian buffer creation/maintenance Rock vanes Grading - banks Root wads Revegetation - live stakes |
|
|
|
Top Ten Activities for Project Intent: Dam Removal/Retrofit
Structure Vegetation Flow Vegetation Structure Shape Shape Vegetation Structure Structure |
|
Dam removal Revegetation unspecified Flow regime enhancement Revegetation - seeds Fish passage installed Meander creation Bank or channel reshaping Revegetation - seedlings/saplings Fish ladders installed Rip rap |
|
|
|
Top Ten Activities for Project Intent: Fish Passage
Structure Structure Structure Shape Structure Structure Structure Structure Structure Vegetation |
|
Fish passage installed LWD removed Fish ladders installed Pools created LWD added Weirs (rock vortex) Dam removal Boulders added Fish screens installed Revegetation - seedlings/saplings |
|
|
|
Top Ten Activities for Project Intent: Floodplain Reconnection
Shape Vegetation Flow Other Vegetation Vegetation Shape Structure Shape Structure |
|
Bank or channel reshaping Revegetation - seedlings/saplings Reinstating/maintaining hydraulic connections Wetland - construction Revegetation - live stakes Revegetation unspecified Grading - banks Weirs (rock vortex) Meander creation Boulders added |
|
|
|
Top Ten Activities for Project Intent: Flow Modification
Flow Flow Vegetation Vegetation Structure Shape Other Flow Other Other |
|
Flow regime enhancement Water level control/maintenance Revegetation unspecified Revegetation - seedlings/saplings Boulders added Bank or channel reshaping Wetland - construction Reinstating/maintaining hydraulic connections Monitoring - flow Backwater sediment dredging |
|
|
|
Top Ten Activities for Project Intent: In-stream Habitat Improvement
Structure Structure Preventing/Removing Inputs Structure Vegetation Shape Structure Vegetation Vegetation Structure |
|
LWD added Boulders added Sand traps Deflectors Revegetation - seedlings/saplings Pools created Rip rap Revegetation unspecified Revegetation - live stakes Root wads |
|
523 322 271 247 244 232 226 205 160 159 |
|
|
Top Ten Activities for Project Intent: In-stream Species Management
Other Other Shape Vegetation Flow Structure Other Other Preventing/Removing Inputs Vegetation |
|
Native species reintroduction Native species protection Bank or channel reshaping Revegetation unspecified Flow regime enhancement Dam removal Monitoring - biota Monitoring - flow Fencing Revegetation - seedlings/saplings |
|
|
|
Top Ten Activities for Project Intent: Land Acquisition
Other Vegetation Shape Other Preventing/Removing Inputs Other Other Flow Preventing/Removing Inputs Preventing/Removing Inputs |
|
Land acquistion or purchase Revegetation unspecified Bank or channel reshaping Native species protection Fencing Monitoring - flow Wetland - conservation Irrigation (increased efficiency) Livestock exclusion (specific activities unspecified) Riparian buffer creation/maintenance |
|
|
|
Top Ten Activities for Project Intent: Riparian Management
Vegetation Preventing/Removing Inputs Preventing/Removing Inputs Vegetation Preventing/Removing Inputs Vegetation Vegetation Structure Shape Structure |
|
Revegetation - seedlings/saplings Riparian buffer creation/maintenance Livestock exclusion (specific activities unspecified) Revegetation unspecified Fencing Revegetation - live stakes Eradication of weeds/nonnative plants LWD added Bank or channel reshaping Boulders added |
|
1957 855 639 319 215 194 171 113 109 99 |
|
|
Top Ten Activities for Project Intent: Stormwater Management
Vegetation Other Preventing/Removing Inputs Vegetation Shape Structure Other Shape Shape Vegetation |
|
Revegetation unspecified Wetland - construction Riparian buffer creation/maintenance Revegetation - seedlings/saplings Bank or channel reshaping Rip rap Urban BMPS Grading - banks Meander creation Revegetation - seeds |
|
|
|
Top Ten Activities for Project Intent: Water Quality Management
Preventing/Removing Inputs Preventing/Removing Inputs Vegetation Vegetation Preventing/Removing Inputs Other Vegetation Structure Other Structure |
|
Riparian buffer creation/maintenance Livestock exclusion (specific activities unspecified) Revegetation - seedlings/saplings Revegetation unspecified Fencing Agricultural BMPs Revegetation - live stakes Boulders added Education LWD added |
|
795 707 336 274 245 228 201 162 155 154 |
|
|
Top Ten Activities for Project Intent: Other
Other Other Vegetation Structure Structure Vegetation Shape Other Vegetation Other |
|
Research Education Revegetation unspecified Rip rap Culverts added Revegetation - seedlings/saplings Grading-unspecified Monitoring - biota Eradication of weeds/nonnative plants Wetland - construction |
|
|
|
Project Information by Year of Completion for All NRRSS Nodes
1901 1964 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2014 2018 2025 2030 2042 |
|
1 1 11 2 3 3 4 21 6 4 3 5 5 6 10 14 33 58 55 42 78 101 187 130 192 231 248 288 281 444 595 807 1,147 1,731 2,432 1,137 157 47 18 7 6 2 1 1 1 1 1 |
|
100 0 9 0 0 33 25 0 0 0 0 0 0 0 60 50 75 65 83 83 82 82 82 84 75 61 67 64 68 46 46 44 54 56 66 81 47 48 100 71 83 50 100 0 100 0 100 |
|
$10,625,100.00 $0.00 $15,000.00 $0.00 $0.00 $633,428.00 $1,974.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18,570.00 $2,150.00 $1,500.00 $400.00 $150.00 $1,013.00 $500.00 $400.00 $200.00 $500.00 $1,000.00 $400.00 $500.00 $750.00 $769.00 $1,205.00 $853.00 $100.00 $500.00 $77.50 $42.05 $30.05 $4,119.40 $32,500.00 $10,000.00 $25,000.00 $50,000.00 $6,000,000.00 $5,000,000.00 $0.00 $160,000.00 $0.00 $42,386,000.00 |
|
$10,625,100.00 $0.00 $15,000.00 $0.00 $0.00 $633,428.00 $1,974.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $51,114.00 $372,000.00 $274,800.00 $250,000.00 $262,700.00 $175,000.00 $560,000.00 $2,070,000.00 $2,092,000.00 $2,885,000.00 $2,310,000.00 $2,022,000.00 $15,715,778.00 $150,000,000.00 $5,967,000.00 $36,000,000.00 $10,647,000.00 $20,000,000.00 $110,000,000.00 $50,509,000.00 $200,000,000.00 $52,000,000.00 $2,183,251.00 $1,184,443.00 $13,175,000.00 $283,000.00 $150,000.00 $6,000,000.00 $5,000,000.00 $0.00 $160,000.00 $0.00 $42,386,000.00 |
|
$10,625,100.00 $0.00 $15,000.00 $0.00 $0.00 $633,428.00 $1,974.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25,423.25 $10,400.00 $7,023.00 $12,830.50 $15,954.00 $34,000.00 $26,672.00 $16,392.00 $16,000.00 $26,205.10 $29,628.00 $32,922.96 $28,094.00 $34,336.50 $40,000.00 $68,007.00 $57,159.00 $50,000.00 $43,515.00 $15,000.00 $15,000.00 $39,594.00 $192,868.00 $300,000.00 $177,930.00 $184,000.00 $125,000.00 $6,000,000.00 $5,000,000.00 $0.00 $160,000.00 $0.00 $42,386,000.00 |
|
100 0 0 0 0 33 0 0 0 0 0 0 0 16 0 7 12 3 5 7 11 10 9 6 11 12 14 15 16 16 16 14 21 9 7 11 14 8 38 28 50 50 0 100 100 0 0 |
|
  % with Project Contact |
100 100 54 100 0 33 25 66 0 25 0 20 0 33 80 92 84 67 78 90 64 89 86 89 81 78 76 82 74 49 35 35 37 25 21 49 44 19 5 28 16 100 100 100 100 100 100 |
|
Note: Some of the categories for each year may have incomplete information available.
|
Number of Projects with the Number of Intent Categories for All NRRSS Nodes
|
7,279 3,450 981 425 306 21 6 0 0 0 0 0 0 0 |
|
Note: Not all NRRSS records have a project intent number selected.
|
|