Oak Ridge Experiment on CO2 Enrichment of Sweetgum

Home

Goals

Experimental design

Site description

Results

People

Publications

User Facility

Data

Photo gallery

A DOE User Facility


A User Facility
The Oak Ridge FACE facility is operated by the Environmental Sciences Division of the Oak Ridge National Laboratory (ORNL) as part of the FACE user facility of the U. S. Department of Energy, Office of Science, Biological and Environmental Research program. It is open to researchers from universities and other research laboratories who are interested in pursuing other questions relevant to forest response to elevated CO2. There are no fees charged for using this facility. However, all research conducted at the site must be approved by the Principal Investigator, and users must agree to abide by the saftey and access requirements of ORNL and DOE. Contact Rich Norby for more information about using this facility.

User Facility Statistics

Month     Scheduled
hours
Operating
hours
Operating time
(% of scheduled)
On-site
users
Data status Comments
Nov 2007 97 97 100.0 4 final CO2 off for winter on Nov. 9
Oct 2007 341 341 100.0 6 final
Sep 2007 374 374 100.0 6 final
Aug 2007 411 407 99.0 7 final
July 2007 447 443 99.1 5 final
June 2007 486 452 93.0 4 final
May 2007 436 428 98.2 3 final
Apr 2007 83 83 100 2 final On for year 10 on April 24
Mar 2007 0 0 . 2 final Off for winter
Feb 2007 0 0 . 2 final Off for winter
Jan 2007 0 0 . 3 final Off for winter
Dec 2006 0 0 . 4 final Off for winter
Nov 2006 28 28 100 5 final Off for winter on Nov. 3
Oct 2006 334 327 97.9 5 final
Sep 2006 386 351 90.9 5 final power failures due to lightning
Aug 2006 416 414 99.5 4 final
Jul 2006 437 437 100.0 4 final
June 2006 450 446 98.9 4 final
May 2006 424 285 67.2 3 final Vaporizer system repaired on 22 May
Apr 2006 147 98 66.7 3 final Started on 21 April; shut down for vaporizer repairs
Mar 2006 0 0 . 3 final Prepared for April start-up
Feb 2006 0 0 . 3 final Off for winter
Jan 2006 0 0 . 3 final Off for winter
Dec 2005 0 0 . 5 final Off for winter
Nov 2005 0 0 . 6 final Off for winter
Oct 2005 23 23 100 7 final System turned off Oct 3 for the season
Sep 2005 373 310 83.1 6 final off for 2 days for pulse-chase experiment; CO2 supply problems due to hurricanes
Aug 2005 411 411 100.0 6 final off for 2 days for pulse-chase experiment
July 2005 445 427 96.0 8 final off for 2 days for pulse-chase experiment
June 2005 468 440 94.0 6 final lightning damage
May 2005 426 397 93.2 3 final
Apr 2005 137 126 92.0 3 final Restart April 20;
Mar 2005 0 0 . 2 final Off for winter
Feb 2005 0 0 . 2 final Off for winter
Jan 2004 0 0 . 2 final Off for winter
Dec 2004 0 0 . 3 final Off for winter
Nov 2004 0 0 . 3 final Off for winter
Oct 2004 0 0 . 3 final Turned off for winter 30 Sept,
Sep 2004 372 316 85.1 4 final vaporizer malfunction
Aug 2004 410 368 89.9 4 final .
Jul 2004 435 431 99.1 5 final .
Jun 2004 451 402 89.2 3 final Storm damage repaired 6 June
May 2004 438 398 91.0 3 final Major storm damage 26 May
Apr 2004 100 74 74.0 2 final Restart 19 April; vaporizer problems
Mar 2004 0 0 . 1 final System off for winter
Feb 2004 0 0 . 1 final System off for winter
Jan 2004 0 0 . 1 final System off for winter
Dec 2003 0 0 . 1 final System off for winter
Nov 2003 0 0 . 1 final System off for winter
Oct 2003 416 368 88.3 4 final System off for winter 27 Oct

Notes

Scheduled hours are the total number of daylight hours in the month with temperature > 1 C, except for occasional periods when the CO2 was deliberately turned off for specific scientific objectives.
Operating hours are the scheduled hours when the CO2 exposure system was functioning properly.
On-site users are the number of principal investigators and co-investigators who were physically present at the FACE site in the given month, or who have technicians, post-docs, and graduate students working on the site. The tally does not include investigators analyzing samples or data from the site in their home laboratory. The multiple projects and participants associated with the core funding to ORNL all count as 1 user.


Goal |  Experimental design |  Site description |  Results |  People |  Publications |  User facility |  Data |  Photo gallery
ORNL |  Environmental Sciences Division |  Contact |  Disclaimer
Last revised: November 17, 2007