  • 8 water treatment plants serving the base
    • Hadnot Point (HP)
      • Began operation in 1942
      • Areas served:
        • Mainside barracks
        • Hospital Point family housing
        • Family housing at Midway Park, Paradise Point, and Berkeley Manor until June 1972
    • Tarawa Terrace (TT)
      • Began operation in 1952
      • Shut down in March 1987
      • Areas served:
        • Tarawa Terrace family housing
        • Knox trailer park
    • Holcomb Boulevard (HB)
      • Began operation in June 1972
      • Areas served:
        • Family housing at Midway Park, Paradise Point, Berkeley Manor, and Watkins Village
        • Tarawa Terrace family housing after March 1987
    • Courthouse Bay
    • Rifle Range
    • Onslow Beach
    • Montford Point/Camp Johnson
    • New River

  • VOCs detected in HP and TT wells during 1980-85 sampling program
    • Samples collected by Camp Lejeune staff
    • Chemicals detected included TCE, PCE, benzene, DCE
    • Contamination of wells began many years before detection
    • Other on-base treatment plants were not contaminated

  • Contamination of HP and TT drinking water systems was intermittent
    • Wells rotated in and out of service
    • Each system had more wells than necessary to supply water on any given day

  • Tarawa Terrace Treatment Plant
    • PCE (perchloroethylene or tetrachloroethylene) was the main contaminant
    • Maximum level detected in drinking water was 215 parts per billion (ppb) in February 1985
    • Source of contamination was ABC One-Hour Cleaners, an off-base dry cleaning firm
    • The most contaminated wells were shut down in February 1985
    • Water modeling conducted by ATSDR is complete
      • PCE concentration exceeded the current limit of 5 ppb in drinking water at the TT water treatment plant for 346 months during November 1957-February 1987

  • Hadnot Point Treatment Plant
    • TCE (trichloroethylene) was the main contaminant
    • Maximum level detected in drinking water was 1,400 ppb in May 1982
      • The current limit for TCE in drinking water is 5 ppb
    • Other contaminants detected included DCE (trans-1,2-dichloroethylene) at a maximum of 407 ppb in January 1985, PCE and benzene
    • Multiple sources of contamination
      • Leaking underground storage tanks
      • Waste disposal sites
    • The most contaminated wells were shut down by February 1985
    • Water modeling is ongoing
      • Presently unknown when contamination of some HP wells began, but may have begun as early as the late 1940s or early 1950s
      • When the water modeling is completed by mid-2009, the dates when the system was contaminated will be determined

  • Holcomb Boulevard wells were not contaminated
    • Contaminated water from HP supplied the HB system when the HB plant was shut down for almost two weeks during January 27-Febraury 7, 1985
    • Contaminated water from HP may have been used sporadically to supplement the HB supply during dry summer months when the golf courses were watered
horizontal dividing line
rectangle border
Camp Lejeune, NC
bullet Home
bullet Chemicals Involved
bullet ATSDR/DoD Meeting Minutes
bullet Water Modeling
bullet Public Health Activities
bullet Publications
bullet Community Resources
bullet Contact Us
rectangle border
 News

Upcoming Events

Camp Lejeune News Release Archive

Events Archive

 
divider

This page last updated on May 12, 2008
Questions? - Call CDC-INFO toll free at 1-800-232-4636, or e-mail.

ATSDR Home  |  Search  |  Index  |  Glossary  |  Contact Us
About ATSDR  |  News Archive  |  ToxFAQs  |  Public Health Assessments
Privacy Policy  |  External Links Disclaimer  |  Accessibility
US Department of Health and Human Services