Iowa Ordnance Plant (IOP)
(Site Profile Number 025)

Location: Burlington, Iowa

Also known as: Burlington Ordnance Plant
                         Iowa Army Ammunition Plant
                         Mason & Hanger
                         Silas Mason Co.

Technical Basis Document


Technical Basis Document for Atomic Energy Operations at the Iowa Army Ammunition Plant (IAAP)
(Revised December 21, 2005)
this document in PDF PDF 449 KB (19 pages)

Revision Includes: Significant changes based upon the feasibility determination by the Secretary of Health and Human Services. Incorporated comments received from the Office of General Counsel pertaining to reconstruction of medical X-ray procedures.

Top of Page

Technical Information Bulletins (TIBs)

At the current time, there are no TIBs for IOP.

Top of Page

Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)

NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.

At the current time, no PERs or PEPs specific to IOP have been developed. However, we have developed PERs and PEPs that pertain to multiple sites. To view all PERs and PEPs that have been developed, please refer to the Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs) page.

Top of Page

Worker Outreach Activities

Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.

At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.

Below are the Worker Outreach Activities for IOP:

  • July 29, 2004
    Meeting with former workers

    Final Minutes
    this document in PDF PDF 119 KB (14 pages)

  • June 14, 2004
    The minutes from the meeting have not been finalized.

Top of Page

Comments on IOP Documents

How to Submit Comments
Comments on IOP documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (025) on all comments.

Comments Received

Top of Page

Special Exposure Cohort Petition Information for IOP

  • Submissions Not Qualifying for Evaluation
    In addition to the petition listed below, an additional submission was received but did not qualify for evaluation because it did not meet the minimum petition requirements.


  • Classes Added to the SEC
    • Iowa Ordnance Plant--employees of the DOE or DOE contractors or subcontractors employed by the Iowa Ordnance Plant (Iowa Army Ammunition Plant), Line 1, during the period from March 1949 through 1974 who were employed for a number of work days aggregating at least 250 work days either solely under this employment or in combination with work days within the parameters (excluding aggregate work day requirements) established for other classes of employees included in the SEC

    • Iowa Ordnance Plant (Radiographer)--Department of Energy (DOE) employees or DOE contractor or subcontractor employees who worked as radiographers from May 1948 to March 1949 in support of Line 1 operations at the Iowa Army Ammunition Plant and who were employed for a number of work days aggregating at least 250 work days, occurring under this employment in combination with work days of employment occurring within the parameters (excluding aggregate work day requirements) established for other classes of employees included in the SEC

  • Classes Not Added to the SEC
    • Iowa Ordnance Plant--The time period 1946-April 1948 is prior to the introduction of any radioactive materials or radiological procedures at Line 1 of IOP. For this class, NIOSH determined that no feasibility determination is necessary because members of the class received no radiation doses as covered by EEOICPA

  • Petition Information

    Location: Burlington, Iowa--Line 1 (which includes Yard C, Yard G, Yard L, Firing Site Area, Burning Field "B", and Storage Sites for Pits and Weapons including Buildings 73 and 77)

    Job Titles and/or Job Duties: All Technicians (Laboratory, Health Physics, Chemical, X-ray, etc.), Production Personnel (hourly and salaried), Engineers, Inspectors, Safety Personnel, Physical Security Personnel, and Maintenance Persons

    Period of Employment: 1947-1974

Top of Page

Previous Versions of IAAP Documents

Top of Page

Page last updated: April 29, 2008
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)

Find It !
On this page...
Technical Basis Document
Technical Information Bulletins (TIBs)
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
Worker Outreach Activities
Comments on IOP Documents
Special Exposure Cohort Petition Information for IOP
Previous Versions of IOP Documents
Claimant Corner
Claim Information
Commonly Used Acronyms
FAQs
General Activities on AWE Cases
General Activities on DOE Cases
Help A-Z
List of Work Sites
Phone Interview Information
OCAS Print Materials
Status of Your Dose Reconstruction
OCAS Directory
About OCAS
The Act (EEOICPA)
Advisory Board
Conflict or Bias Policy and Disclosure Statements
Dose Reconstruction
Help A-Z
Latest Update to OCAS Web Site
Probability of Causation
(NIOSH-IREP)

Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
Public Meetings
Regulatory Record
(Public Docket)

Related Links
Special Exposure Cohort
Technical Documents Used in Dose Reconstruction
Timeline of Major OCAS Events
OCAS Main Page