Under 7 CFR 1794.24, Proposals normally requiring an EA with scoping, a certain category of Electric Program actions require the use of a scoping process that is similar to those proposals that require an Environmental Impact Statement.   The following projects and links provide  Federal Register Notices and documentation for these proposals.

Associated Electric Cooperative, Inc.

Proposed 540-megawatt (MW) Gas-Fired Combustion Combined-Cycle Generation Unit in Mayes County, Oklahoma

East Kentucky Power Cooperative, Inc.

Environmental Assessment - Spurlock Station, Gilbert Units 3 and 4

Environmental Assessment - Smith to Sideview (North Clark) Electric Transmission Proposal (5/31/06 - 16.82 MB)

Proposal Change: GM-Memphis Junction EA Will Now Be Included In The Warren RECC 161 kV Transmission Line Proposal

Upon review of the public comments received on the  Environmental Assessment (EA) prepared for the East Kentucky Power Corporation's proposed GM - Memphis Junction 161 kV Transmission Line, we have decided that the four transmission line proposals to serve the Warren Rural Electric Cooperative Corporation (General Motors to Memphis Junction; Memphis Junction to Aberdeen; Barren County to Oakland to Magna; and Wilson to Aberdeen) will be integrated and evaluated under a single EA. 

Warren RECC 161 kV Transmission Line Proposal

Copies of the Cultural Resource Reports are available by request.  Please contact Stephanie A. Strength at stephanie.strength@wdc.usda.gov to request either a hard copy or electronic (CD) version of the reports.

Environmental Assessment for the Proposed GM - Memphis Junction Electric Transmission Proposal (6/20/06)

Smith Station Combustion Turbine (CT) Units 9 and 10 and Smith-West Garrard   Transmission Line Proposal

Georgia Transmission Corporation

Electric Alternative Evaluation Study and Macro Corridor Study Report for the Proposed East Walton – Rockville 500 kV Transmission Line; East Walton 500/230 kV Substation; East Walton – Bostwick 230 kV Transmission Line; Bostwick 230 kV Switching Station; East Walton – Jack’s Creek 230 kV Transmission Line; and the East Walton – Bethabara #1 230 kV Transmission Line.  

Thomson-Warthen 500 kV Transmission Project.

Thomson Primary 500/230/115/46 kV Substation and 38.7-mile 500 kV Transmission Line to the existing Warthen 500 kV Switching Station.

Jim Moore - Sharon Church 230 kV Transmission Line Proposal

Cliftondale 230/25 kV Substation, Cavender Drive-Cliftondale 230kV Transmission Line, and Cavender Drive 230 kV Switching Station Proposal

Earth Resources, Inc., Plant Carl, Carnesville, GA

Proposed 20 MW Power Generation Station Utilizing Chicken Litter and Woody Biomass

South Mississippi Electric Power Association

Southeast Greene 230:161:69 kV Substation; Microwave Tower; and 230 and 69 kV Transmission Line

Southern Maryland Electric Cooperative

Holland Cliff - Hewitt Road 230 kV Transmission Line Project, Calvert and St. Mary Counties, Maryland

KAMO Electric Cooperative, Inc

Blackberry – Chouteau 345-kV Transmission Proposal

East Texas Electric Cooperative, Inc

East Texas Electric Cooperative, Inc - Warren Relocation Project - Hardin County, Cypress Peaking Power Facility Proposal

East Texas Electric Cooperative, Inc - Warren Relocation Project - San Jacinto County Peaking Power Facility Proposal

Brazos Electric Power Cooperative, Inc.

Jack County, TX, Generation Plant - Unit 2

Basin Electric Power Cooperative, Inc.

PrairieWinds - ND1 Wind Proposal, Minot ND

100 MW Simple Cycle Combustion Turbine Proposal, Culbertson, MT

Columbia Power Cooperative Association, Inc.

Decker Energy International, Inc.

Hertford Renewable Energy, LLC Biomass Power Plant, Hertford County, North Carolina

Minnkota Power Cooperative, Inc.

Bemidji-Grand Rapids, MN, 230 kV Transmission Line (this proposal has been elevated to an Environmental Impact Statement - the above link will take you to our EIS page)

PowerSouth Energy Cooperative Inc.

McIntosh Power Plant - Construction of a New 360-megawatt Peaking-Load Gas-Fired Generation Facility Proposal, Andalusia, Alabama

 