|
|
It is the policy of RUS to prepare programmatic level analysis in order to tier an EIS and an EA where: (a) It is practicable, and (b) There will be a reduction of delay and paperwork, or where better decision making will be fostered (40 CFR 1502.20). August 1, 2007 -->
|