text-only page produced automatically by LIFT Text Transcoder Skip all navigation and go to page contentSkip top navigation and go to directorate navigationSkip top navigation and go to page navigation
National Science Foundation Home National Science Foundation - Engineering (ENG)
 
Engineering (ENG)
design element
ENG Home
About ENG
Funding Opportunities
Awards
News
Events
Discoveries
Publications
Advisory Committee
Career Opportunities
General Info
Strategic Plans and Reorganization Docs
See Additional ENG Resources
View ENG Staff
ENG Organizations
Chemical, Bioengineering, Environmental, and Transport Systems (CBET)
Civil, Mechanical and Manufacturing Innovation (CMMI)
Electrical, Communications and Cyber Systems (ECCS)
Engineering Education and Centers (EEC)
Emerging Frontiers in Research and Innovation (EFRI)
Industrial Innovation and Partnerships (IIP)
Proposals and Awards
Proposal and Award Policies and Procedures Guide
  Introduction
Proposal Preparation and Submission
bullet Grant Proposal Guide
  bullet Grants.gov Application Guide
Award and Administration
bullet Award and Administration Guide
Award Conditions
Other Types of Proposals
Merit Review
NSF Outreach
Policy Office
Additional ENG Resources
ENG Committee of Visitor (COV) Reports
General Information
Other Site Features
Special Reports
Research Overviews
Multimedia Gallery
Classroom Resources
NSF-Wide Investments


Press Release 06-040
Easy Up, Not-So-Easy Down

Builders replace bridge in only days using lightweight, corrosion-resistant composites

Fiberglass-polymer composites form the core of a renovated bridge deck in Springfield, Mo.

Fiberglass-polymer composites form the core of a renovated bridge deck in Springfield, Mo.
Credit and Larger Version

March 2, 2006

Using new fiberglass-polymer materials, contractors in Springfield, Mo., have just subjected a decaying, 70-year-old bridge to a makeover that was as quick as it was dramatic.

Instead of snarling traffic for two to three weeks while they repaired the crumbling deck, girders and guardrails by conventional methods--laying plywood, tying steel rebar and pouring concrete--the workers used pre-fabricated plates and cages developed by a National Science Foundation (NSF)-supported university-industry partnership to finish the job in a mere five days. 

The NSF's Repair of Buildings and Bridges with Composites Industry-University Cooperative Research Center is based at the University of Missouri at Rolla and North Carolina State University.  The Missouri researchers joined with their industry partners and colleagues at the University of Wisconsin at Madison to develop the new construction solution.

The target of the makeover, an old bridge on Farm Road 148 near Springfield, was one of as many as 156,000 U.S. bridges in need of repair. In fact, it was posted, meaning that local officials had imposed a vehicle weight limit due to the dangerous bridge conditions. Now, however, a fresh layer of concrete conceals the technology responsible for the rapid replacement of the bridge’s crumbling deck and guardrails.

"A key to tackling the challenge of making thousands of deficient bridges in the nation fully operational and safe again is the development of convenient solutions for the rapid construction of long-lasting bridges," says Fabio Matta, a Ph.D. candidate in structural engineering who helped develop the new construction system.  "Advanced composites make the margin for improvements exceptional," he added.

The fiberglass-polymer composites are strong enough to endure several decades of traffic--and unlike steel, will resist the ravages of salt and other corrosive de-icers for just as long. Due to the lightweight and prefabricated nature of the materials, moreover, workers can put the structures in place quickly, saving both time and commuter headaches.

"Since its inception in 1998, we have worked with our NSF I/UCRC partners to provide solutions for our ageing infrastructure," says Antonio Nanni, director of the Missouri center.

"We have demonstrated the economical and technical feasibility of several very attractive technologies," Nanni added. "Their full deployment will become possible only with the modification of existing codes and standards.  It is a long process, but we are seeing light at the end of the tunnel."

The bridge, renovated with a grant from the U.S. Department of Transportation, was rededicated on Feb. 22, 2006.

-NSF-

Media Contacts
Joshua A. Chamot, NSF (703) 292-7730 jchamot@nsf.gov
Mindy Limback, University of Missouri at Rolla (573) 341-4268 limbackm@umr.edu

Program Contacts
Alex Schwarzkopf, NSF (703) 292-5359 aschwarz@nsf.gov

Principal Investigators
Antonio Nanni, University of Missouri at Rolla (573) 341-4497 nanni@umr.edu

Co-Investigators
Fabio Matta, University of Missouri at Rolla (573) 341-6661 mattaf@umr.edu

Related Websites
University of Missouri at Rolla I/UCRC homepage: http://campus.umr.edu/rb2c/
Federal Highway Administration bridge safety statistics: http://www.fhwa.dot.gov/bridge/nbi.htm
Information on the NSF I/UCRC program: http://www.nsf.gov/funding/pgm_summ.jsp?pims_id=5501&from=fund
The University of Missouri at Rolla press release provides additional details.: http://news.umr.edu/news/2006/GreeneCoBridge.html

The National Science Foundation (NSF) is an independent federal agency that supports fundamental research and education across all fields of science and engineering, with an annual budget of $6.06 billion. NSF funds reach all 50 states through grants to over 1,900 universities and institutions. Each year, NSF receives about 45,000 competitive requests for funding, and makes over 11,500 new funding awards. NSF also awards over $400 million in professional and service contracts yearly.

 Get News Updates by Email 

Useful NSF Web Sites:
NSF Home Page: http://www.nsf.gov
NSF News: http://www.nsf.gov/news/
For the News Media: http://www.nsf.gov/news/newsroom.jsp
Science and Engineering Statistics: http://www.nsf.gov/statistics/
Awards Searches: http://www.nsf.gov/awardsearch/

 

A small crane can lift and position the enormous fiberglass-polymer composite plates
A small crane can lift and position the enormous fiberglass-polymer composite plates.
Credit and Larger Version

The new composites were critical for both the bridge deck renovation and the guardrail replacement
The new composites were critical for both the bridge deck renovation and the guardrail replacement.
Credit and Larger Version

Workers covered the composites with concrete in the final steps of the bridge renovation
Workers covered the composites with concrete in the final steps of the bridge renovation
Credit and Larger Version

Before renovation, the guardrails on this Springfield, Mo., bridge were in dire need of repair
Before renovation, the guardrails on this Springfield, Mo., bridge were in dire need of repair.
Credit and Larger Version

Before renovation, the underside of this Springfield, Mo., bridge deck was cracked and decaying
Before renovation, the underside of this Springfield, Mo., bridge deck was cracked and decaying.
Credit and Larger Version



Print this page
Back to Top of page
  Web Policies and Important Links | Privacy | FOIA | Help | Contact NSF | Contact Webmaster | SiteMap  
National Science Foundation Engineering (ENG)
The National Science Foundation, 4201 Wilson Boulevard, Arlington, Virginia 22230, USA
Tel:  (703) 292-5111, FIRS: (800) 877-8339 | TDD: (800) 281-8749
Last Updated:
March 2, 2006
Text Only


Last Updated: March 2, 2006