Documents
Documents are provided in "Portable Document Format" (pdf) and must be viewed using Adobe Acrobat Reader or comparable viewer. A free downloadable copy of Adobe Acrobat Reader is available from Adobe.
Warning! Some items are more than 100 kbytes in size. Users with slow modems may experience delays in downloading each file.
Final Supplemental Integrated Feasibility Report and Environmental Impact Statement - January 2003
- Volume 1
- Entire Final Supplemental Integrated Feasibility Report and Environmental Impact Statement July 2002 -- 18.6 Mbytes
- Abbreviations and Acronyms -- 182 Kbytes
- Executive Summary -- 143 Kbytes
- Table of Contents -- 155 Kbytes
- Chapter 1 Introduction -- 257 Kbytes
- Chapter 2 Study Area Description -- 123 Kbytes
- Chapter 3 Needs and Opportunities -- 263 Kbytes
- Chapter 4 Alternatives -- 17.8 Mbytes
- Chapter 5 Affected Environment -- 122 Kbytes
- Chapter 6 Environmental Consequences -- 522 Kbytes
- Chapter 7 Coordination and Public Involvement -- 142 Kbytes
- Chapter 8 Project Implementation -- 198 Kbytes
- Chapter 9 Conclusions -- 170 Kbytes
- List of Preparers -- 110 Kbytes
- Glossary -- 181 Kbytes
- Index -- 143 Kbytes
- Literature Cited -- 146 Kbytes
- Volume 2
- Exhibits 1 of 2 -- 1.54 Mbytes
- Preface for Exhibits -- 197.4 Kbytes
- Exhibit E Section 404(B)(1) Evaluatopn (Revised) -- 267 Kbytes
- Exhibit F Coastal Zone Management Consistency Determination (Revised) -- 272 Kbytes
- Exhibit I Essential Fish Habitat Assessment (Revised) -- 245 Kbytes
- Exhibit J Columbia River Sedimentation Impacts Analysis (Revised) -- 2.53 Mbytes
- Exhibit K1 Evaluation Report White and Green Sturgeon (Revised) -- 338 Kbytes
- Exhibit K2 Evaluation Report Smelt (Revised) -- 1.12 Mbytes
- Exhibit K3 Evaluation Report Fish Stranding (Revised) -- 1.53 Mbytes
- Exhibit K4 Evaluation Report Dungeness Crabs (Revised) -- 772 Kbytes
- Exhibit K4 Appendix A Evaluation Report Dungeness Crab (Revised) -- 1.61 Mbytes
- Exhibit K4 Appendix B Evaluation Report Dungeness Crab (Revised) -- 4.7 Mbytes
- Exhibit K5 Wildlife and Wetland Mitigation (Revised) -- 259 Kbytes
- Exhibit K6 Royalty Fees for State-owned Dredged Materials (Revised) -- 1.03 Mbytes
- Exhibit K7 Evaluation Report Flood Plains (Revised) -- 416 Kbytes
- Exhibit K8 Consistency with Critical Areas Ordinances Including Wetland Mitigation (Revised) -- 439 Kbytes
- Exhibit K9 Consistency With Washington Local Shoreline Master Programs (Revised) -- 197 Kbytes
- Volume 3
- Exhibits 2 of 2 -- 39.8 Mbytes
- Preface for Exhibits -- 196 Kbytes
- Exhibit L Cost Estimate Summary (Revised) -- 2.70 Mbytes
- Exhibit M Economic Analysis (Revised) -- 455 Kbytes
- Exhibit N Physical and Biological Studies of the Deep Water and Shallow Water Sites
- Exhibit N Attachment A Sediment Trend Analysis and Accoustic Bottom Classification -- 2.6 Mbytes
- Exhibit N Appendix 1 Sediment Transport Model -- 1.13 Mbytes
- Exhibit N Appendix 2 Acoustic Bottom Classification Data Analysis and Results -- 1.24 Mbytes
- Exhibit N Appendix 3 Grain Size Analysis Report -- 1.63 Mbytes
- Exhibit N Appendix 4 Sediment Trend Statistics for all Sample Lines -- 636 Kbytes
- Exhibit N Appendix 5 Representative D1, D2, and X-Functions -- 196 Kbytes
- Exhibit N Attachment B Physical Baseline Study Sediment Characterization Deep Water Site -- 14.5 Mbytes
- Exhibit N Attachment C Physical Baseline Study Seafloor Mapping Survey (Side Scan Sonar and Acoustic Sediment Classification) Deep Water Site -- 8.08 Mbytes
- Exhibit N Attachment D Biological Baseline Study Deep Water Site and Crab Abundance Study Shallow Water Site -- 6.51 Mbytes
- Volume 4
- Comment Letters on the Draft SEIS and Corps Responses -- 3.74 Mbytes
- Table of Contents -- 121 Kbytes
- Letters From Federal Agencies -- 167 Kbytes
- Letters From State Agencies -- 569 Kbytes
- Letters From Counties -- 144 Kbytes
- Letters From Stakeholdes and Special Interest Groups -- 1.64 Mbytes
- Letters From Individuals -- 1.39 Mbytes
- Volume 5
- Public Testimony -- 553 Kbytes
- Table of Contents -- 142 Kbytes
- Vancouver, Washington (Afternoon Session) Public Hearing, July 31, 2002 -- 152 Kbytes
- Vancouver, Washington (Evening Session) Public Hearing, July 31, 2002 -- 97.1 Kbytes
- Longview, Washington Public Hearing, September 5, 2002 -- 157 Kbytes
- Astoria, Oregon Public Hearing, September 10, 2002 -- 161 Kbytes
- ERRATA SHEET For Columbia River Channel Improvement Project Final Supplemental Integrated Feasibility Report and Environmental Impact Statement - Feb. 11, 2003
- ADDENDUM - November 2003