Combined Sewer Overflows Nine Minimum Controls
- Proper operation and regular maintenance programs for the sewer system and the CSOs
- Maximum use of the collection system for storage
- Review and modification of pretreatment requirements to assure CSO impacts are minimized
- Maximization of flow to the publicly owned treatment works for treatment
- Prohibition of CSOs during dry weather
- Control of solid and floatable materials in CSOs
- Pollution prevention
- Public notification to ensure that the public receives adequate notification of CSO occurrences and CSO impacts
- Monitoring to effectively characterize CSO impacts and the efficacy of CSO controls
EPA's Guidance for Nine Minimum Controls [PDF Format] describes the nine minimum controls, and EPA's expectations for their implementation, in more detail.
|
|
|
|
|