Schedule of Peer Reviews |
|
Scientific Quality Review
Directions for Setting Termination Dates |
The dates listed are projected. Actual dates are announced at the beginning of each peer review session. For efficiency, we simply calculate the termination date as 6 months beyond the projected implementation date. If you have used a different date, there’s no need to change it if it’s beyond the projected implementation date. This method eases our coordination in the event peer review sessions are added or postponed. |
|
Animal Production & Protection |
Nutrition, Food Safety/Quality
|
Natural Resources and Sustainable Agricultural Systems |
Crop Production & Protection
|
|
|
|
|
|
Review Title NP 101 Food Animal Production 2008 Ad Hoc Review |
Termination Date May 31, 2009 |
Program Analyst: Chris |
Number of Projects in the Review 2 |
Planned Duration 48 months |
Status of Reviews Revision and certifications are in progress. |
Concurrence Memo Due to Area Director |
September 18, 2007 - complete |
PDRAMs Due to Area & OSQR with Schedule |
October 16, 2007 - complete |
Conflicts of Interest List Due to OSQR |
October 30, 2007 - complete |
Approved PPOs Due to Area and OSQR from NPS |
February 12, 2008 - complete |
Project Plans due to OSQR |
June 3, 2008-complete |
Review Period |
June 4-September 9, 2008 |
Project's Targeted Implementation Date |
November 4, 2008 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 101 Food Animal Production Panel Review |
Termination Date March 30, 2013 |
Program Analyst: Chris |
Number of Projects in the Review 32 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. Existing ARS projects entering or modifed under the Food Animal Production Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
July 29, 2011 |
PDRAMs Due to Area & OSQR with Schedule |
August 26, 2011 |
Conflicts of Interest List Due to OSQR |
September 8, 2011 |
Approved PPOs Due to Area and OSQR from NPS |
December 23, 2011 |
Project Plans due to OSQR |
April 13, 2012 |
Review Period |
April 16-July 20, 2012 |
Project's Targeted Implementation Date |
September 14, 2012 |
Ad Hoc Cut-Off Date July 29, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 103 Animal Health 2008 Ad Hoc Review |
Termination Date May 31, 2009 |
Program Analyst: Chris |
Number of Projects in the Review 4 |
Planned Duration 35 months |
Status of Reviews Revision and certifications are in progress. |
Concurrence Memo Due to Area Director |
September 18, 2007-complete |
PDRAMs Due to Area & OSQR with Schedule |
October 16, 2007-complete |
Conflicts of Interest List Due to OSQR |
October 30, 2007-Complete |
Approved PPOs Due to Area and OSQR from NPS |
February 12, 2008-complete |
Project Plans due to OSQR |
June 3, 2008-complete |
Review Period |
June 4-September 9, 2008 |
Project's Targeted Implementation Date |
November 4, 2008 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 103 Animal Health Ad Hoc Review (2008) |
Termination Date October 31, 2009 |
Program Analyst: Chris |
Number of Projects in the Review 1 |
Planned Duration 30 months |
Status of Reviews Project plan is due to OSQR November 21, 2008. |
Concurrence Memo Due to Area Director |
March 28, 2008-complete |
PDRAMs Due to Area & OSQR with Schedule |
July 17, 2008-complete |
Conflicts of Interest List Due to OSQR |
August 1, 2008-complete |
Approved PPOs Due to Area and OSQR from NPS |
August 1, 2008-complete |
Project Plans due to OSQR |
November 21, 2008 |
Review Period |
November 24, 2008-February 27, 2009 |
Project's Targeted Implementation Date |
April 24, 2009 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 103 Animal Health Panel Review |
Termination Date April 30, 2012 |
Program Analyst: Chris |
Number of Projects in the Review 45 |
Planned Duration 60 months |
Status of Reviews Long term planning in progress. Existing ARS projects entering or modifed under the Animal Health Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
September 1, 2010 |
PDRAMs Due to Area & OSQR with Schedule |
September 29, 2010 |
Conflicts of Interest List Due to OSQR |
October 13, 2010 |
Approved PPOs Due to Area and OSQR from NPS |
January 26, 2011 |
Project Plans due to OSQR |
May 18, 2011 |
Review Period |
May 19 - August 24, 2011 |
Project's Targeted Implementation Date |
October 19, 2011 |
Ad Hoc Cut-Off Date September 1, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 104 Veterinary, Medical and Urban Entomology Panel Review |
Termination Date March 31, 2010 |
Program Analyst: Chris |
Number of Projects in the Review 17 |
Planned Duration 60 months |
Status of Reviews PPOs are due to Area and OSQR December 22, 2008. |
Concurrence Memo Due to Area Director |
July 28, 2008 |
PDRAMs Due to Area & OSQR with Schedule |
August 25, 2008-complete |
Conflicts of Interest List Due to OSQR |
September 8, 2008-complete |
Approved PPOs Due to Area and OSQR from NPS |
December 22, 2008 |
Project Plans due to OSQR |
April 13, 2009 |
Review Period |
April 14 - July 20, 2009 |
Project's Targeted Implementation Date |
September 14, 2009 |
Ad Hoc Cut-Off Date July 28, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 106 Aquaculture Panel Review |
Termination Date June 30, 2010 |
Program Analyst: Chris |
Number of Projects in the Review 25 |
Planned Duration 60 months |
Status of Reviews PDRAMs are due to OSQR October 21, 2008. |
Concurrence Memo Due to Area Director |
September 23, 2008 |
PDRAMs Due to Area & OSQR with Schedule |
October 21, 2008 |
Conflicts of Interest List Due to OSQR |
November 4, 2008 |
Approved PPOs Due to Area and OSQR from NPS |
March 20, 2009 |
Project Plans due to OSQR |
July 10, 2009 |
Review Period |
July 13 - October 16, 2009 |
Project's Targeted Implementation Date |
December 11, 2009 |
Ad Hoc Cut-Off Date August 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 107 Human Nutrition December 2009 Ad Hoc Review |
Termination Date October 31, 2010 |
Program Analyst: |
Number of Projects in the Review 5 |
Planned Duration |
Status of Reviews Prelimary planning. |
Concurrence Memo Due to Area Director |
April 7, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
April 14, 2009 |
Conflicts of Interest List Due to OSQR |
April 28, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
August 11, 2009 |
Project Plans due to OSQR |
December 1, 2009 |
Review Period |
December 2, 2009-February 9, 2010 |
Project's Targeted Implementation Date |
April 19, 2010 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 107 Human Nutrition June 2009 Ad Hoc Review |
Termination Date May 30, 2010 |
Program Analyst: Chris |
Number of Projects in the Review 5 |
Planned Duration 48 months |
Status of Reviews PDRAMs are due to OSQR October 17, 2008. |
Concurrence Memo Due to Area Director |
October 10, 2008 |
PDRAMs Due to Area & OSQR with Schedule |
October 17, 2008 |
Conflicts of Interest List Due to OSQR |
October 31, 2008 |
Approved PPOs Due to Area and OSQR from NPS |
February 13, 2009 |
Project Plans due to OSQR |
June 5, 2009 |
Review Period |
June 8-September 11, 2009 |
Project's Targeted Implementation Date |
November 20, 2009 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 107 Human Nutrition Panel Review - Schedule A |
Termination Date June 30, 2009 |
Program Analyst: Chris |
Number of Projects in the Review 65 |
Planned Duration 60 months |
Status of Reviews Reviews are in progress. |
Concurrence Memo Due to Area Director |
September 28, 2007-complete |
PDRAMs Due to Area & OSQR with Schedule |
October 26, 2007-complete |
Conflicts of Interest List Due to OSQR |
November 8, 2007-complete |
Approved PPOs Due to Area and OSQR from NPS |
February 22, 2008-complete |
Project Plans due to OSQR |
June 13, 2008-complete |
Review Period |
June 16 - September 19, 2008 |
Project's Targeted Implementation Date |
December 22, 2008 |
Ad Hoc Cut-Off Date August 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 107 Human Nutrition Panel Review - Schedule B |
Termination Date June 30, 2009 |
Program Analyst: Chris |
Number of Projects in the Review 65 |
Planned Duration 60 months |
Status of Reviews Reviews are in progress. |
Concurrence Memo Due to Area Director |
September 28, 2007-complete |
PDRAMs Due to Area & OSQR with Schedule |
December 3, 2007-complete |
Conflicts of Interest List Due to OSQR |
December 17, 2007-complete |
Approved PPOs Due to Area and OSQR from NPS |
March 31, 2008-complete |
Project Plans due to OSQR |
July 21, 2008-complete |
Review Period |
July 22 - October 27, 2008 |
Project's Targeted Implementation Date |
December 22, 2008 |
Ad Hoc Cut-Off Date August 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 108 Food Safety Panel Review |
Termination Date August 31, 2011 |
Program Analyst: Chris |
Number of Projects in the Review 68 |
Planned Duration 60 months |
Status of Reviews Long term planning in progress. No new ad hocs are being scheduled for this program. |
Concurrence Memo Due to Area Director |
January 8, 2010 |
PDRAMs Due to Area & OSQR with Schedule |
January 15, 2010 |
Conflicts of Interest List Due to OSQR |
January 29, 2010 |
Approved PPOs Due to Area and OSQR from NPS |
May 14, 2010 |
Project Plans due to OSQR |
September 3, 2010 |
Review Period |
September 6-December 10, 2010 |
Project's Targeted Implementation Date |
February 18, 2011 |
Ad Hoc Cut-Off Date October 6, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 202 Soil Resource Management Panel Review |
Termination Date December 31, 2011 |
Program Analyst: Linda |
Number of Projects in the Review 25 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled in this program. |
Concurrence Memo Due to Area Director |
May 19, 2010 |
PDRAMs Due to Area & OSQR with Schedule |
May 26, 2010 |
Conflicts of Interest List Due to OSQR |
June 9, 2010 |
Approved PPOs Due to Area and OSQR from NPS |
September 22, 2010 |
Project Plans due to OSQR |
January 12, 2011 |
Review Period |
January 13 - April 20, 2011 |
Project's Targeted Implementation Date |
June 15, 2011 |
Ad Hoc Cut-Off Date May 19, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 203/204/212 Soil and Air Resource Management Panel Review |
Termination Date October 31, 2010 |
Program Analyst: Chris |
Number of Projects in the Review 20 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled in this program. |
Concurrence Memo Due to Area Director |
February 18, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
March 18, 2009 |
Conflicts of Interest List Due to OSQR |
April 1, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
July 15, 2009 |
Project Plans due to OSQR |
November 4, 2009 |
Review Period |
November 5 - February 10, 2010 |
Project's Targeted Implementation Date |
April 7, 2010 |
Ad Hoc Cut-Off Date December 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 206 Manure and Byproduct Utilization Panel Review |
Termination Date March 31, 2011 |
Program Analyst: Chris |
Number of Projects in the Review 27 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. Existing ARS projects entered or modified under the Manure and Byproduct Utilization National Program must be considered for an updated peer review. No new ad hocs are being scheduled for this program. |
Concurrence Memo Due to Area Director |
July 28, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
August 25, 2009 |
Conflicts of Interest List Due to OSQR |
September 8, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
December 22, 2009 |
Project Plans due to OSQR |
April 13, 2010 |
Review Period |
April 14 - July 20, 2010 |
Project's Targeted Implementation Date |
September 14, 2010 |
Ad Hoc Cut-Off Date July 28, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 207/216 Agricultural System Competiveness and Sustainability Panel Review |
Termination Date January 31, 2009 |
Program Analyst: Chris |
Number of Projects in the Review 21 |
Planned Duration 60 months |
Status of Reviews Revision and certification in progress. |
Concurrence Memo Due to Area Director |
June 1, 2007-complete |
PDRAMs Due to Area & OSQR with Schedule |
June 29, 2007-complete |
Conflicts of Interest List Due to OSQR |
July 12, 2007-complete |
Approved PPOs Due to Area and OSQR from NPS |
November 9, 2007-complete |
Project Plans due to OSQR |
February 29, 2008-complete |
Review Period |
March 3 - June 2, 2008-complete |
Project's Targeted Implementation Date |
July 28, 2008 |
Ad Hoc Cut-Off Date April 30, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 211 Water Availability and Watershed Management 2009 Ad Hoc Review |
Termination Date May 31, 2010 |
Program Analyst: Chris |
Number of Projects in the Review 1 |
Planned Duration 24 months |
Status of Reviews PDRAMs are due to OSQR October 17, 2008. |
Concurrence Memo Due to Area Director |
October 10, 2008 |
PDRAMs Due to Area & OSQR with Schedule |
October 17, 2008 |
Conflicts of Interest List Due to OSQR |
October 31, 2008 |
Approved PPOs Due to Area and OSQR from NPS |
February 13, 2009 |
Project Plans due to OSQR |
June 5, 2009 |
Review Period |
June 8 - September 11, 2009 |
Project's Targeted Implementation Date |
November 20, 2009 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 211 Water Availability and Watershed Management Panel Review |
Termination Date August 31, 2012 |
Program Analyst: Chris |
Number of Projects in the Review 49 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Water Availabilty and Watershed Management National Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
January 12, 2011 |
PDRAMs Due to Area & OSQR with Schedule |
January 19, 2011 |
Conflicts of Interest List Due to OSQR |
February 2, 2011 |
Approved PPOs Due to Area and OSQR from NPS |
May 18, 2011 |
Project Plans due to OSQR |
September 7, 2011 |
Review Period |
September 8-December 14, 2011 |
Project's Targeted Implementation Date |
February 12, 2012 |
Ad Hoc Cut-Off Date November 27, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 215 Pasture, Forage, Turf and Rangeland Systems 2008 Ad Hoc Review |
Termination Date May 31, 2009 |
Program Analyst: Chris |
Number of Projects in the Review 1 |
Planned Duration 48 months |
Status of Reviews Reviews are in progress. |
Concurrence Memo Due to Area Director |
September 18, 2007-complete |
PDRAMs Due to Area & OSQR with Schedule |
October 16, 2007-complete |
Conflicts of Interest List Due to OSQR |
October 30, 2007-complete |
Approved PPOs Due to Area and OSQR from NPS |
February 12, 2008-complete |
Project Plans due to OSQR |
June 3, 2008-complete |
Review Period |
June 4 - September 9, 2008 |
Project's Targeted Implementation Date |
November 4, 2008 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 215 Pasture, Forage, Turf and Rangeland Systems Panel Review |
Termination Date July 30, 2013 |
Program Analyst: Chris |
Number of Projects in the Review 32 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Rangeland, Pasture and Forages National Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
December 6, 2011 |
PDRAMs Due to Area & OSQR with Schedule |
January 3, 2012 |
Conflicts of Interest List Due to OSQR |
January 17, 2012 |
Approved PPOs Due to Area and OSQR from NPS |
April 30, 2012 |
Project Plans due to OSQR |
August 20, 2012 |
Review Period |
August 21 - November 26, 2012 |
Project's Targeted Implementation Date |
January 21, 2013 |
Ad Hoc Cut-Off Date December 6, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 216 Agricultural System Competitiveness and Sustainability Ad Hoc Review (2008) |
Termination Date February 28, 2010 |
Program Analyst: Chris |
Number of Projects in the Review 1 |
Planned Duration 48 months |
Status of Reviews PPOs are due to Area and OSQR November 19, 2008. |
Concurrence Memo Due to Area Director |
July 16, 2008-Completed |
PDRAMs Due to Area & OSQR with Schedule |
July 23, 2008-Completed |
Conflicts of Interest List Due to OSQR |
August 6, 2008-Completed |
Approved PPOs Due to Area and OSQR from NPS |
November 19, 2008 |
Project Plans due to OSQR |
March 11, 2009 |
Review Period |
March 12-June 17, 2009 |
Project's Targeted Implementation Date |
August 12, 2009 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 216 Agricultural System Competiveness and Sustainability Panel Review |
Termination Date February 28, 2013 |
Program Analyst: Chris |
Number of Projects in the Review 21 |
Planned Duration 60 |
Status of Reviews Long-term planning in progress. Existing ARS projects entering or modifed under the Agricultural System Competiveness Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
July 13, 2012 |
PDRAMs Due to Area & OSQR with Schedule |
July 20, 2012 |
Conflicts of Interest List Due to OSQR |
August 3, 2012 |
Approved PPOs Due to Area and OSQR from NPS |
November 16, 2012 |
Project Plans due to OSQR |
March 8, 2013 |
Review Period |
March 11 - June 14, 2013 |
Project's Targeted Implementation Date |
August 9, 2013 |
Ad Hoc Cut-Off Date July 13, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement 2008 Ad Hoc Review |
Termination Date May 31, 2009 |
Program Analyst: Linda |
Number of Projects in the Review 1 |
Planned Duration 48 months |
Status of Reviews Reviews are in progress. |
Concurrence Memo Due to Area Director |
September 18, 2007-complete |
PDRAMs Due to Area & OSQR with Schedule |
October 16, 2007-complete |
Conflicts of Interest List Due to OSQR |
October 30, 2007-complete |
Approved PPOs Due to Area and OSQR from NPS |
February 12, 2008-complete |
Project Plans due to OSQR |
June 3, 2008-complete |
Review Period |
June 4 - September 9, 2008 |
Project's Targeted Implementation Date |
November 4, 2008 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement 2009 Ad Hoc Review |
Termination Date May 31, 2010 |
Program Analyst: Linda |
Number of Projects in the Review 3 |
Planned Duration 40 months |
Status of Reviews Preliminary planning. |
Concurrence Memo Due to Area Director |
October 10, 2008 |
PDRAMs Due to Area & OSQR with Schedule |
October 17, 2008 |
Conflicts of Interest List Due to OSQR |
October 31, 2008 |
Approved PPOs Due to Area and OSQR from NPS |
February 13, 2009 |
Project Plans due to OSQR |
June 5, 2009 |
Review Period |
June 8 - September 11, 2009 |
Project's Targeted Implementation Date |
November 20, 2009 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review |
Termination Date April 30, 2014 |
Program Analyst: Linda |
Number of Projects in the Review 125 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement National Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
September 28, 2012 |
PDRAMs Due to Area & OSQR with Schedule |
October 5, 2012 |
Conflicts of Interest List Due to OSQR |
October 19, 2012 |
Approved PPOs Due to Area and OSQR from NPS |
February 1, 2013 |
Project Plans due to OSQR |
May 24, 2013 |
Review Period |
May 27-August 30, 2013 |
Project's Targeted Implementation Date |
October 25, 2013 |
Ad Hoc Cut-Off Date September 28, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 302 Plant Biological and Molecular Processes Panel Review |
Termination Date September 30, 2011 |
Program Analyst: Chris |
Number of Projects in the Review 43 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this program. |
Concurrence Memo Due to Area Director |
January 25, 2010 |
PDRAMs Due to Area & OSQR with Schedule |
February 22, 2010 |
Conflicts of Interest List Due to OSQR |
March 8, 2010 |
Approved PPOs Due to Area and OSQR from NPS |
June 21, 2010 |
Project Plans due to OSQR |
October 12, 2010 |
Review Period |
October 13, 2010 - January 17, 2011 |
Project's Targeted Implementation Date |
March 14, 2011 |
Ad Hoc Cut-Off Date January 25, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 303 Plant Diseases 2008 Ad Hoc Review |
Termination Date May 31, 2009 |
Program Analyst: Linda |
Number of Projects in the Review 3 |
Planned Duration 48 months |
Status of Reviews Reviews are in progress. |
Concurrence Memo Due to Area Director |
September 18, 2007-complete |
PDRAMs Due to Area & OSQR with Schedule |
October 16, 2007-complete |
Conflicts of Interest List Due to OSQR |
October 30, 2007-complete |
Approved PPOs Due to Area and OSQR from NPS |
February 12, 2008-complete |
Project Plans due to OSQR |
June 3, 2008-complete |
Review Period |
June 4 - September 9, 2008 |
Project's Targeted Implementation Date |
November 4, 2008 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 303 Plant Diseases 2009 Ad Hoc Review |
Termination Date May 31, 2010 |
Program Analyst: Linda |
Number of Projects in the Review 4 |
Planned Duration 40 months |
Status of Reviews PDRAMs are due to OSQR October 17, 2008. |
Concurrence Memo Due to Area Director |
October 10, 2008 |
PDRAMs Due to Area & OSQR with Schedule |
October 17, 2008 |
Conflicts of Interest List Due to OSQR |
October 31, 2008 |
Approved PPOs Due to Area and OSQR from NPS |
February 13, 2009 |
Project Plans due to OSQR |
June 5, 2009 |
Review Period |
June 8 - September 11, 2009 |
Project's Targeted Implementation Date |
November 20, 2009 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 303 Plant Diseases Panel Review |
Termination Date September 30, 2012 |
Program Analyst: Linda |
Number of Projects in the Review 70 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Plant Diseases National Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
January 28, 2011 |
PDRAMs Due to Area & OSQR with Schedule |
February 25, 2011 |
Conflicts of Interest List Due to OSQR |
March 11, 2011 |
Approved PPOs Due to Area and OSQR from NPS |
June 24, 2011 |
Project Plans due to OSQR |
October 14, 2011 |
Review Period |
October 17 - January 20, 2012 |
Project's Targeted Implementation Date |
March 16, 2012 |
Ad Hoc Cut-Off Date January 28, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule A |
Termination Date April 30, 2011 |
Program Analyst: Linda |
Number of Projects in the Review 87 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled in this program. |
Concurrence Memo Due to Area Director |
June 22, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
July 17, 2009 |
Conflicts of Interest List Due to OSQR |
July 31, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
November 13, 2009 |
Project Plans due to OSQR |
March 5, 2010 |
Review Period |
March 8 - June 11, 2010 |
Project's Targeted Implementation Date |
October 4, 2010 |
Ad Hoc Cut-Off Date December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule B |
Termination Date April 30, 2011 |
Program Analyst: Linda |
Number of Projects in the Review 87 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled in this program. |
Concurrence Memo Due to Area Director |
June 22, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
August 18, 2009 |
Conflicts of Interest List Due to OSQR |
September 1, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
December 15, 2009 |
Project Plans due to OSQR |
April 6, 2010 |
Review Period |
April 7 - July 13, 2010 |
Project's Targeted Implementation Date |
October 4, 2010 |
Ad Hoc Cut-Off Date December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule C |
Termination Date April 30, 2011 |
Program Analyst: Linda |
Number of Projects in the Review 87 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled in this program. |
Concurrence Memo Due to Area Director |
June 22, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
September 14, 2009 |
Conflicts of Interest List Due to OSQR |
September 28, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
January 11, 2010 |
Project Plans due to OSQR |
May 3, 2010 |
Review Period |
May 4 - August 9, 2010 |
Project's Targeted Implementation Date |
October 4, 2010 |
Ad Hoc Cut-Off Date December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 305 Crop Production 2009 Ad Hoc Review |
Termination Date May 31, 2010 |
Program Analyst: Linda |
Number of Projects in the Review 2 |
Planned Duration 48 months |
Status of Reviews PDRAMs are due to OSQR October 17, 2009. |
Concurrence Memo Due to Area Director |
October 10, 2008 |
PDRAMs Due to Area & OSQR with Schedule |
October 17, 2008 |
Conflicts of Interest List Due to OSQR |
October 31, 2008 |
Approved PPOs Due to Area and OSQR from NPS |
December 19, 2008 |
Project Plans due to OSQR |
June 5, 2009 |
Review Period |
June 8 - September 11, 2009 |
Project's Targeted Implementation Date |
November 20, 2009 |
Ad Hoc Cut-Off Date N/A | |
Review Title NP 305 Crop Production Panel Review |
Termination Date March 31, 2009 |
Program Analyst: Linda |
Number of Projects in the Review 23 |
Planned Duration 60 months |
Status of Reviews Revision and certifications are in progress. |
Concurrence Memo Due to Area Director |
August 8, 2007-complete |
PDRAMs Due to Area & OSQR with Schedule |
September 5, 2007-complete |
Conflicts of Interest List Due to OSQR |
September 19, 2007-complete |
Approved PPOs Due to Area and OSQR from NPS |
January 2, 2008-complete |
Project Plans due to OSQR |
April 23, 2008-complete |
Review Period |
April 24 - July 30, 2008 |
Project's Targeted Implementation Date |
September 24, 2008 |
Ad Hoc Cut-Off Date April 30, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 305 Crop Production Panel Review - Future |
Termination Date May 31, 2014 |
Program Analyst: Linda |
Number of Projects in the Review 24 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. Existing ARS projects entering or modifed under the Crop Production Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
November 2, 2012 |
PDRAMs Due to Area & OSQR with Schedule |
November 9, 2012 |
Conflicts of Interest List Due to OSQR |
November 23, 2012 |
Approved PPOs Due to Area and OSQR from NPS |
March 8, 2013 |
Project Plans due to OSQR |
June 28, 2013 |
Review Period |
July 1 - October 4, 2013 |
Project's Targeted Implementation Date |
November 29, 2013 |
Ad Hoc Cut-Off Date November 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review - Schedule A |
Termination Date January 31, 2011 |
Program Analyst: Linda |
Number of Projects in the Review 88 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this program. |
Concurrence Memo Due to Area Director |
March 30, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
April 27, 2009 |
Conflicts of Interest List Due to OSQR |
May 11, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
August 24, 2009 |
Project Plans due to OSQR |
December 14, 2009 |
Review Period |
December 15, 2009 - March 22, 2010 |
Project's Targeted Implementation Date |
July 13, 2010 |
Ad Hoc Cut-Off Date March 30, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review - Schedule B |
Termination Date January 31, 2011 |
Program Analyst: Linda |
Number of Projects in the Review 88 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this program. |
Concurrence Memo Due to Area Director |
March 30, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
May 26, 2009 |
Conflicts of Interest List Due to OSQR |
June 9, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
September 22, 2009 |
Project Plans due to OSQR |
January 12, 2010 |
Review Period |
January 13 - April 20, 2010 |
Project's Targeted Implementation Date |
July 13, 2010 |
Ad Hoc Cut-Off Date March 30, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review - Schedule C |
Termination Date January 31, 2011 |
Program Analyst: Linda |
Number of Projects in the Review 88 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this program. |
Concurrence Memo Due to Area Director |
March 30, 2009 |
PDRAMs Due to Area & OSQR with Schedule |
June 23, 2009 |
Conflicts of Interest List Due to OSQR |
July 6, 2009 |
Approved PPOs Due to Area and OSQR from NPS |
October 20, 2009 |
Project Plans due to OSQR |
February 9, 2010 |
Review Period |
February 10 - May 18, 2010 |
Project's Targeted Implementation Date |
July 13, 2010 |
Ad Hoc Cut-Off Date March 30, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 307 Bioenergy and Energy Alternatives Panel Review |
Termination Date April 30, 2010 |
Program Analyst: Linda |
Number of Projects in the Review 15 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled for this program. |
Concurrence Memo Due to Area Director |
September 1, 2008-complete |
PDRAMs Due to Area & OSQR with Schedule |
September 29, 2008 |
Conflicts of Interest List Due to OSQR |
October 14, 2008 |
Approved PPOs Due to Area and OSQR from NPS |
January 26, 2009 |
Project Plans due to OSQR |
May 18, 2009 |
Review Period |
May 19 - August 24, 2009 |
Project's Targeted Implementation Date |
October 19, 2009 |
Ad Hoc Cut-Off Date June 30, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
Review Title NP 308 Methyl Bromide Panel Review |
Termination Date May 31, 2013 |
Program Analyst: Linda |
Number of Projects in the Review 16 |
Planned Duration 60 months |
Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Methyl Bromide National Program must be considered for an updated peer review. |
Concurrence Memo Due to Area Director |
September 28, 2011 |
PDRAMs Due to Area & OSQR with Schedule |
October 26, 2011 |
Conflicts of Interest List Due to OSQR |
November 8, 2011 |
Approved PPOs Due to Area and OSQR from NPS |
February 22, 2012 |
Project Plans due to OSQR |
June 13, 2012 |
Review Period |
June 14 - September 19, 2012 |
Project's Targeted Implementation Date |
November 14, 2012 |
Ad Hoc Cut-Off Date September 28, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | | |
|
|
|
|