WBV 46.1 Phase 1: This ongoing contract is for the construction of a sector gate in the Harvey Canal and 500 feet of connecting concrete floodwalls for hurricane storm surge protection. The 125 foot wide metal sector gate will be located just down stream of the Lapalco Overpass.

WBV 46.1 Phase 2: This contract involves raising the sector gate structure in the Harvey Canal and its 500 feet of connecting concrete floodwalls to the 100 year level of protection. The sector gate will be located just down stream of the Lapalco Overpass.


CONTRACT iNFORMATION

Award Date Phase 1 12-16-2003
Award Value
$35.69M
Award Date Phase 2 Q 2 2009
Award Value
$5-20M