Description
Already built to authorized level of protection.
PS fronting protection, modifications, floodwall tie-ins to the 100
year. This contract involves the installation of
fronting protection for the pumping station and modification to the
existing facilities bringing them to the 100 year level of protection.
The fronting protection will involve the construction of sluice gates
and modifications will include the construction of higher floodwalls
at the discharge point.
|