Description
Pump Station fronting protection, modifications, floodwall tie-ins to
the 100 year protection. This contract involves the installation of fronting
protection for the pumping station and modification to the existing
facilities bringing them to the 100 year level of protection. The
fronting protection will involve the construction of sluice gates and
modifications will include the construction of higher floodwalls at
the discharge point.
|