Description
Fronting Protection and
Modifications, Floodwall tie-ins to the 100 year protection. - Phase
1 This contract involves the installation of fronting protection for
the pumping station and modification to the existing facilities
bringing them to the 100 year level of protection. The fronting
protection will involve the construction of sluice gates and
modifications will include the construction of higher floodwalls at
the discharge point
|