Project Code |
Contract |
Contracting
Package |
Contracting Estimates
(in millions) |
Contract Awards
(Quarters based on calendar year) |
LPV-101.02 |
Lakefront Levee OEB - 17th St. Canal to Topaz |
Unrestricted - Best Value |
20-50 |
Q 4 2009 |
LPV-102.01 |
Lakefront Levee OEB - Topaz to Orleans Canal |
HUBZONE - MATOC |
1.10 |
10 03 07 |
LPV-102.02 |
Lakefront Levee OEB - Topaz to Orleans Canal |
HUBZONE - MATOC |
0-5 |
Q 2 2009 |
LPV-103.01 |
Lakefront Levee OEB - Orleans Canal to London Ave |
HUBZONE - MATOC |
5.20 |
1 -03 07 |
LPV-103.01a |
Lakefront Levee OEB - Orleans Canal to London Ave - Phase 1A |
Unrestricted - Best Value |
5-20 |
Q 2 2009 |
LPV-103.01a2 |
Lakefront Levee OEB - London Ave - to IHNC |
Unrestricted - Best Value |
5-20 |
Q 1 2009 |
LPV-104.01 |
Lakefront Levee OEB - London Avenue Canal to IHNC |
HUBZONE - MATOC |
1.29 |
07 13 07 |
LPV-104.01a |
Lakefront Levee OEB - London Avenue Canal to IHNC -Phase 1A |
HUBZONE - MATOC |
5-20M |
Q 1 2009 |
LPV-104.02 |
Lakefront Levee OEB - London Ave Canal to IHNC |
Unrestricted - Best Value |
20-50 |
Q 2 2009 |
LPV-105.01
|
Lakefront Airport Floodwalls |
Unrestricted - Best Value |
50-100 |
Q 1 2010 |
LPV-105.02 |
T-wall existing alignment- Lakefront Airport - East |
Unrestricted -Best Value |
20-50 |
Q 1 2010 |
LPV-106 |
Citrus Lakefront Levee (west of Paris Road) |
Unrestricted |
100M+ |
Q 4 2009 |
LPV-107 |
Replace Gate at Lincoln Beach Floodwall |
HUBZONE |
5-20 |
Q 4 2009 |
LPV-108 |
Raise Levee - Paris Rd to South Point |
Unrestricted |
100+ |
Q 4 2008 |
LPV-109.01 |
New Orleans East Levee - Intermedate Levee Raise - South Point to GIWW |
Unrestricted - Best Value |
100+ |
Q 4 2008 |
LPV-109.02a |
New Orleans East Levee - South Point - CSX RR (100YR) |
Unrestricted - Best Value |
20-50 |
Q 4 2009 |
LPV-109.02b |
I-10 Floodwall & Crossing |
Unrestricted - Best Value |
50-100 |
Q 3 2010 |
LPV-109.02c |
US 11 & US 90 Gates & Crossings |
Unrestricted - Best Value |
20-50 |
Q 2 2009 |
LPV-110 |
New Orleans East Levee - Modify CSX Railroad Gate |
SDV |
0-5 |
Q 4 2009 |
LPV-111.01 |
New Orleans East Back Levee - CSX RR to Michoud Canal |
Unrestricted - Best Value |
100+ |
Q 4 2009 |
LPV-111.02 |
Raise wall at Pump Station #15 |
Unrestricted - Best Value |
5-20 |
Q 1 2010 |
LPV - 113 |
Citrus Back Levee (Michoud Canal to Michoud Slip) to Auth. Elevation |
HZ -MATOC |
5-20 |
Q 4 2008 |
LPV-115 |
Citrus Back Levee - Michoud Slip to IHNC |
Hired Labor |
$1.10 |
12-21-06 |
LPV-116 |
Eastbank IHNC- GIWW/MRGO to Almonaster |
Hired Labor |
$1.50 |
12-30-06 |
LPV-201 |
IHNC GIWW to Almonaster |
Hired Labor |
$0.10 |
12-30-06 |
LPV-142 |
Interim Measure - South Side of GIWW |
|
$1.2 |
6-10-07 |
NOE-9 |
Michoud Slip to Michoud Canal, Floodwall Scour Repair |
|
$21.7 |
6-3-06 |
OEB-02 |
Lake Pontch-17th St. Canal Floodwall Repair, Phase 2 |
|
$15.2 |
2-3-06 |
OEB-04 |
Lake Pontch-London Ave. Canal Breach at Mirabeau, Ph2 |
|
$12.02 |
2-10-06 |
OEB-06 |
Lake Pontch- London Ave. Breach at Robert E. Lee, Ph2 |
|
$9.85 |
2-24-06 |
Project Code |
Contract |
Contracting
Package |
Contracting Estimates
(in millions) |
Contract Awards
(Quarters based on calendar year) |
LPV-00.1 |
Reach 1 Lakefront Levee - Phase 1 |
8(a) |
4.57 |
8/31/2006 |
LPV-00.2 |
Reach 1 Lakefront Levee - Phase 2 |
8(a) |
0-5 |
Q2 2009 |
LPV-01.1 |
Reach 2 Lakefront Levee Phase 1 |
8(a) |
0-5 |
Q 32008 |
LPV-02.1 |
Reach 3 Lakefront Levee - (3rd Lift) - Phase 1 |
8(a) MATOC |
5.52 |
10/6/2006 |
LPV-02.2 |
Reach 3 Lakefront Levee - Phase 2 |
8(a) MATOC |
0-5 |
Q-2-2009 |
LPV-03d.2 |
Airport Runway 10 Levee - Phase 1 |
Unrestricted |
0-5 |
Q 3 2009 |
LPV-03a.1 |
West Return Floodwall - Vintage - Phase 1 |
8(a) |
1.68 |
5/13/2006 |
LPV-03.2 |
West Return Floodwall - Vintage - Phase 2 |
Unrestricted |
100M+ |
Q 1 2010 |
LPV-03b.1 |
West Return Floodwall - Airport I-wall - Phase 1 |
8(a) |
0.59 |
9/16/2006 |
LPV-03c.1 |
West Return Floodwall - I- wall @ I-10 - Phase 1 |
HZ-MATOC |
0.09 |
4/24/2007 |
LPV-09.1 |
Pump Station #1 (Bonnabel) Floodwall Tie-ins -Phase 1 |
HZ-MATOC |
0.29 |
5/16/2007 |
LPV09.2 |
Pump Station #1 (Bonnabel) Modifications, Fronting Protection & Floodwall Tie-ins Phase 2 |
Unrestricted |
20-50 |
Q 2 2009 |
LPV-10.1 |
Pumping Station #2 (Suburban) Floodwall Tie-ins -Phase 1 |
8(a) MATOC |
1.19 |
9/22/2006 |
LPV-10.2 |
Pumping Station #2 (Suburban) Modifications, Fronting Protection, Positive Cut-off & Floodwall Tie-ins - Phase 2 |
Unrestricted |
20 50 |
Q 2 2009 |
LPV-11.1 |
Pumping Station #3 (Elmwood) Floodwall Tie-ins -Phase 1 |
8(a) |
1.39 |
9/22/2006 |
LPV-11.2 |
Pumping Station #3 (Elmwood) Modifications, Fronting Protection, Positive Cut-off & Floodwall Tie-ins - Phase 2 |
Unrestricted |
20-50 |
Q 2 2009 |
LPV-12.2 |
Pumping Station #4 (Duncan) Modifications, Fronting Protection, Positive Cut-off & Floodwall Tie-ins - Phase 2 |
HUBZONE |
20-50 |
Q 1 2009 |
LPV-13.1 |
Re-Curve I-Wall in Northwest Kenner - Phase 1 |
HUBZONE |
1.01 |
5/2/2007 |
LPV-13.2 |
Re-Curve I-Wall in Northwest Kenner - Phase 2 |
HUBZONE |
5-20 |
Q 3 2009 |
LPV-16.1 |
Floodwall and Gate at Bonnabel Launch - Phase 1 |
HUBZONE |
0-5 |
5/21/2007 |
LPV-16.2 |
Floodwall and Gate at Bonnabel Launch - Phase 2 |
HUBZONE |
0-5 |
Q 2 2009 |
LPV-17.2 |
Bridge abutment and floodwall tie-ins at Causeway Bridge - Phase 2 |
HUBZONE |
0-5 |
Q 1 2010 |
LPV-18.2 |
Floodwall and Gate at Williams Blvd. Boat Launch - Phase 2 |
HUBZONE |
0-5 |
Q 2 2009 |
LPV-09a2 |
Pump Station #1 Breakwater -Phase 1 |
Unrestricted |
0-5 |
Q 1 2009 |
LPV-19.2 |
Reach 4 Lakefront Levee - Phase 2 |
HUBZONE |
0-5 |
Q 2 2009 |
LPV-20.1 |
Reach 5 Lakefront Levee - Phase1 |
HUBZONE |
0-5 |
Q 4 2008 |
LPV-20.2 |
Reach 5 Lakefront Levee - Phase 2 |
HUBZONE |
5-20 |
Q 2 2009 |
Project Code
|
Contract
|
Contracting
Package
|
Contracting Estimates
(in millions)
|
Contract Awards
(Quarters based on calendar year) |
SELA-01
|
Soniat
Canal
- Veterans to
Canal #3 & gap below Veterans
|
Unrestricted
|
24.02 |
11/16/2006
|
SELA-01a
|
Soniat
Canal
- West
Napoleon to Lynette
|
Unrestricted
|
5-20
|
Q 2 2009
|
SELA-02
|
Westwego PS Diesel Engine
|
8(a) - MATOC
|
1.49 |
12/18/06
|
SELA-03
|
Westminster/Lincolnshire PS Backup Generators
|
8(a) - MATOC
|
8.85 |
12/29/06
|
SELA-04
|
Elmwood
Canal
Bridge
@ Kawanee
|
8(a) - MATOC
|
5.84 |
1/30/07 |
SELA-04a
|
Elmwood
Canal
Bridge
@ W. Esplanade
|
HZ - MATOC
|
13.08 |
2/26/2007 |
SELA-05
|
Grand
Cross
Canal
@ Lapalco
|
HZ - MATOC
|
8.66 |
6/18/2007 |
SELA-06
|
Gardere
Canal
- Phase II
|
Unrestricted
|
31.35 |
1/12/2007
|
SELA-07
|
Pump to River Disc. Tubes (
Hickory Avenue
Section)
|
SDV
|
8.45 |
8/14/2007 |
SELA-07A |
Pump to River Remaining Discharge Tubes |
|
50-100M |
Q 3 2009 |
SELA-8 |
Soniat Canal - West Metairie to Lynette |
|
20-50M |
Q 2 2009 |
SELA-9 |
Pump to the River PS and Intake Structure |
|
50-100M |
Q 2 2010 |
SELA 10 |
Mayronne Canal |
|
5-20M |
Q 2 2010 |
SELA-11
|
Cousins
Canal
- Phase II
|
8(a) - MATOC
|
9.00 |
9/27/2007 |
SELA 12 |
Two Mile Canal Phase 2 |
|
20-50M |
Q 2 2009 |
SELA 13 |
Justice and Oil Company Canals |
|
5-20M |
Q 4 2009 |
SELA 14 |
Industry Canal |
|
20-50M |
Q 4 2011 |
SELA 15 |
Trapp Canal |
|
20-50M |
Q 2 2011 |
SELA 16 |
Bardere Canal - Phase III (Murphy Canal) |
|
20-50M |
Q 3 2010 |
SELA-OG-1
|
Soniat
Canal
- West
Napoleon to Veterans
|
|
20-50 |
7/25/2000 |
SELA-OG-2
|
Two Mile Canal Phase I
|
|
5-20 |
10/23/2003 |
SELA-OG-5
|
Whitney/Barataria Pump Station
|
|
5-20 |
12/15/1999 |
SELA-OG-6
|
Suburban Pump Station
|
|
5-20 |
12/14/1999 |
SELA-OG-7
|
Elmwood Pump Station
|
|
5.20 |
11/19/1999 |
Project Code
|
Contract
|
Contracting
Package
|
Contracting Estimates
(in millions)
|
Contract Awards
(Quarters based on calendar year) |
SELA-18
|
Dryer Road PS intake Culvert
|
Unrestricted
|
20-50
|
Q 3 2008 |
SELA-19
|
Florida
Avenue
- Phase 1
|
Unrestricted
|
20-50
|
Q 4 2008
|
SELA-20
|
Florida
Avenue
- Phase 2
|
Unrestricted
|
50-100
|
Q 4 2008 |
SELA-21 |
Uptown Jeff Avenue - Phase 1 - Claiborne to Dryades |
|
0-5 |
Q 3 2010 |
SELA-22 |
Uptown Jeff Avenue - Phase 1 - Dryades to Constance |
|
0-5 |
Q 4 2010 |
SELA-23 |
Uptown Naploleon Avenue - Phase 1 - Constance to Carondelet |
|
0-5 |
Q 1 2009 |
SELA 23a |
Uptown Naploleon Avenue - Phase 1 - Montecelle to Leonidas |
|
0-5 |
Q 4 2009 |
SELA 23b |
Uptown Naploleon Avenue - Phase 1 - Leonidas to Lowerline |
|
0-5 |
Q 1 2010 |
SELA-25
|
Florida
Avenue
- Phase 3
|
Unrestricted
|
20-50
|
Q 4 2009 |
SELA-OG-3
|
Dwyer Road
- PS
Improvements
|
|
20-50 |
9 21 2000 |
SELA-OG-4
|
Pritchard
Place
Pump Station
|
|
5-20 |
4 19 2001 |
Project Code
|
Contract
|
Contracting
Package
|
Contracting Estimates
(in millions)
|
Contract Awards
(Quarters based on calendar year)
|
WBV-15a.1
|
Lake
Cataouatche PS
to Segnette State Park-Phase 1
|
Unrestricted
|
$44.72 |
7/27/2007 |
WBV-15a.2
|
Lake
Cataouatche PS
to Segnette State Park-Phase 2
|
Unrestricted
|
5-20
|
Q-3-2009 |
WBV-15b.1
|
Lake
Cataouatche
PS Fronting
Protection, Modifications
|
HUBZONE
|
4.86 |
8/31/2007 |
WBV-15b.2
|
Lake
Cataouatche
PS Fronting
Protection, Modifications
|
HUBZONE
|
20-50 |
Q-2-2009 |
WBV-17a.1
|
Western Tie-In - Phase 1
|
Unrestricted
|
20-50
|
Q-3-2009 |
WBV-17a.2
|
Western Tie-In - Phase 2
|
Unrestricted
|
5-20 |
Q-3-2009
|
WBV-17b.1
|
Station 160+00 to Hwy 90- Phase 1
|
HUBZONE
|
14.62 |
03-19-2008 |
WBV-17b.2 |
Station 160+00 to Hwy 90- Phase 2
|
HUBZONE
|
0-5
|
Q-1-2009 |
WBV-18.1
|
Hwy 90 to
Lake
Cataouatche PS - Phase 1
|
Unrestricted
|
16.85 |
10/24/2006
|
WBV-18.2
|
Hwy 90 to
Lake
Cataouatche PS - Phase 2
|
Unrestricted
|
5-20
|
Q-2-2009 |
WBV-16.1
|
Segnette PS to New Westwego PS Floodwall - Phase 1
|
HUBZONE
|
19.00 |
5/23/2007
|
WBV-16.2
|
Segnette PS to
Company
Canal
Floodwall
|
SDV
|
20-50 |
Q 4-2009 |
WBV-16b
|
Segnette PS Fronting Protection & Modifications
|
Unrestricted
|
20-50
|
Q 2 2009 |
WBV-19
|
Company
Canal
Floodwall
|
Unrestricted
|
20-50
|
|
WBV-24
|
Segnette
State Park
Floodwall
|
HUBZONE
|
100+
|
Q-1-2010
|
WBV-53
|
Priority Interim-Contract 2
|
Hired Labor
|
0.63 |
9/19/2006
|
WBV-71 |
Western Tie-In Levee (North-South) |
Unrestricted |
0-5 M |
Q 4 2009 |
WBV-72 |
Western Tie-In Levee (East-West) |
Unrestricted |
20-20M |
Q 2 2010 |
WBV-73 |
Western Tie-In Hwy Crossing |
Unrestricted |
5-20M |
Q 4 2009 |
WBV-74 |
Western Tie-In Gated Closure |
Unrestricted |
5-20M |
Q 1 2010 |
WBV-75 |
Western Tie-In RR Crossing |
Unrestricted |
0-5M |
Q 1 2010 |
WBV-01
|
Contract 1, Sectorgate to
Boomtown Floodwall
|
Unrestricted
|
132.13 |
02/01/2008 |
WBV-02a
|
Contract 2a, Boomtown Floodwalls
|
Unrestricted
|
5-20 |
Q 3 2008 |
WBV-02b
|
Contract 2b, Boomtown to Hero PS Floodwalls
|
Unrestricted
|
56.10 |
3/26/2007 |
WBV-03a
|
Contract 3a, Hero PS to
Algiers
Canal
Floodwall
|
Unrestricted
|
62.28 |
07/14/2008 |
WBV-03b
|
Contract 3b, Hero PS to
Algiers
Canal
Floodwall
|
Unrestricted
|
5-20 |
Q 4 2008 |
WBV-04.2
|
Belle
Chasse
Hwy
to Hero Cutoff-Reach1-Phase 2
|
HUBZONE
|
0-5
|
Q 2 2009
|
WBV-05.2
|
Belle
Chasse
Hwy
to Hero Cutoff-Reach 2 - Phase 2
|
HUBZONE
|
5-20
|
Q 2 2009
|
WBV-06.2
|
Belle
Chasse
Hwy
to Hero Cutoff-Reach 3 & 4 - Phase
2
|
HZ-MATOC
|
20-50 |
Q 2 2009
|
WBV-06a.1
|
Belle
Chasse
Hwy
to Hero Cutoff (West) |
HZ-MATOC
|
9.62 |
01-04-2008 |
WBV-06a.2
|
Belle
Chasse
Hwy
to Hero Cutoff (West) - Phase
2
|
|
50-100 |
Q 1-2011 |
WBV-07
|
Planters PS Fronting Protection and Modifications
|
HZ-MATOC
|
20-50 |
Q 2 2008
|
WBV-08
|
S&WB PS #13 Fronting Protection and Modifications
|
HZ-MATOC
|
20-50
|
Q 4 2008
|
WBV-38.1
|
Cousins PS- Phase 1
|
Unrestricted
|
18.78
|
9/16/2006
|
WBV-38.2
|
Cousins PS- Phase 2
|
Unrestricted
|
20-50
|
Q 2-2009 |
WBV-46.1
|
Sector gate Complex - Phase 1
|
Unrestricted
|
35.69
|
12/16/2003
|
WBV-46.2
|
Sector gate complex- Phase 2
|
Unrestricted
|
5-20 |
Q 2-2009 |
WBV-47.1
|
Algiers
Lock to
Belle Chasse Hwy
(West)- Phase 1
|
Unrestricted
|
5-20 |
Q 2 2009 |
WBV-47.2 |
Algiers
Lock to
Belle Chasse Hwy
(West)- Phase 1
|
Unrestricted
|
20-50 |
Q 3 2010 |
WBV-39b.1
|
Cousins Discharge Channel Floodwalls - Phase 1
|
Hired Labor
|
1.05 |
6/17/2007 |
WBV-39b.2
|
Cousins Discharge Channel Floodwalls - Phase 2
|
Unrestricted
|
5-20 |
Q 4 2009
|
WBV-44
|
Whitney Barataria PS Fronting
Protection and Modifications
|
Unrestricted
|
20-50 |
Q1 2009
|
WBV-52
|
Priority Interim-Contract 1
|
Hired Labor
|
0.20 |
9/19/2006 |
WBV-59 |
'07 Priority Interim-Contract 2 Estelle PS to Lapalco |
HUBZONE |
3.17 |
7-13-2007 |
WBV-60 |
'07 Priority Interim-Contract 3 Westego Floodwall |
8(a) |
8.12 |
12 07 2007 |
WBV-61 |
'07 Priority Interim-Contract 4 Segnette Park Floodwall |
8(a) |
7.70 |
11 20 2007 |
WBV-62 |
Priority Interim-Contract 5 Old and New Estelle PS andPS #13 |
8(a) - MATOC |
2.69 |
04 27 2007 |
WBV-63a |
'07 Priority Interim-Contract 6 Misc WB Pump Station and Utility Crossing |
8(a) - MATOC |
0.99 |
04 26 2007 |
WBV-63b |
'07 Priority Interim-Contract 7 Misc WB Pump Station and Utility Crossing |
8(a) - MATOC |
0.67 |
06 21 2007 |
WBV-63b.1 |
'07 Priority Interim-Contract 7b Misc WB Pump Station and Utility Crossing |
8(a) |
3.5 |
07 03 2007 |
WBV-63c |
'07 Priority Interim-Contract 8 Misc WB Pump Station and Utility Crossing |
8(a) - MATOC |
4.35 |
05 23 2007 |
Project Code
|
Contract
|
Contracting
Package
|
Contracting Estimates
(in millions)
|
Contract Awards
(Quarters based on calendar year) |
WBV-09a
|
Hero
Canal
to
Oakville
-Levees |
HZ-MATOC
|
5-20 |
Q1 2010 |
WBV-09b |
Hero
Canal
to
Oakville
- Structures
|
HZ-MATOC
|
0-5 |
Q 4 2009 |
WBV-10
|
Belle Chasse PS #1 (Plaquemines PS) Fronting Protection
and Modifications-Phase 1
|
Unrestricted
|
20-50
|
Q 4 2008 |
WBV-11
|
Belle Chasse PS #2 Fronting Protection and Modifications
|
Unrestricted
|
5-20 |
Q 4 2008 |
WBV-12
|
Hero
Canal
Reach 1, 2nd Enlgt
|
Unrestricted
|
50-100 |
Q 1 2010 |
WBV-13
|
S&WB PS #11Fronting Protection and Modifications
|
HZ-MATOC
|
20-50
|
Q 2 2008
|
WBV-48.1
|
Belle
Chasse
Hwy
to
Algiers
Lock (East) - Phase 1
|
Unrestricted
|
4.99
|
8/8/2005
|
WBV-48.2
|
Belle
Chasse
Hwy
to
Algiers
Lock (East) - Phase 2
|
Unrestricted
|
20-50 |
Q 1 2010 |
WBV-49.1
|
Hero Levee to
Belle
Chasse Hwy
(East)- Phase 1 |
Unrestricted
|
0-5 |
Q 1 2009
|
WBV-49.2
|
Hero Levee to
Belle
Chasse Hwy
(East)- Phase 2
|
Unrestricted
|
50-100
|
Q 2 2011 |
Project Code
|
Contract
|
Contracting
Package
|
Contracting Estimates
(in millions)
|
Contract Awards
(Quarters based on calendar year) |
WBV-14a.1
|
Harvey Canal West Bank Levee,
Phase 1
|
HZ-MATOC |
1.77 |
04/15/2008 |
WBV-14a.2
|
Harvey Canal West Bank Levee,
Phase 2 |
HZ-MATOC
|
5-20
|
Q 1 2010
|
WBV-14b.1
|
Orleans
Village
to Hwy 45,
Levee-Phase 1
|
HZ-MATOC
|
3.00 |
8/28/2007 |
WBV-14b.2
|
Orleans
Village
to Hwy 45
Levee- Phase 2
|
HZ-MATOC
|
5-20
|
Q 2 2009
|
WBV-14c.1
|
New Westwego PS to
Orleans
Village
,
3rd Enlgt-Phase 1H
|
HZ-MATOC
|
8.98 |
03/14/2008
|
WBV-14c.2
|
New Westwego PS to
Orleans
Village- Phase 2
|
HZ-MATOC
|
5-20
|
Q 2 2009
|
WBV-14e.1
|
V-line Levee, east of Vertex- Phase 1
|
HZ-MATOC
|
8.01 |
06/06/2008 |
WBV-14e.2
|
V-line levee, east of vertex- Phase 2
|
HZ-MATOC
|
20-50 |
Q 3 2009 |
WBV-14f.2
|
Hwy 45 levee- Phase 2
|
HZ-MATOC
|
0-5
|
Q 1 2009 |
WBV-14d
|
V-line Floodwall
|
HUBZONE
|
50-100
|
Q 1 2009 |
WBV-14g2
|
Estelle PS Vicinity Floodwalls
|
|
50-100 |
Q 2 2009 |
WBV-19 |
Company Canal Floodwall |
Unrestricted
|
20-50M |
Q |
WBV-20
|
New Westwego PS fronting Protection and Modifications
|
Unrestricted
|
5-20 |
Q 1 2009 |
WBV-21
|
Old Westwego PS Fronting Protection and Modifications
|
Unrestricted
|
0-5 |
Q 2 2009
|
WBV-22
|
Westwego Floodwall
|
Unrestricted
|
20-50
|
Q 3 -2009 |
WBV-23
|
New Estelle PS Fronting Protection and Modifications
|
HUBZONE
|
5-20
|
Q 1 2009
|
WBV-30
|
Westminster
PS Fronting
Protection and Modifications
|
Unrestricted
|
5-20
|
Q 1 2009 |
WBV-33
|
Old Estelle PS Fronting Protection and Modifications
|
HUBZONE
|
20-50 |
Q 1 2009 |
WBV-37
|
Ames PS fronting Protection and Modifications
|
8(a)
|
20-50
|
Q 2 2009 |
WBV-43
|
Mt. Kennedy PS fronting protection and Modifications
|
8(a)
|
5-20
|
Q 1 2009 |
WBV-54
|
Priority Interim- Contract 3
|
Hired Labor
|
0.10 |
9/19/2006
|
WBV-55
|
Priority Interim- Contract 4
|
Hired Labor
|
0.60 |
9/19/2006
|
WBV-56
|
Priority Interim-Contract 5
|
Hired Labor
|
0.20 |
9/19/2006
|
St. Bernard Parish
Project Code |
Contract |
Contracting
Package |
Contracting Estimates
(in millions) |
Contract Awards
(Quarters based on calendar year) |
LPV-142 |
Interim Measure - South Side of GIWW |
|
0-5 |
06-10-2007 |
|
Chalmette Loop Levee - Bayou Bienvenue and Bayou Dupre |
Unrestricted
|
20-50 |
Q 2 2009 |
LPV-145 |
Chalmette Loop Levee - Bayou Bienvenue to Bayou Dupre |
HUBZONE |
100+ |
Q 3 2009 |
LPV-146 |
Chalmette Loop Levee - Bayou Dupre to Hwy 46 |
HUBZONE |
100+ |
Q 2 2009 |
LPV 147 |
Chalmette Loop Levee - Bayou Road Floodgate and Hwy 46 ramp |
Unrestricted - Best Value |
20 - 50 |
Q 4 2009 |
LPV-148.01 |
Chalmette Loop Levee - Hwy 46 to River (Verret to Caernarvon) |
Unrestricted - Best Value |
41.82 |
10-31-2007 |
LPV 148.02 |
Chalmette Loop Levee - Hwy 46 to River (Verret to Caernarvon) |
Unrestricted - Best Value |
20 - 50 |
Q 2 2009 |
LPV 149 |
Chalmette Loop Levee -(Verret to Caernarvon Structures |
Unrestricted - Best Value |
5-20 |
Q 2 2010 |
NF-01 |
Grand Isle Non Federal |
8(a) |
0-5 |
Q 03 2009 |
GI-01 |
Grand Isle Federal Levee |
HUBZONE |
12.50 |
04/08/2008 |
Project Code |
Contract |
Contracting
Package |
Contracting Estimates
(in millions) |
Contract Awards
(Quarters based on calendar year) |
NOV - 01 |
Reach C Hurricane Protection - Phoenix to Davant |
Unrestricted |
20-50 |
Q 1 2010 |
NOV - 02 |
Reach C Hurricane Protection - Davant to Bohemia |
Small Business |
20-50 |
Q 4 2009 |
NOV - 05 |
West Bank - St. Jude - City Price Upper Reach A |
Small Business |
5-20 |
Q 1 2010 |
NOV - 06 |
West Bank - Reach A (City Price to Empire) |
8(a) |
5-20 |
Q 1 2010 |
NOV - 07 |
West Bank - Reach B-1 (Empire to Ft Jackson) |
HUBZONE |
20-50 |
Q 1 2010 |
NOV - 08 |
West Bank - Reach B-2 (Ft. Jackson to Venice) |
8(a) |
5-20 |
Q 1 2010 |
NOV - 09 |
West Bank MRL |
8(a) |
5-20 |
Q 1 2010 |
NOV -10 |
West Bank MRL - St Jude to Port Sulphur |
Small Business |
5-20 |
Q 1 2010 |
NOV -11 |
West Bank MRL - Port Sulphur to Fort Jackson Sta 285 to 357 Buras to Fort Jackson |
Unrestricted - Best Value |
5-20 |
Q 3 2010 |
NOV - 12 |
West Bank MRL - Fort Jackson to Venice |
Unrestricted - Best Value |
0-5 |
Q 1 2010 |
NOV - 13 |
West Bank - Empire Floodgate |
Unrestricted - Best Value |
0-5 |
Q 1 2010 |
NOV - 14 |
West Bank - Empire Lock |
Unrestricted - Best Value |
0-5 |
Q 1 2010 |
NOV - 15 |
West Bank - Floodwall Repairs Duvic P/S, Grand Laird P/S, Pt Michel, Childress |
HUBZONE |
5-20 |
Q 1 2010 |
NOV -15.01 |
Interim Measures at Duvic and Grand Liard Pump Stations |
Hired Labor
|
4.00 |
08-08-07 |
NF-02 |
Braithwaite to Scarsdale Non Federal |
HUBZONE |
16 |
15 Jun 06 |
NOV-NF-W-04 |
Oakville to LaReusitte |
Small Bussiness |
50-100 |
Q 1 2010 |
NOV-NF-W-05 |
LaReusitte to Myrtle Grove |
Unrestricted - |
100+ |
Q 1 2010 |
NOV-NF-W-06 |
Myrtle Grove to St.Jude |
8(a) |
100+ |
Q 1 2010 |
|
St. Charles Parish
Project Code |
Contract |
Contracting
Package |
Contracting Estimates
(in millions) |
Contract Awards
(Quarters based on
calendar year) |
LPV-04.1 |
Levee - Reach 1A, 1B & 2A- Phase 1 |
HZ - MATOC |
12.93 |
6/28/2007 |
LPV-04.2 |
Levee - Reach 1A, 1B & 2A- Phase 2 |
Unrestricted |
20-50 |
Q3 2009 |
LPV-05.1 |
Levee - Reach 2B (2nd Lift)- Phase 1 |
8(a) - MATOC |
4.66 |
9/14/2006 |
LPV-05.2 |
Levee - Reach 2B- Phase 2 |
HUBZONE |
20-50 |
Q 3 2009 |
LPV-06.1 |
Floodwall Tie-ins- & Bayou Trepagnier Drainage Structure – Phase 1 |
8(a) - MATOC |
0.98 |
3/3/2007 |
LPV-06a.2 |
Bonnet Carre Floodwall - Phase 2 |
Unrestricted |
0-5 |
Q 3 2009 |
LPV-06b.2 |
Shell Pipeline Floodwall - Phase 2 |
Unrestricted |
0-5 |
Q3 2009 |
LPV-06c.2 |
Goodhope Floodwall - Phase 2 |
Unrestricted |
5-20 |
Q 3 2009 |
LPV-06d.2 |
Koch - Gateway Floodwall - Phase 2 |
Unrestricted |
0-5 |
Q 3 2009 |
LPV-06e.1 |
Floodwall Under I-310 - Phase 1 |
Unrestricted |
0.47 |
4/2720/07 |
LPV-06e.2 |
Floodwall Under I-310 - Phase 2 |
Unrestricted |
5-20 |
Q3 2009 |
LPV-06f.2 |
Canadian National Railroad Gate - Phase 2 |
Unrestricted |
5-20 |
Q 3 2009 |
LPV-07.1 |
St. Charles Drainage Structure Tie-In – Phase I |
8(a) - MATOC |
0.85 |
9-26-2007 |
LPV-07b.2 |
Cross Bayou Drainage Structure - Phase 2 |
Unrestricted |
5-20 |
Q4 2009 |
LPV-07c.2 |
St. Rose Drainage Structure - Phase 2 |
Unrestricted |
5-20 |
Q 1 2009 |
LPV-07d.2 |
Almeidia Drainage Structure - Phase 2 |
Unrestricted |
0-5 |
Q1 2009 |
LPV-07e.2 |
Walker Drainage Structure - Phase 2 |
Unrestricted |
0-5 |
Q1 2009 |
Project Code |
Contract |
Contracting
Package |
Contracting Estimates
(in millions) |
Contract Awards
(Quarters based on calendar year) |
|
Roofing Repairs |
8(a) |
1.9 |
22-Aug-06 |
OPS-02 |
Motor Rewinds P.S. 2,3,5 & 7 |
Service |
4.07 |
15-May-06 |
OPS-03 |
Motors Rewinds P.S. 1 & 6 |
Service |
3.3 |
15-May-06 |
OPS-05 |
Horizontal Pump Bearings |
Supply |
1.11 |
01 Dec 06 |
OPS-06a |
Bearings - PS 1, 14, 15, 16, I-10 |
Service |
3.22 |
1-Dec-06 |
OPS-06b |
OPS-06b Bearings - PS 4, 6, 10, 12, 19 |
Service |
2.96 |
1-Dec-06 |
OPS-07a |
Frequency Changers Carrollton Building |
Service |
3.42 |
22-Nov-06 |
OPS-07b |
OPS-07b - Frequency Changers Station 17 (D) |
Service |
3.34 |
22-Nov-06 |
OPS-08 |
Electrical-Mechanical Repairs |
8(a) |
3.25 |
19 Jun-07 |
OPS-09 |
Building and Structural Repairs |
HUBZONE |
1.55 |
12 Oct 07 |
OPS-10 |
Discharge Line |
SDV |
1.85 |
1 Aug 07 |
OPS-11 |
Elaine Pump Station Repair |
8(a) |
0-5 |
Q 3 2008 |
JPS-01 |
Roofing Repairs Bonnabel |
Smplfd. Constr. |
0.1 |
10 May 06 |
JPS-02 |
Roofing Repairs Duncan |
Smplfd. Constr. |
0.1 |
11 -May 06 |
JPS-03a |
Roofing Siding Repairs |
8(a) |
0.1 |
17 Jul 06 |
JPS-03b |
Roofing Siding Repairs |
8(a) |
0.1 |
17 Jul 06 |
JPS-03c |
Roofing Siding Repairs |
8(a) |
0.1 |
17 Jul 06 |
JPS-04 |
Misc Repairs # 1 |
8(a)
|
0.1 |
8-Nov-06 |
JPS-05 |
Misc Repairs # 2 |
8(a) |
0.1 |
30-Oct-06 |
JPS-06 |
Misc Repairs # 3 |
8(a) |
0.1 |
2-Nov-06 |
SBPS-01 |
Design Build Contract Rebuild 2,3,and 5 |
Design Build |
17.90 |
17-May-07 |
SBPS-02 |
Electric/Mechanical and Misc Repairs |
8(a) |
0.79 |
25 Jan 07 |
SBPS-03 |
Generators for PS#1 and 4 |
8(a) |
0.1 |
27 Jul 06 |
SBPS-04 |
Gate Package |
8(a) |
0.5 |
28 Sep 06 |
SBPS-05 |
Roofing Repairs |
Smplfd. Constr. |
0.1 |
14 Apr 06 |
PPS-01a |
Hayes, Esplalh, Bellevue, Scarsdale |
Unrestricted |
5-20 |
19 Jun 08 |
PPS-01b |
Gainard Woods 1+2, Sunrise 1+2, Triumph |
8(a) |
0-5 |
Q 3 2008 |
PPS-01c |
Diamond and Wpalh |
8(a) |
0-5 |
Q 4 2008 |
PPS-01d |
Belle Chasse 1+2, Ollie, Grand Deliard, Dvvic |
8(a) |
0-5 |
Q 4 2008 |
PPS-02 |
Electric Services |
8(a) |
0.70 |
25 Aug 06 |
Project Code |
Contract |
Contracting
Package |
Contracting Estimates
(in millions) |
Contract Awards
(Quarters based on calendar year) |
|
Lake Pontchartrain-Interim Closure Structure at 17th Street Canal |
U
|
62.57 |
27-Jan-06 |
OEB 10 |
Lake Pontchartrain-Interim Closure Structure at London Ave Canal |
U |
40.31 |
27-Jan-06 |
OEB 11 |
Lake Pontchartrain-Interim Closure Structure at Orleans Ave Canal |
U |
47.70 |
3-Feb-06 |
OEB 12 |
Temporary Pump Supply 07 - 17th St. Canal |
Supply |
20-50 |
22-Dec-06 |
OEB 13 |
Temporary Pump Supply 07 - London Ave Canal |
Supply |
5-20 |
22-Dec-06 |
OEB 14 |
Temporary Pump Installation 07 - 17th St. Canal |
Design Build |
5-20 |
31-Jan-06 |
OEB 15 |
Temporary Pump Installation 07 - London Ave Canal |
Design Build |
20-50 |
31-Jan-06 |
SCADA-01 |
SCADA system for 17th, London and Orleans Avenue Canals |
Design Build |
5.43 |
19-Apr-06 |