Home | About CDC | Press Room | A-Z Index | Contact Us
CDC Centers for Disease Control and Prevention Home Page
CDC en Español
 

Cruise Ship Inspection Details

  Basic Search |  Advanced Search |  Ship Scored 100 |  Green Sheet
 
Cruise Ship: Sapphire Princess Cruise line: Princess Cruises Inspection Date: 05/18/2005 Score: 97
 
This cruise ship inspection report lists the deficiencies found during the inspection. Additional information corresponding to each item number is available in the lastest editions of the CDC VSP Operational Manual.



 
Cruise Ship's Corrective Action Statement  |  View/Print Summary Report  |  View/Print Detail Report
 
 
Note: Click on the Item no. to view the item detail.
 
Item No.DescriptionPoints Deducted
08PW filling hoses, caps, connections, procedures; Sample records, valves; PW system constructed, maintained0
19Food protected storage, preparation, display, service, transportation; Original containers, labeling; Food handling minimized; In-use food dispensing, preparation utensils stored0
20PHF temperature maintenance facilities; Food-contact surfaces designed, constructed, installed, maintained; TMD=s provided, located, calibrated0
24Sanitizing rinse temperature, concentration, time3
26Food-contact surfaces equipment / utensils clean; Safe0
30Hand cleanser, sanitary towels, waste receptacles, handwash signs; maintenance0
33Decks / bulkheads / deckheads construction, repair, clean0
Selected Item Details
Item No.: 08
Site: Potable Water-AFT STARBOARD BUNKER STATION
Violation: THE DISTILLATE TRANSFER LINE, USED TO TRANSFER DISTILLATE FROM THE VESSEL TO SHORE WAS PAINTED BLUE SIMILAR TO THE POTABLE WATER FILLING LINE. THE DISTILLATE TRANSFER LINE IN THE AFT PORTSIDE BUNKER STATION WAS PAINTED A BLUE AND WHITE COLOR AND STRIPED BLUE AND YELLOW DIFFERENTIATING IT FROM THE POTABLE WATER LINES. THE HOSE FITTING WAS DIFFERENT FROM THE POTABLE WATER FILLING LINE CONNECTIONS DECREASING THE POTENTIAL FOR CONNECTION MISTAKES.
Recommendation:Paint the distillate transfer line a different color than the potable water filling lines.
Site: Potable Water-GARBAGE SORTING ROOM AND INCINERATOR ROOM
Violation: HOSES WITH SHUT-OFF VALVES WERE CONNECTED TO THE HOSE CONNECTIONS ON THE HANDWASHING STATIONS. ATMOSPHERIC VACUUM BREAKERS WERE PROVIDED AS THE BACKFLOW PREVENTERS.
Recommendation:Install continuous pressure type backflow prevention devices.
*Inspections scores of 85 or lower are NOT satisfactory
Safer, Healthier People
Centers for Disease Control and Prevention, 1600 Clifton Rd, Atlanta, GA 30333, U.S.A
Tel: (404) 639-3311 / Public Inquiries: (404) 639-3534 / (800) 311-3435
FirstGov
DHHS
Department of Health
and Human Services