skip navigation
Text Size small medium large  

skip navigation
Energy Supply & Demand
Electric
Hydropower
Annual Charges
Safety and Inspections
Environment
Environmental Impact Statements (EISs)
Initial Consultation Contact List
Third-Party Contractors
Industry Activities
General Information
Gas
Liquefied Natural Gas (LNG)
Oil
 
 


Industries

Hydropower - Environmental Impact Statements (EISs)
    Draft Environmental Impact Statement (DEIS) evaluates four hydroelectric projects on Lewis River in Washington State (P-2071-000 et al.)
    Issued: September 26, 2005

    The DEIS addresses the impacts of the Swift No. 1, Swift No. 2, Yale and Merwin hydroelectric projects located on the North Fork Lewis River in Cowlitz, Clark, and Skamania counties, Washington. PacifiCorp (Swift No. 1, Yale, and Merwin) and Cowlitz PUD (Swift No. 2) are the applicants for re-license.

    Some staff recommended measures include upstream and downstream fish passage facilities, minimum instream flows, aquatic and terrestrial habitat enhancement, fish hatcheries and recreation improvements.

    Staff concludes that the relicensing of the Swift No. 1, Swift No. 2, Yale and Merwin projects as proposed with staff modification would be best adapted to a comprehensive plan for the proper use, conservation, and development of the Lewis River.


    Comments on this DEIS can be eFiled. Comments need to be filed by November 23, 2005.




Updated: March 01, 2006