National Weather Service |
Knowledge of and ability to utilize existing support, logistic and equipment outage reporting entities, in order to maintain equipment operability and availability.
To be defined
1. Knowledge of the use of the EMRS system.
2. Knowledge of the use of the CLS system.
3. Ability to track and acquire/replenish existing initial issue system spares and replacement parts.
4. Knowledge of the role of the NLSC and NRC in the LRU replacement and repair process.
5. Knowledge of the OSF and NRC role in the support of the maintenance and operability of the NWR 2000 and all related components.
Instructional Component 12.1: To be determined
To be defined
Return to NOAA Weather Radio PDS page