National Weather Service
Professional Development Series
Professional Competency Unit


ASOS (PACE) Maintenance

PCU 8: Logistics

Producer: to be named


Description of Job Duty Competency to be Achieved

Knowledge of, and ability to utilize existing support, logistics and equipment outage reporting entities, in order to maintain operability and availability.


Description of Need

Description needed.


Specific Job Task Skills and Knowledge

1. Knowledge of the use of the EMRS system

2. Knowledge of the use of the CLS system

3. Ability to track and acquire/replenish existing initial issue system spares and replacement parts

4. Knowledge of the role of the NLSC and NRC in the LRU replacement and repair process

5. Knowledge of the AOMC and NRC role in the support of the maintenance and operability of the ASOS and all related components


Instructional Components

Instructional Component 8.1: To be defined.


Proposed Evaluation

Evaluation 8.1: To be determined.


Return to ASOS (PACE) Maintenance PDS page


Last reviewed or updated on 6/20/00