National Weather Service logo

National Weather Service
Professional Development Series


On-Station Systems and Operations for the CWSU

decorative red line

Executive Producer: Dale Branch or Tom Amis

Description needed.


Professional Competency Units

This Professional Development Series (PDS) includes the Professional Competency Units (PCU) listed below. Click on a unit to see details. However, PCU details have not as yet been developed for this PDS.

  • PCU 1: Using WARP
  • PCU 2: Using the CWSU AWIPS (NWSTC)
  • PCU 3: Implement Local Backup Procedures
  • PCU 4: Using the INTERNET
  • PCU 5: Using ITWS (Integrated Terminal Weather System)
  • PCU 6: Using AIS (Aeronautical Information System...by contractor)
  • Based on 11/05/99 version of this PDS


    Return to the Master NWS PDS Page

    Last reviewed or updated on 6/16/00