|
Date: 6/1/2007Location: MDInterstate Renewable Energy Council, Small Wind Energy Newsletter, June 2007. Maryland has become the fourth U.S. state to raise its net-metering limit to two megawatts for renewable-energy generators. In addition, Senate Bill 595 requires the Public Service Commission to form a small generator interconnection working group to develop interconnection standards and procedures that are "consistent with nationally adopted interconnection standards and procedures," and to revise the state's interconnection standards and procedures on or before November 1, 2007.
|