Western's banner shows transmission lines.
Link to Western's home page
Transmission OASIS Functions OATT Revisions Interconnection Infrastructure projects

Eastern Plains Transmission Project

Scoping meeting documents and materials—August and September 2006

Western hosted a series of 10 public scoping meetings on the Eastern Plains Transmission Project in August and September 2006.  Meetings were held Aug. 28 in Brush; Aug. 29 in Wray; Aug. 30 in Limon; Aug. 31 in Aurora; Sept. 5 in Fountain; Sept. 6 in Pueblo and Sept. 11 in Burlington, Colo.; and Sept. 12 in Sharon Springs, Kan.; Sept. 13 in Lamar, Colo. and Sept. 14 in Lakin, Kan.

These materials were available at the February public meetings, either as handouts or as display boards.

Acquisition of land rights display board (pdf 2.4 MB)

DOE, NEPA, and You: A Guide to Public Participation (pdf 3.8 MB)

Electric and magnetic fields brochure (pdf 221 kb)

Engineering display board (pdf 193 kb)

Engineering fact sheet (pdf 252 kb)

Environment display board (pdf 588 kb)

Preliminary alternative corridor map display board (pdf 5.8 MB)

Project overview display board (pdf 865 kb)

Project overview fact sheet (pdf 814 kb)

Scoping comment form (pdf 58 kb)

Scoping Summary Report (pdf 1.6 MB)

Scoping Summary Report - Appendix A (Pre-scoping and scoping materials) (pdf 1.1 MB)

Scoping Summary Report - Appendix B (Stakeholder list) (pdf 2.6 MB)

Scoping Summary Report - Appendix C (Consolidated scoping comments) (pdf 732 kb)

Siting and enviroment fact sheet (pdf 993 kb)

Siting and NEPA display board (pdf 400 kb)