|
CEII |
Public |
» May Be CEII «
Carefully Assess Content to Determine |
Inspections |
|
|
Inspection - response to FERC followup letter |
DAM Safety |
Design Report |
|
|
Engineering Analysis |
Exemption from P12d Request Letter |
|
Engineering Evaluation |
|
|
Part 12.10(a) Incident Report |
|
|
Part12D Consultant Inspection Report |
|
|
Board of Consultants Report |
|
|
Instrumentation Report |
|
|
|
|
|
PFMA |
|
|
Supporting Technical Information |
|
|
Part 12D Consultant Resume for Approval |
|
|
Emergency Action Plans |
Annual EAP Update |
|
Licensee response to Exercise followup letter |
5-Year EAP Submittal |
Annual review of conditions for EAP exemption |
|
EAP Submittal |
|
|
|
Exemption from EAP Request Letter |
|
EAP Func. Exercise Critique Report |
|
|
Hazard Classification |
|
|
Hazard Reclassification Request |
EAP Dambreak Report |
|
|
Construction |
Design Report |
|
|
Plans and Specifications |
|
Monthly Construction Progress Report |
Cofferdam Report |
Construction QCIP |
|
As-Built Drawings |
Decommissioning Study/Report |
|
Foundation Report |
|
|
Blasting Plan |
|
|
Public Safety |
|
Part 12.10(b) Incident Report |
|
|
Public Safety Plan |
|
Other |
|
Extension of Time Request |
|
|
Plan and Schedule |
|