MMS -- Minerals Management Service Home -- MMS Pacific O.C.S. RegionSearchTopic IndexAbout MMSWhat's New -- News & Updates U.S. Department of the Interior
Minerals Management Service Pacific O.C.S. Region

Skip to Main Content
Contact Information
Library
Organization
What's New

Intern Programs
Kids and Education

Environmental Info


Fisheries Biology
Rocky Intertidal Ecology
Lease Info
Boundaries/Maps
Lease -- Summary Report
Offshore Info

Annual Reserves Report

Facts & Figures
G & G Permits Online
Notices to Lessees
OCS Regulations
Platform Information
Resource Reports
Revenue Information
Safety Alerts
Safety Awards



Freedom of Information Act
Privacy Act/Disclaimers
Accessibility
Public Connect



Support Our Troops Logo with Eagle and Flag

Take Pride in America Flag Logo



        Questions?
   Need more information?
           Please Write:
 Pacific Public Information

            Comments
     about our website?
    Contact Web Master

 UNITED STATES DEPARTMENT OF THE INTERIOR
 MINERALS MANAGEMENT SERVICE
 PACIFIC OCS REGION

 NTL No. 2004-P01                                         Effective Date:  June 1, 2004

NOTICE TO LESSEES AND OPERATORS
OF FEDERAL OIL AND GAS LEASES
IN THE PACIFIC OUTER CONTINENTAL SHELF REGION

Production Measurement and Verification Program Submittals

This Notice to Lessees and Operators provides a summary of the reporting requirements for submittals made to satisfy the regulations at 30 CFR 250, Subpart L, Oil and Gas Production Measurement, Surface Commingling, and Security (30 CFR 250.1202 – 1204).

 

Submittal

Time Frame

Regulation

Liquid measurement and allocation plan, including liquid hydrocarbon royalty meters

Before commencing liquid hydrocarbon production or making changes to previously approved measurement procedures

30 CFR 250.1202 (a)(b)

Run tickets for oil measurement

Within 15 days after the end of the month

30 CFR 250.1202(c)

 

 

Liquid hydrocarbon royalty meter proving reports

Within 15 days after the end of  the month

30 CFR 250.1202(d)

Prover calibration

Within 15 days after calibration

30 CFR 250.1202(f)

 

 

 

Gas measurement and allocation plan

Before commencing gas production or making changes to previously approved measurement procedures

30 CFR 250.1203(a)(b)

Gas volume statements

Within 15 days after the end of the month

30 CFR 250.1203(b)(8)

Gas processing plant allocation statements

Within 15 days after the end of the month

30 CFR 250.1203(e)

 

 

 

Surface commingling of production application

Before commencing commingling of production or making changes to previously approved commingling applications

30 CFR 250.1204(a)

 Please note that run tickets and proving reports must contain all of the data specified in 30 CFR 250.1202-1204.  Do not submit multiple copies of run tickets or proving reports.  Run tickets or proving reports should come from a single source.  Include the name, phone number, fax number, and e-mail address for your contact person, should we have questions about the submittals.

Submittals should be mailed to:

     Minerals Management Service
     Pacific OCS Region
     Office of Reservoir Evaluation and Production
     Attention: Mike Brickey
     770 Paseo Camarillo
     Camarillo, California 93010

You may fax information to us at (805) 389-7737, or send e-mail to us at REP@mms.gov.

 Paperwork Reduction Act of 1995 Statement:  The collection of information referred to in this notice provides clarification, description, or interpretation of requirements in 30 CFR 250.1200-1205, Subpart L.  The Office of Management and Budget (OMB) approved the information collection requirement in these regulations and assigned OMB control number 1010-0051.  This notice does not impose additional information collection requirements subject of the Paperwork Reduction act of 1995.

 If you have any questions or need clarification regarding the NTL, please contact our office at (805) 389-7700, or Mike Brickey directly at (805) 389-7701, michael.brickey@mms.gov.

 Original Signed by

_______________________________                                June 1, 2004

Joan R. Barminski                                                                       Date
Chief, Reservoir Evaluation and Production

  


MMS Accessibility MMS Quality of Information MMS Privacy Policy MMS Freedom of Information MMS Disclaimer

Web Master: Nollie Gildow-Owens
Page content last updated 09/20/2006
Page last published 09/20/2006