Pages |
Section |
Description of Changes |
1 |
6-1 |
Modified section to highlight what is in chapter. |
2-6 |
6-2.2 |
Added new section describing schedules for EAP submittals and exercises. |
11-12 |
6-3.1.8 |
Added new section on EAP document security. |
12 |
6-3.2.1 |
Noted that changes to the EAP format should be coordinated with agencies and explained to the Regional Engineer. |
15-18 |
6-3.2.2 I |
Discussed emergency dispatch centers and revised sample notification flowchart. |
17 |
6-3.2.2 III |
Added sentence on document security. |
19-21 |
6-3.2.2 IV |
Added discussion on emergency classifications. Referred to Non-Failure Emergency Condition as Condition C. |
23-24 |
6-3.2.2 V B |
Added example emergency message and introduced Incident Command System. |
25 |
6-3.2.2 V C |
Explained section can reference EOPs. |
32-40 |
6-3.2.2 VII |
Revised section on inundation maps. Discussed map preparation, content, coordination, updates, and populations at risk. Included sample maps. |
41 |
6-3.2.2 App A |
Revised section on dam break analyses to reference Engineering Guidelines Chapter 2. |
43 |
6-3.2.2 App B |
Added that training plan should include public education, if appropriate. |
45 |
6-3.2.2 App D |
Revised “Documentation” section and removed “Approval of EAP” section. |
46-66 |
6-4.2 |
Revised detailed discussions on exercises. Provided orientation seminar requirements and possible discussion topics. Noted that testing emergency equipment should be done once a year and be considered part of the drill. Added methods for conducting tabletop exercises. Discussed scheduling functional exercises. |
70 |
6-4.5 |
Deleted expenditures section on results from exercises. |
71-73 |
6-5 |
Added new section on ensuring effective EAPs. |
74-75 |
6-6 |
Discussed annual requirements for projects exempt from EAPs. |
77-78 |
6-9 |
Added section on temporary construction emergency action plans. |
|
Appendices |
Eliminated dam break parameters since they are found in Chapter 2 of the Engineering Guidelines. |
80 |
App. 6-A |
Updated FEMA documents/classes. |
86 |
App. 6-C |
Made minor changes to evaluation report format. |
88-92 |
App. 6-D |
Provided requirements for submitting GIS inundation map information to the Commission. |
94 |
App. 6-E |
Provided Sample Coordination Checklist for EAP Status Reports. |