Form 715 - Annual Transmission Planning and Evaluation Report
Overview
    Each transmitting utility that operates integrated transmission system facilities that are rated at or above 100 kilovolts (kV), must annually submit this information the Commission.

    Through FERC-715, the Commission requires each Respondent to:

    • Identify a contact person [FERC-715, Part 1];

    • Submit in electronic format, its base case power flow data if it does not participate in the development and use of regional power flow data. A Respondent that participates in the development and use of regional power flow studies must either submit in electronic format the regional or sub regional base case power flow data or designate any regional or sub regional organization, or any other single entity to submit in electronic format the regional or sub regional base case power flow data [FERC-715, Part 2];

    • Submit transmission system maps and diagrams used by the Respondent for transmission planning [FERC-715, Part 3], preferably in an electronic format; regardless if changes have taken place during the past year; file these each year;

    • Submit a detailed description of the transmission planning reliability criteria used to evaluate system performance for time frames and planning horizons used in regional and corporate planning [FERC-715, Part 4];

    • Submit a detailed description of the Respondent's transmission planning assessment practices (including, but not limited to, how reliability criteria are applied and the steps taken in performing transmission planning studies) [FERC-715, Part 5]; and

    • Submit a detailed evaluation of the Respondent's anticipated system performance as measured against its stated reliability criteria using its stated assessment practices [FERC-715, Part 6]

    Respondents must submit one original FERC-715 to the Secretary of the Commission. Although the Commission prefers electronic format, with the exception of the signed transmittal letter, hardcopy is also acceptable.

    The Commission considers the information collected in FERC-715 as Critical Energy Infrastructure Information (CEII) and will treat it as such. Please follow the instructions provided under our CEII Filing Guidelines section - to request a copy of any Form 715 filed with the Commission.

  Downloads & Links

Form 715
 

  Contact Information

Cleveland Richards
Telephone: 202-502-6466

Sarbjit Singh
Telephone: 202-502-8643
Email: form715@ferc.gov

FERC Online Support
Telephone: 202-502-6652
Toll-free: 1-866-208-3676
Email: ferconlinesupport@ferc.gov

Submit data to:
Federal Energy Regulatory Commission
Form No. 715
Secretary of the Commission
888 First Street, N.E.
Washington, DC 20426
 



Updated: November 5, 2008