skip navigation
Text Size small medium large  

skip navigation
Energy Supply & Demand
Electric
Annual Charges
Safety and Inspections
Environment
Industry Activities
Electric Competition
Transmission Investment
Demand Response
Energy Innovations
Electric Reliability
RTO/ISO
Power Blackout
Addressing the 2000-2001 Western Energy Crisis
Generator Interconnection
Joint Boards
Open Access Transmission Tariff (OATT) Reform
Transmission Line Siting
General Information
Hydropower
Gas
Liquefied Natural Gas (LNG)
Oil


Industries

Transmission Line Siting

Prefiling Requests

If the Director approves the pre-filing request, a notice will be issued informing the public of the initiation of the pre-filing process. As part of the pre-filing process, an applicant is required to implement a Project Participation Plan that identifies specific tools and actions to facilitate stakeholder communication and dissemination of public information to those who are interested in the proposed transmission project. During the pre-filing process, Commission staff will review the applicant’s proposal and assist the applicant in the preparation of a complete application. Staff activities may include: conducting site visits, facilitating the identification and resolution of issues, and initiating the environmental review of the proposed project. By engaging stakeholders early in the process and resolving relevant issues, the proposed project will become better defined and the benefits and impacts of the proposed project will be better understood. The work performed in the pre-filing process will form the basis for the application that is subsequently filed with the Commission.

Predefined eLibrary searches
Docket Project Company Point of Contact Description States Corridor Date
Pre-Filing Process Initiated
PT08-1 Devers-Palo Verde No. 2 Project Southern California Edison Company External Link Michael Huynh
866-602-3782
The proposed transmission facilities include a new 267-mile 500 kV line from a new Harquahala Junction Switchyard (west of Phoenix, Arizona) to SCE’s Valley Substation (near Romoland, California) California and Arizona (The CPUC approved the California portion of the line on January 25, 2007) Southwest Notice PDF (5/30/2008)

  Contact Information

John Schnagl
Telephone: 202-502-8756
Email: john.schnagl@ferc.gov

Carolyn Van Der Jagt
Telephone: 202-502-8620
Email: carolyn.VanDerJagt@ferc.gov
 

  Additional Information

Orders
 



Updated: October 20, 2008