CONTRACTING
OPPORTUNITIES Fiscal Year 2009
Last updated
**Table coding: FBO Y/N, indicates whether a copy of the
synopsis/solicitation is posted on the Federal Business Opportunities website
(FBO). Simply click on the “Y” to be
connected directly to the FBO posting.
Please use this website when possible to print solicitations in which
you have an interest.
FBO is a great resource to
use when seeking federal contracts.
Through this single portal, commercial vendors seeking Federal markets
for their products and services can search, monitor and retrieve opportunities
solicited by the entire Federal contracting community. Click here to link to the FBO home page – http://www.fbo.gov/.
**To
receive a printed copy of a solicitation from the Forest, please
phone/fax/email a request to the Forest contact listed at the bottom of this
page.
Previous listings: Fiscal Year 2008
CLEARWATER
NATIONAL FOREST PROJECTS |
||||||||
Solicitation # |
FBO Y/N |
Solicitation Issue Date |
Response Due Date & Time |
Ranger District |
Description of the work |
Award Date |
Contractor Name |
Award Amount |
AG-0276-S-09-0005 |
N |
|
|
|
CWN -The work includes furnishing equipment
on a fully operated Call When Needed (CWN) basis in compliance with its
terms, specifications and provisions.
This includes furnishing all labor, equipment, supervision, operating
supplies and incidentals to perform the work. |
|
|
|
AG-0276-S-09-0004 |
Presolicitation Notice |
|
Pierce & Palouse RD |
Hand Tree
Planting - Hand Tree planting in
spring season on the Pierce and Palouse Ranger Districts. Indefinite quantity
contract for base year 2009 plus two renewal option years. Estimated program
size for 2009 is 300 acres Pierce Ranger District and 400 acres Palouse
Ranger District. Approx. 150-350 acres each district in 2010 and approx.
100-300 acres each district in 2011. Estimated starting date in April each
year. |
|
|
|
|
AG-0276-S-09-0003 |
|
|
Powell Ranger District |
Garbage
Collection – Powell Ranger Station, Lolo Visitor's Center and Powell Campgrounds |
|
|
|
|
AG-0276-S-09-0002 |
Presolicitation Notice |
|
North Fork Ranger District |
Independence
Creek Ford Replacement -This
project consists of furnishing and installing a welded steel low water
structure on precast concrete abutments in place of an existing unimproved
ford on Independence Creek on Road No. 5440 on the A pre-bid tour was held on |
|
|
|
|
AG-0276-C-09-0001 |
Presolicitation Notice |
|
Palouse RD |
Elk Creek
Falls Trailhead Reconstruction - Project
consists of the following work: Enlarge existing parking area. Construct
turnouts along road 1452B. Remove and dispose existing wood toilets and
furnish and install new concrete vault toilets. Furnish and install parking
barriers and picnic tables. Enlarge picnic area. Furnish all materials to
mount and install Gov't furnished signing, install Gov't furnished signs.
Apply Gov't furnished crushed aggregate on parking area and road 1452B. Est. price: $100,000-$250,000. Est. start
work: |
|
|
|
|
NEZ PERCE
NATIONAL FOREST PROJECTS |
||||||||
Solicitation # |
FBO Y/N |
Solicitation Issue Date |
Response Due Date & Time |
Ranger District |
Description of the work |
Award Date |
Contractor Name |
Award Amount |
AG-0295-S-09-0006 |
N |
|
|
Salmon River Ranger District |
Vinegar Creek Boat Ramp Project -The work shall entail the reconstruction of the
Vinegar Creek Boat Ramp on the Salmon
River Ranger District. This work shall include the following: Manufacturing
and delivery of 6 pre-cast concrete extensions as shown in drawings and as
specified. Installation of extension panels including all
hardware, minor sediment removal at the base of the existing stationary boat
ramp, drilling and installation of anchoring eye bolts to the boat ramp, and
placement and connection of new extension panels as shown in drawings and as
specified. Project Location:
SW, SW, Sec 31, Township 1 South, Range 4 East - To reach the project
site from Grangeville, ID, drive south on Hwy. 95 to Riggins, Idaho and turn
east on the Salmon River Road. Drive approximately 26 miles to the end of the
road and to the farthest upriver boat ramp at Vinegar Creek Recreation Site.
|
|
|
|
|
|
Contract number is AG-0295-C-09-0004 |
|
|
Statement of Work Training in Application of Techniques for Estimating Sediment and
Streamflow Production and Trends – Contractors: Dr. John King, Hydrology Consulting Mr. Robert Thomas, Statistical Consulting Objectives: Provide
training and instruction in quality assurance and quality control (QA/QC) for
data preparation; provide training in application of appropriate software and
techniques; assist in application of software and techniques to data from at
least one new gaging site; and provide guidance and review of ongoing and
completed work performed by Forest Service personnel. The
training in application of software and techniques would use work previously
completed on the Main Fork and South Fork Red River. New work would focus on Little Slate Creek
and may involve application of additional techniques. Following the 3-day training session, the
contractors would be available for consultation and review of work through
approximately June 30, 2009. The
contractors would provide the following services and products. |
12/16/08 |
Mr. John King, Hydrology Consulting |
$15,623 |
AG-0295-S-09-0004 |
Presolicitation Notice |
|
Clearwater RD |
False Creek Road
Decommissioning and Soil Restoration Phase I - Service project consisting of road
decommissioning by recontouring and decompacting, as well as soil
restoration. Work includes drainage
maintenance, subgrade scarification, road obliteration, seeding and hand
straw mulching. Approximately 10-20
miles of old roads skid trails will be treated. Solicitation will be issued in Spring of
2009. Set-aside for HUBzone small
business |
|
|
|
|
AG-0295-S-09-0003 |
Presolicitation Notice |
|
Red
River RD |
Newsome Road
Decommissioning Phase III
- Service project consisting of road decommissioning by recontouring and
decompacting. Work includes drainage
maintenance, road obliteration, culvert removal, seeding and hand straw
mulching. Approx. 17 miles of old road
and skid trails will be treated. Solicitation will be issued in Spring of
2009. Set-aside for HUBzone small
businesses. |
|
|
|
|
AG-0295-S-09-0002 |
Presolicitation Notice |
|
Clearwater
RD |
Whitman Creek Road
Decommissioning and Soil Restoration - Service project consisting of road decommissioning by
recontouring and decompacting, as well as soil restoration. Work includes drainage maintenance, subgrade
scarification, road obliteration, seeding and hand straw mulching. Approximately 22 miles of old roads skid
trails will be treated. Solicitation
will be issued in Spring of 2009.
Set-aside for HUBzone small businesses. |
|
|
|
|
AG-0295-S-09-0001 |
Presolicitation Notice |
|
|
Construction of stream improvement features over approximately 2
miles of |
|
|
|
|
RFQ R1-17-09-001 |
|
|
Forest-Wide |
Garbage Collection/Disposal - The RFQ has eleven items located at various
locations on the forest and at district offices. It has been posted to Federal Business
Opportunities with a closing date of |
10/27/08 |
Walco, Inc. Simmons Sanitation |
Items 1, 2, 3, 4, 9,
10, and 11 for $25,724.20 Items 5, 6, 7, and 8
for $20,485.39 |
DETAILS:
Nez
Perce NF procurements: phone 208-983-5144 or fax a request to (208) 983-4098 or
email Karen Ruklic at kruklic@fs.fed.us.
In
regards to each solicitation referenced above, all responsible sources may
submit a response, which if timely received, must be considered by the agency.