Apollo 17 Lunar Surface Journal Banner

Apollo 17 Lunar Surface Checklist

This checklist was scanned by Gerald Megason.
Last revised 14 September 2006.


Cover (12k)

Signature Page (14k)

Acknowledgements (10k)

List of Effective Pages (24k)

Table of Contents (8k)

Flight Plan, 108-120 hours Ground Elapsed Time (GET) (22k)

Flight Plan, 120-132 hours GET (22k)

Flight Plan, 132-144 hours GET (20k)

Flight Plan, 144-156 hours GET (18k)

Flight Plan, 156-168 hours GET (20k)

Flight Plan, 168-180 hours GET (18k)

Flight Plan, 180-192 hours GET (22k)

Surface 1-1, PDI+20 Doff Helmets and Gloves (18k)

Surface 1-2, Platform Alignment (16k)

Surface 1-3, Platform Alignment (end) (14k)

Surface 1-4, CB(11) Row 1 (10k)

Surface 1-4, CB(11) Row 2 (10k)

Surface 1-6, Power Switch Configuration (18k)

Surface 1-7, Power Switch Configuration (cont.) (18k)

Surface 1-8, Power Switch Configuration (end) (14k)

Surface 1-9, 113:42, Configure Cabin for Stay & Eat Period (18k)

Surface 2-1, 114:55, Cabin Prep for EVA-1 (18k)

Surface 2-2, Collection Weight Summary (8k)

Surface 2-3, Transition to One-Man EVA (14k)

Surface 2-4, LM Repress Failure Procedure (20k)

Surface 2-5, 115:15, Equipment Prep for EVA-1 (18k)

Surface 2-6, 115:40, PLSS Donning (20k)

Surface 2-7, PLSS Comm Check (18k)

Surface 2-8, PLSS Comm Check (end) (14k)

Surface 2-9, OPS Connect & Helmet/Glove Donning (22k)

Surface 2-10, Press Integrity Check, Cabin Depress, & Final Prep for EVA (20k)

Surface 3-1, Post-EVA-1 & Post-EVA System Configuration (18k)

Surface 3-2, 123:55, PLSS O2 & PLSS/OPS Doffing (16k)

Surface 3-3, 124:40, Post-EVA Cabin Configuration (24k)

Surface 3-4, 125:00 Doff Suits (18k)

Surface 3-5, Configure ETB & Eat Period (20k)

Surface 3-6, 127:00, PLSS O2/H2O Recharge & Pre-Sleep (24k)

Surface 3-7, Hammock Deployment (18k)

Surface 3-8, 135:55, Post-Sleep (16k)

Surface 3-9, 137:00, Don Suits (16k)

Surface 3-10, Battery Management (6k)


Journal Home Page Apollo 17 Journal Index