WEST BANK & VICINITY NEW ORLEANS, LA -- HARVEY / WESTWEGO (43 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
WBV-14a.1 | Harvey Canal West Bank Levees, 2nd Englt Phase 1 | 8(a) - MATOC | $1.77 | 04-15-2008 |
WBV-14a.2 | Harvey Canal West Bank Levees - Phase 2 | HZ-MATOC | $5-20M | Q-1-2010 |
WBV-14b.1 | Orleans Village to Hwy 45, Levee-Phase 1 | HZ-MATOC | $3.00 | 08-28-2007 |
WBV-14b.2 | Orleans Village to Hwy 45 Levee- Phase 2 | HZ-MATOC | $5-20M | Q-4-2009 |
WBV-14c.1 | New Westwego PS to Orleans Village, 3rd Enlgt-Phase 1 | HUBZONE | $8.98 | 03-14-2008 |
WBV-14c.2 | New Westwego PS to Orleans Village- Phase 2 | HZ-MATOC | $5-20M | Q-4-2009 |
WBV-14d | V-line Floodwall | HUBZONE - IFB | $50-100M | Q-2-2009 |
WBV-14e.1 | V-line Levee, east of Vertex- Phase 1 | HZ-MATOC | $8.01 | 06-06-2008 |
WBV-14e.2 | V-line levee, South - Phase 2 | HZ-MATOC | $20-50M | Q-4-2009 |
WBV-14f.2 | Hwy 45 levee- Phase 2 | HZ-MATOC | $0-5M | Q-2-2009 |
WBV-14g.1 | Old Estelle to New Estelle | HZ-MATOC | $6.82 | 09-13-2007 |
WBV-14g.2 | Estelle PS Vicinity Floodwalls | HUBZONE - BV | $50-100M | Q-3-2009 |
WBV-15a.1 | Lake Cataouatche PS to Segnette State Park-Phase 1 | Unrestricted | $44.72 | 07-27-2007 |
WBV-15a.2 | Lake Cataouatche PS to Segnette State Park-Phase 2 | Unrestricted - Best Value | $5-20M | Q-4-2009 |
WBV-15b.1 | Lake Cataouatche PS Fronting Protection, Modifications | HZ-MATOC | $4.86 | 08-31-2007 |
WBV-15b.2 | Lake Cataouatche PS Fronting Protection, Modifications | HZ-MATOC | $20-50M | Q-1-2009 |
WBV-16.1 | Segnette PS to New Westwego PS Floodwall - Phase 1 | HZ-MATOC | $19.00 | 05-23-2007 |
WBV-16.2 | Bayou Segnette Complex | Unrestricted - Best Value | $20-50M | Q-4-2009 |
WBV-16b | Segnette PS Fronting Protection & Modifications. | Unrestricted - Best Value | $20-50M | Q-3-2009 |
WBV-17b.1 | Station 160+00 to Hwy 90- Phase 1 | HUBZONE | $14.62 | 03-19-2008 |
WBV-17b.2 | Station 160+00 to Hwy 90- Phase 2 | HZ-MATOC | $0-5M | Q-3-2009 |
WBV-18.1 | Hwy 90 to Lake Cataouatche PS - Phase 1 | Unrestricted | $16.85 | 10-24-2006 |
WBV-18.2 | Hwy 90 to Lake Cataouatche PS - Phase 2 | Unrestricted - Best Value | $5-20M | Q-3-2009 |
WBV-20 | New Westwego PS fronting Protection and Modifications | HUBZONE - BV | $5-20M | Q-2-2009 |
WBV-21 | Old Westwego PS Fronting Protection and Modifications | HZ-MATOC | $0-5M | Q-2-2009 |
WBV-22 | Westwego Floodwall | Unrestricted - IFB | $20-50M | Q-4-2009 |
WBV-23 | New Estelle PS Fronting Protection and Modifications | HZ-MATOC | $5-20M | Q-2-2009 |
WBV-24 | Segnette State Park Floodwall | HZ-MATOC | $100-500M | Q-2-2009 |
WBV-30 | Westminster PS Fronting Protection and Modifications | HZ-MATOC | $5-20M | Q-1-2009 |
WBV-33 | Old Estelle PS Fronting Protection and Modifications | HZ-MATOC | $20-50M | Q-2-2009 |
WBV-37 | Ames / Mt. Kennedy Pump Stations | Unrestricted - Best Value | $20-50M | Q-2-2009 |
WBV-38.1 | Cousins PS- Phase 1 | Unrestricted | $18.78 | 09-16-2006 |
WBV-38.2 | Cousins PS & Discharge Channel Floodwalls - Phase 2 | Unrestricted - Best Value | $50-100M | Q-3-2009 |
WBV-46.1 | Sector gate Complex - Phase 1 | Unrestricted | $35.69 | 12-16-2003 |
WBV-46.2 | Sector gate complex- Phase 2 | Unrestricted - Best Value | $5-20M | Q-3-2009 |
WBV-60 | '07 Priority Interim-Contract 3: Weswego Floodwall | 8(a) | $8.12 | 12-07-2007 |
WBV-61 | '07 Priority Interim-Contract 4: Segnette Park Floodwall | 8(a) | $7.70 | 11-20-2007 |
WBV-63b.1 | '07 Priority Interim-Contract 7b, Misc WB Pump Stations and Utility Crossings | 8(a) | $3.50 | 07-03-2007 |
WBV-71 | Western Tie-In Levees (North-South) | 8(a) - MATOC | $0-5M | Q-3-2009 |
WBV-72 | Western Tie-In Levees (East-West) | Unrestricted - Best Value | $20-50M | Q-4-2009 |
WBV-73 | Western Tie-In Highway Crossing | HZ-MATOC | $5-20M | Q-3-2009 |
WBV-74 | Western Tie-In Closure Structure | HZ-MATOC | $5-20M | Q-3-2009 |
WBV-75 | Western Tie-In Railroad Crossing | HZ-MATOC | $0-5M | Q-4-2009 |
LAKE PONTCHARTRAIN & VICINITY -- JEFFERSON EAST BANK / ST.CHARLES (39 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
LPV-00.1 | Reach 1 Lakefront Levee- Phase 1 | 8(a) - MATOC | $4.57 | 08-31-2006 |
LPV-00.2 | Reach 1 Lakefront Levee- Phase 2 | 8(a) - MATOC | $0-5M | Q-2-2009 |
LPV-01.1 | Reach 2 Lakefront Levee - Phase 1 | 8(a) - MATOC | $0-5M | Q-2-2009 |
LPV-01.2 | Reach 2 Lakefront Levee - Phase 2 | 8(a) - MATOC | $0-5M | Q-2-2009 |
LPV-02.1 | Reach 3 Lakefront Levee (3rd Lift)- Phase 1 | 8(a) - MATOC | $5.52 | 10-06-2006 |
LPV-02.2 | Reach 3 Lakefront Levee- Phase 2 | 8(a) - MATOC | $0-5M | Q-2-2009 |
LPV-03.2 | West Return Floodwall - Phase 2 | Unrestricted - IFB | $100-500M | Q-4-2009 |
LPV-03a.1 | West Return Floodwall - Vintage-Phase 1 | 8(a) | $1.68 | 05-13-2006 |
LPV-03b.1 | West Return Floodwall, Airport I-wall- Phase 1 | 8(a) | $0.59 | 09-16-2006 |
LPV-03c.1 | West Return Floodwall- I-wall @ I-10- Phase 1 | HZ-MATOC | $0.09 | 04-24-2007 |
LPV-03d.2 | Airport Runway10 Levee - Phase II | Unrestricted | $0-5M | Q-1-2010 |
LPV-04.1 | Levee - Reach 1A, 1B & 2A- Phase 1 | HZ-MATOC | $12.93 | 06-28-2007 |
LPV-04.2A | Levee - Reach 1A - Phase 2 | HZ-MATOC | $0-5M | Q-4-2009 |
LPV-04.2B | Levee - Reach 1B - Phase 2 | HZ-MATOC | $0-5M | Q-4-2009 |
LPV-05.1 | Levee - Reach 2B (2nd Lift)- Phase 1 | 8(a) - MATOC | $4.66 | 09-14-2006 |
LPV-05.2A | Levee - Reach 2A - Phase 2 | HZ-MATOC | $0-5M | Q-4-2009 |
LPV-05.2B | Levee - Reach 2B- Phase 2 | HZ-MATOC | $0-5M | Q-4-2009 |
LPV-06a.2 | Bonnet Carre Floodwall, Drainage Structure and Tie-Ins - Phase 2 | HUBZONE - IFB | $0-5M | Q-4-2009 |
LPV-06b.2 | Shell Pipeline Floodwall - Phase 2 | HUBZONE - IFB | $0-5M | Q-4-2009 |
LPV-06c.2 | Goodhope Floodwall - Phase 2 | Unrestricted - IFB | $5-20M | Q-4-2009 |
LPV-06d.2 | Gulf South Floodwall - Phase 2 | HUBZONE - IFB | $0-5M | Q-2-2009 |
LPV-06e.1 | Floodwall under I-310 - Phase 1 | 8(a) - MATOC | $0.47 | 04-27-2007 |
LPV-06e.2 | Floodwall Under I-310 - Phase 2 | Unrestricted - Best Value | $5-20M | Q-1-2010 |
LPV-06f.2 | Canadian National Railroad Gate - Phase 2 | Unrestricted - Best Value | $5-20M | Q-1-2010 |
LPV-07b.2 | Cross Bayou Drainage Structure - Phase 2 | Unrestricted | $5-20M | Q-3-2009 |
LPV-07c.2 | St. Rose Drainage Structure & Levee - Phase 2 | Unrestricted | $5-20M | Q-2-2009 |
LPV-07d.2 | Almedia / Walker Drainage Structures - Phase 2 | 8(a) - MATOC | $5-20M | Q-1-2009 |
LPV-09.1 | PS#1 (Bonnabel) Floodwall Tie ins & Floodwall/Gate at Boat Launch - Phase 1 | HZ-MATOC | $0.29 | 05-16-2007 |
LPV-09.2 | Pumping Stations #1 (Bonnabel), #2 (Suburban), #3 (Elmwood) and #4 (Duncan) Modifications, Fronting Protection, Positive Cutoff and Floodwall Tie-ins - Phase 2 | Unrestricted | $20-50M | Q-2-2009 |
LPV-09a.2 | Pumping Station #1 (Bonnabel) Breakwater - Phase 2 | Unrestricted | $0-5M | Q-2-2009 |
LPV-10.1 | Pumping Station #2 (Suburban) Floodwall Tie-ins-Phase 1 | 8(a) - MATOC | $1.19 | 09-22-2006 |
LPV-11.1 | Pumping Station #3 (Elmwood) Floodwall tie-ins- Phase 1 | 8(a) | $1.39 | 09-22-2006 |
LPV-12a.2 | Pumping Station #4 (Duncan) Breakwater - Phase 2 | Unrestricted | $0-5M | Q-2-2009 |
LPV-16.2 | Floodwall and Gate at Bonnabel Boat Launch- Phase 2 | HUBZONE - BV | $0-5M | Q-3-2009 |
LPV-17.2 | Bridge abutment and Floodwall Tie-ins at Causeway Bridge -Phase 2 | HUBZONE - BV | $0-5M | Q-2-2010 |
LPV-18.2 | Floodwall and Gate at Williams Blvd. Boat Launch-Phase 2 | HUBZONE - BV | $0-5M | Q-2-2009 |
LPV-19.2 | Reach 4 Lakefront Levee - Phase 2 | HZ-MATOC | $0-5M | Q-2-2009 |
LPV-20.1 | Reach 5 Lakefront Levee - Phase 1 | 8(a) - MATOC | $0.00 | 10-27-2008 |
LPV-20.2 | Reach 5 Lakefront Levee - Phase 2 | HZ-MATOC | $5-20M | Q-2-2009 |
NEW ORLEANS TO VENICE -- PLAQUEMINES (23 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
NOV-01 | East Bank Back Levee Reach C (Phoenix to Bohemia) | Unrestricted - Best Value | $20-50M | Q-1-2010 |
NOV-02 | East Bank Back Levee Two Pump Structure Frontage Repair Reach C (Phoenix to Bohemia) | Unrestricted | $20-50M | Q-2-2010 |
NOV-05 | West Bank Back Levee Repair Reach A (St. Jude to City Price) | Small Business | $5-20M | Q-3-2010 |
NOV-06 | West Bank Back Levee Repair Reach A (City Price to Port Sulphyr) | 8(a) | $20-50M | Q-3-2010 |
NOV-07 | West Bank Back Levee Repair Reach B1 (Port Sulphur to Fort Jackson) | HUBZONE | $20-50M | Q-3-2010 |
NOV-08 | West Bank Back Levee Reach B2 (Fort Jackson to Venice) | 8(a) | $5-20M | Q-3-2010 |
NOV-09 | West Bank MRL Levee Repair (St. Jude to City Price) | HZ-MATOC | $50-100M | Q-3-2010 |
NOV-10 | West Bank MRL Levee Repair (City Price to Port Sulphur) | Small Business | $5-20M | Q-3-2010 |
NOV-11 | West Bank MRL Levee Repair (Port Sulphur to Fort Jackson) | Unrestricted - Best Value | $5-20M | Q-3-2010 |
NOV-12 | West Bank MRL Levee Repair (Fort Jackson to Venice) | Unrestricted - Best Value | $20-50M | Q-3-2010 |
NOV-13 | Empire Floodgate | Unrestricted - Best Value | $0-5M | Q-3-2010 |
NOV-14 | Empire Lock | Unrestricted - Best Value | $5-20M | Q-3-2010 |
NOV-15 | West Bank Floodwall Repair at Duvic Pump Station | HUBZONE | $5-20M | Q-2-2010 |
NOV-15.01 | West Bank Floodwall Interim Measure Repair Duvic and Grand Liard Pump Stations Constructed by Hired Labor | Hired Labor | $4.00 | 08-08-2007 |
NOV-16 | West Bank MRL Levee Enlargement Buras Area Sta. 650+00 to 1003+00 | | $20-50M | Q-3-2010 |
NOV-NF-W-04 | Oakville to LaReusitte | Small Business | $50-100M | Q-4-2010 |
NOV-NF-W-05 | LaReusitte to Myrtle Grove | Unrestricted - Best Value | $100-500M | Q-4-2010 |
NOV-NF-W-06 | Myrtle Grove to St.Jude | Unrestricted | $100-500M | Q-4-2010 |
P-13 | Landside Levee Enlargement Port Sulphur Area | | $10.67 | 02-10-2006 |
P-14 | Landside Levee Enlargement Empire/Buras Area | | $20.20 | 01-26-2006 |
P-15.02 | Empire Floodgate Repair | | $4.00 | 01-20-2006 |
P-17 | Landside Levee Enlargement Buras Area | | $9.32 | 02-03-2006 |
P-24 | Landside Levee Enlargement Port Sulphur Area | | $34.18 | 01-30-2006 |
LAKE PONTCHARTRAIN & VICINITY -- NEW ORLEANS EAST (17 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
LPV-105.01 | Lakefront Airport Floodwalls - West | Unrestricted - Best Value | $20-50M | Q-2-2010 |
LPV-105.02 | T-wall existing alignment- Lakefront Airport - East | Unrestricted - Best Value | $20-50M | Q-1-2010 |
LPV-105.03 | Interim Measures at Lakefront Airport Floodwall. Completed by Hired Labor | Hired Labor | $0.75 | 07-18-2007 |
LPV-106 | Replace Levee W/T - Citrus Lakefront Levee (west of Paris Road) | Unrestricted | $100-500M | Q-4-2009 |
LPV-107 | Replace Gate at Lincoln Beach Floodwall | HUBZONE | $20-50M | Q-2-2010 |
LPV-108 | Raise Levee - Paris Rd. to South Point | Unrestricted | $10.55 | 11-21-2008 |
LPV-109.01 | New Orleans East Levee - Intermediate Levee Raise - South Point to GIWW | Unrestricted - Best Value | $100-500M | Q-1-2009 |
LPV-109.02a | New Orleans East Levee - South Point to CSX RR (100 YR) | Unrestricted - Best Value | $20-50M | Q-1-2010 |
LPV-109.02b | I-10 Floodwall & Crossing | Unrestricted - Best Value | $20-50M | Q-2-2010 |
LPV-109.02c | US11 & US90 Gates & Crossings | Unrestricted - Best Value | $5-20M | Q-1-2010 |
LPV-110 | New Orleans East Levee - Modify CSX Railroad Gate | SDV | $0-5M | Q-2-2010 |
LPV-111.01 | New Orleans East Back Levee - CSX RR to Michoud Canal | Unrestricted - Best Value | $100-500M | Q-4-2009 |
LPV-111.02 | Raise Wall at Pump Station #15 | Unrestricted - Best Value | $5-20M | Q-1-2010 |
LPV-113 | Citrus Back Levee (Michoud Canal to Michoud Slip) to Auth. Elevation | HZ-MATOC | $0-5M | Q-4-2008 |
LPV-115 | Citrus Back Levee - Michoud Slip to IHNC Completed by Hired Labor | Hired Labor | $1.10 | 12-21-2006 |
LPV-116 | EB IHNC-GIWW/MRGO to Almonaste. Completed by Hired Labor | Hired Labor | $1.50 | 12-30-2006 |
NOE-09 | Michoud Slip to Michoud Canal, Floodwall Scour Repair | | $21.65 | 02-03-2006 |
LAKE PONTCHARTRAIN & VICINITY -- NEW ORLEANS METRO (15 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
LPV-101.02 | Lakefront Levee OEB - 17th St. Canal to Topaz St. | Unrestricted - Best Value | $20-50M | Q-2-2009 |
LPV-102.01 | Lakefront Levee OEB - Topaz to Orleans Canal | HZ-MATOC | $1.10 | 10-03-2007 |
LPV-103.01 | Lakefront Levee OEB - Orleans Canal to London Ave | HZ-MATOC | $5.20 | 12-03-2007 |
LPV-103.01a | Lakefront Levee OEB - 17th St. canal to London Av. Canal - Phase 1A | HZ-MATOC | $5-20M | Q-2-2009 |
LPV-103.01A2 | Lakefront Levee OEB - Orleans Canal to London Ave. | Unrestricted - Best Value | $5-20M | Q-2-2009 |
LPV-104.01 | Lakefront Levee OEB - London Avenue Canal to IHNC | HZ-MATOC | $1.29 | 07-13-2007 |
LPV-104.01a | Lakefront Levee OEB - London Ave. Canal to IHNC - Phase 1A | HZ-MATOC | $5-20M | Q-2-2009 |
LPV-104.02 | Lakefront Levee OEB - London Ave Canal to IHNC | Unrestricted - Best Value | $5-20M | Q-3-2009 |
LPV-201 | IHNC - GIWW to Almonaster. Completed by Hired Labor | Hired Labor | $0.10 | 12-30-2006 |
OEB-02 | Lake Pontch - 17th St Canal Floodwall Repair, Phase II | | $15.17 | 02-15-2006 |
OEB-04 | Lake Pontch - London Ave Canal Breach at Mirabeau, Phase II | | $12.02 | 02-10-2006 |
OEB-06 | Lake Pontch - London Ave Canal Breach at Robert E Lee, Phase II | | $9.85 | 02-24-2006 |
OEB-09 | Lake Ponch - Interim Closure Structure at 17th St. Canal | | $62.57 | 01-27-2006 |
OEB-10 | Lake Ponch - Interim Closure Structure at London Ave Canal | | $40.31 | 01-27-2006 |
OEB-11 | Lake Ponch - Interim Closure Structure at Orleans Ave Canal | | $47.70 | 02-03-2006 |
WEST BANK & VICINITY NEW ORLEANS, LA -- GRETNA / ALGIERS (13 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
WBV-01 | Contract 1, Sectorgate to Boomtown Floodwall | Unrestricted | $132.13 | 02-01-2008 |
WBV-02a | Contract 2a, Boomtown Floodwalls | Unrestricted | $48.45 | 07-17-2008 |
WBV-02b | Contract 2b, Boomtown to Hero PS Floodwalls | Unrestricted | $56.10 | 03-26-2007 |
WBV-03a | Contract 3a, Hero PS to Algiers Canal Floodwall | Unrestricted | $62.28 | 07-14-2008 |
WBV-03b | Contract 3b, Hero PS to Algiers Canal Floodwall | Unrestricted - Best Value | $32.01 | 12-08-2008 |
WBV-04.2 | Belle Chasse Hwy to Hero Cutoff-Reach1-Phase 2 | HZ-MATOC | $0-5M | Q-3-2009 |
WBV-05.2 | Belle Chasse Hwy to Hero Cutoff-Reach 2 - Phase 2 | HZ-MATOC | $5-20M | Q-3-2009 |
WBV-06.2 | Belle Chasse Hwy to Hero Cutoff-Reach 3 & 4-Phase 2 | HZ-MATOC | $20-50M | Q-3-2009 |
WBV-06a.1 | Belle Chasse Hwy to Hero Cutoff (West) | HZ-MATOC | $9.62 | 01-04-2008 |
WBV-07 | Planters PS Fronting Protection and Modifications | Unrestricted - Best Value | $20-50M | Q-3-2009 |
WBV-08 | S&WB PS #13 Fronting Protection and Modifications | Unrestricted - Best Value | $20-50M | Q-3-2009 |
WBV-44 | Whitney Barataria PS Fronting Protection and Modifications | Unrestricted - Best Value | $20-50M | Q-3-2009 |
WBV-47.1 | Algiers Lock to Belle Chasse Hwy (West) - Phase 1 | Unrestricted - Best Value | $5-20M | Q-4-2009 |
SELA -- NEW ORLEANS METRO (12 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
SELA-19 | Florida Avenue - Phase 1 | Unrestricted - Best Value | $20-50M | Q-2-2009 |
SELA-20 | Florida Avenue - Phase 2 | Unrestricted - Best Value | $50-100M | Q-2-2009 |
SELA-21 | Uptown Jeff Avenue - Phase 1 - Claiborne to Dryades | Unrestricted - Best Value | $50-100M | Q-3-2010 |
SELA-22 | Uptown Jeff Avenue - Phase 2 - Dryades to Constance | Unrestricted - Best Value | $50-100M | Q-4-2010 |
SELA-23 | Uptown Naploleon Avenue - Phase 2 - Claiborne to Carondelet | Unrestricted - Best Value | $50-100M | Q-4-2009 |
SELA-23a | Uptown Naploleon Avenue - Phase 3 - Carondelet to Constance | Unrestricted - Best Value | $50-100M | Q-4-2009 |
SELA-24a | Uptown S. Claiborne - Phase 1 - Montecello to Leonidas | Unrestricted - Best Value | $50-100M | Q-1-2010 |
SELA-24b | Uptown S. Claiborne - Phase 2 - Leonidas to Lowerline | Unrestricted - Best Value | $50-100M | Q-2-2010 |
SELA-25 | Florida Avenue - Phase 3 | Unrestricted - Best Value | $20-50M | Q-4-2009 |
SELA-26 | Florida Avenue - Phase 4 | Unrestricted - Best Value | $20-50M | Q-3-2011 |
SELA-27 | Uptown Louisiana Avenue - Claiborne to Constance | Unrestricted - Best Value | $50-100M | Q-4-2011 |
SELA-OG-4 | Pritchard Place Pump Station | | $5-20M | Q-- |
SELA -- JEFFERSON EAST BANK / ST.CHARLES (11 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
SELA-01 | Soniat Canal - Veterans to Canal #3 & gap below Veterans | Unrestricted - Best Value | $24.02 | 11-16-2006 |
SELA-01a | Soniat Canal - West Napoleon to Lynette | HZ-MATOC | $5-20M | Q-2-2009 |
SELA-04 | Elmwood Canal Bridge @ Kawanee | 8(a) - MATOC | $5.84 | 01-30-2007 |
SELA-04a | Elmwood Canal Bridge @ W. Esplanade | HZ-MATOC | $13.08 | 02-26-2007 |
SELA-07 | Pump to the River Disc. Tubes (750' Segment) | SDV | $8.45 | 08-14-2007 |
SELA-07a | Pump to the River Remaining Discharge Tubes | SDV | $50-100M | Q-1-2011 |
SELA-08 | Soniat Canal-West Metairie to Lynette | Unrestricted - Best Value | $20-50M | Q-4-2009 |
SELA-09 | Pump to the River PS and Intake Structure | Unrestricted - Best Value | $50-100M | Q-4-2010 |
SELA-OG-1 | Soniat Canal - West Napoleon to Veterans | | $20-50M | Q-- |
SELA-OG-6 | Suburban Pump Station | | $5-20M | Q-- |
SELA-OG-7 | Elmwood Pump Station | | $5-20M | Q-- |
LAKE PONTCHARTRAIN & VICINITY -- ST BERNARD (8 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
LPV-142 | Interim Measure - South Side of GIWW | | $0.00 | 06-10-2007 |
LPV-144 | Chalmette Loop Levee - Bayou Bienvenue and Bayou Dupre Floodgates | Unrestricted - Best Value | $50-100M | Q-4-2009 |
LPV-145 | Chalmette Loop Levee - Bayou Bienvenue to Bayou Dupre. | Unrestricted | $100-500M | Q-4-2009 |
LPV-146 | Chalmette Loop Levee - Bayou Dupre to Hwy 46 | Unrestricted | $100-500M | Q-1-2010 |
LPV-147 | Chalmette Loop Levee - Bayou Road Floodgate and Hwy. 46 ramp | SDV | $20-50M | Q-1-2010 |
LPV-148.01 | Chalmette Loop Levee - Hwy 46 to River (Verret to Caernarvon) - raise to authorized grade | Unrestricted - Best Value | $41.82 | 10-31-2007 |
LPV-148.02 | Chalmette Loop Levee Hwy 46 to River (Verret to Caernarvon) | Unrestricted - Best Value | $100-500M | Q-2-2009 |
LPV-149 | Chalmette Loop Levee - Verret to Caernarvon Structures - | Unrestricted - Best Value | $20-50M | Q-3-2011 |
WEST BANK & VICINITY NEW ORLEANS, LA -- BELLE CHASE (8 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
WBV-09a | Hero Canal to Oakville - Levees | Unrestricted - Best Value | $5-20M | Q-2-2010 |
WBV-10 | Belle Chasse PS #1 (Plaquemines PS) Fronting Protection and Modifications-Phase 1 | Unrestricted - Best Value | $20-50M | Q-3-2009 |
WBV-11 | Belle Chasse PS #2 Fronting Protection and Modifications | HZ-MATOC | $5-20M | Q-3-2009 |
WBV-12 | Hero Canal Reach 1, 2nd Enlgt | Unrestricted - Best Value | $50-100M | Q-3-2009 |
WBV-13 | S&WB PS #11Fronting Protection and Modifications | Unrestricted - Best Value | $20-50M | Q-3-2009 |
WBV-48.1 | Belle Chasse Hwy to Algiers Lock (East) - Phase 1 | Unrestricted | $4.99 | 08-08-2005 |
WBV-49.1 | Hero Levee to Belle Chasse Hwy (East) - Phase 1 | Unrestricted - Best Value | $0-5M | Q-3-2009 |
WBV-90 | GIWW-West Closure Complex | Unrestricted - Best Value | $500M-1B | Q-2-2009 |
SELA -- HARVEY / WESTWEGO (8 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
SELA-02 | Westwego PS Diesel Engine | 8(a) - MATOC | $1.49 | 12-18-2006 |
SELA-03 | Westminster/Lincolnshire PS Backup Generator | 8(a) - MATOC | $8.85 | 12-29-2006 |
SELA-05 | Grand Cross Canal @ Lapalco | HZ-MATOC | $8.66 | 06-18-2007 |
SELA-10 | Mayronne Canal | 8(a) - MATOC | $5-20M | Q-4-2009 |
SELA-11 | Cousins Canal - Phase 2 | 8(a) - MATOC | $9.00 | 09-27-2007 |
SELA-12 | Two Mile Canal Phase 2 | HZ-MATOC | $20-50M | Q-3-2009 |
SELA-13 | Justice and Oil Company Canals | HZ-MATOC | $5-20M | Q-1-2010 |
SELA-OG-2 | Two Mile Canal Phase 1 | | $5-20M | 10-23-2003 |
STORMPROOFING PUMP STATIONS -- HARVEY / WESTWEGO (6 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
JSP-02 | Mount Kennedy Generator | HZ-MATOC | $0-5M | Q-4-2009 |
JSP-03 | Five Safe Rooms | HZ-MATOC | $17.16 | 12-18-2007 |
JSP-04 | Seven Pump Station Automation | HZ-MATOC | $5-20M | 09-22-2008 |
JSP-05 | Storm Proofing Five Pump Stations | HUBZONE | $5-20M | Q-3-2009 |
JSP-08 | Storm Proofing Two Pump Stations | HUBZONE | $5-20M | Q-4-2009 |
JSP-09 | Storm Proofing Three Pump Stations | HUBZONE | $0-5M | Q-4-2009 |
NON FEDERAL PUMP STATION REPAIRS -- NEW ORLEANS METRO (6 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
OPS-03 | Motors Rewinds P.S. 1 & 6 | Service | $3.31 | 05-15-2006 |
OPS-05 | Horizontal Pump Bearings | Service | $1.11 | 09-20-2006 |
OPS-06b | OPS-06b Bearings - PS 4, 6, 10, 12, 19 | Service | $2.96 | 12-01-2006 |
OPS-07a | Frequency Changers Carrollton Building | Service | $3.42 | 11-22-2006 |
OPS-07b | OPS-07b - Frequency Changers Station 17 (D) | Service | $3.34 | 11-22-2006 |
SBPS-03 | Generators for PS#1 and 4 | 8(a) | $0.07 | 07-27-2006 |
STORMPROOFING PUMP STATIONS -- JEFFERSON EAST BANK / ST.CHARLES (5 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
JSP-01 | Climber Screens | HZ-MATOC | $0-5M | Q-2-2009 |
JSP-06 | Storm Proofing Two Pump Stations | HUBZONE | $5-20M | Q-3-2009 |
JSP-07 | Storm Proofing Two Pump Stations | HUBZONE | $5-20M | Q-3-2009 |
JSP-10 | Storm Proofing Two Pump Stations | HUBZONE | $0-5M | Q-4-2009 |
JSP-11 | Storm Proofing One Pump Station | HUBZONE | $0-5M | Q-4-2009 |
OEB - TEMPORARY PUMPS -- NEW ORLEANS METRO (5 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
OEB-12 | Temporary Pump Supply 07 - 17th St. Canal | Supply | $5-20M | 12-22-2006 |
OEB-13 | Temporary Pump Supply 07 - London Ave. Canal | Supply | $5-20M | 12-22-2006 |
OEB-14 | Temporary Pump Installation 07 - 17th St. Canal | Design Build | $5-20M | 01-31-2007 |
OEB-15 | Temporary Pump Installation 07 - London Ave. Canal | Design Build | $20-50M | 01-31-2007 |
OEB-17 | Enhancement Work at 17th St, London, and Orleans Ave. Temporary Pump Stations | | $5-20M | 01-20-2008 |
SELA -- GRETNA / ALGIERS (5 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
SELA-06 | Gardere Canal - Phase 2 | Unrestricted - Best Value | $31.35 | 01-12-2007 |
SELA-14 | Industry Canal | HZ-MATOC | $20-50M | Q-2-2010 |
SELA-15 | Trapp Canal | Unrestricted - Best Value | $20-50M | Q-2-2010 |
SELA-16 | Gardere Canal-Phase III (Murphy Canal) | Unrestricted - Best Value | $20-50M | Q-2-2010 |
SELA-OG-5 | Whitney/Barataria Pump Station | | $5-20M | 12-15-1999 |
STORMPROOFING PUMP STATIONS -- NEW ORLEANS METRO (4 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
OSP-06 | Storm Proofing Three Pump Stations | SDV | $5-20M | Q-4-2009 |
OSP-07 | Storm Proofing One Pump Station | SDV | $5-20M | Q-4-2009 |
OSP-08 | Storm Proofing Six Pump Stations | SDV | $5-20M | Q-4-2009 |
OSP-10 | DPS 17 Generator | SDV | $5-20M | Q-3-2009 |
LAROSE TO GOLDEN MEADOW -- LAROSE TO GOLDEN MEADOWS (3 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
LGM-000 | Section D; South Berm and Mitigation Levee | 8(a) - MATOC | $1.73 | 11-21-2006 |
LGM-001 | C North 3rd Lift | 8(a) - MATOC | $5-20M | Q-2-2009 |
LGM-002 | D North 3rd Lift | 8(a) - MATOC | $2.88 | 11-21-2006 |
NON FEDERAL PUMP STATION REPAIRS -- HARVEY / WESTWEGO (3 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
JPS-03a | Roofing Siding Repairs | 8(a) | $0.10 | 07-17-2006 |
JPS-03b | Roofing Siding Repairs | 8(a) | $0.07 | 07-17-2006 |
JPS-03c | Roofing Siding Repairs | 8(a) | $0.10 | 07-17-2006 |
NON FEDERAL PUMP STATION REPAIRS -- PLAQUEMINES (3 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
PPS-01a | Hayes, Espalh, Bellevue, Scarsdale | | $7.99 | 06-19-2008 |
PPS-01b | Gainard Woods 2 and Sunrise 2. | | $2.65 | 08-26-2008 |
PPS-01c | Diamond and Wpalh | | $1.99 | 12-17-2008 |
IHNC FLOODGATES -- NEW ORLEANS EAST (2 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
IHNC-01 | IHNC Flood Protection- Seabrook | Design Build | $50-100M | Q-2-2010 |
IHNC-02 | IHNC Flood Protection- GIWW/MRGO | Design Build | $695.00 | 04-03-2008 |
NON FEDERAL PUMP STATION REPAIRS -- JEFFERSON EAST BANK / ST.CHARLES (2 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
JPS-01 | Roofing Repairs Bonnabel | 8(a) | $0.10 | 05-10-2006 |
JPS-02 | Roofing Repairs Duncan | 8(a) | $0.10 | 05-11-2006 |
NON FEDERAL PUMP STATION REPAIRS -- NEW ORLEANS EAST (2 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
OPS-06a | Bearings - PS 1, 14, 15, 16, I-10 | Service | $3.22 | 12-01-2006 |
OPS-11 | Elaine Pump Station Repair | 8(a) | $0-5M | Q-1-2009 |
NON FEDERAL PUMP STATION REPAIRS -- ST BERNARD (2 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
OPS-02 | Motor Rewinds P.S. 2,3,5 & 7 | Service | $4.07 | 05-15-2006 |
SBPS-01 | Design Build Contract Rebuild 2,3,and 5 | Design Build | $17.90 | 05-17-2007 |
PUMP STATION # 6 EMERGENCY GENERATOR SET -- NEW ORLEANS METRO (2 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
PSG-01 | PS # 6 Emergency Generator | | $2.59 | 10-31-2006 |
PSG-02 | PS # 6 Fuel Tanks | | $0-5M | 09-12-2006 |
SELA -- NEW ORLEANS EAST (2 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
SELA-18 | Dwyer Road PS Intake Culvert | Unrestricted - Best Value | $58.83 | 08-27-2008 |
SELA-OG-3 | Dwyer Road PS Improvements | | $20-50M | 09-21-2000 |
STORMPROOFING PUMP STATIONS -- GRETNA / ALGIERS (2 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
OSP-12 | DPS 13 Generator | SDV | $5-20M | Q-4-2009 |
OSP-13 | Storm Proofing One Pump Station | SDV | $0-5M | Q-4-2009 |
STORMPROOFING PUMP STATIONS -- NEW ORLEANS EAST (2 contracts)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
OSP-09 | Storm Proofing Three Pump Stations | SDV | $0-5M | Q-3-2009 |
OSP-11 | Storm Proofing One Pump Station | SDV | $5-20M | Q-4-2009 |
GRAND ISLE -- GRAND ISLE (1 contract)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
GI-01 | Grand Isle Federal Levee | HUBZONE | $12.50 | 04-08-2008 |
NON FEDERAL PUMP STATION REPAIRS -- BELLE CHASE (1 contract)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
PPS-01d | Belle Chasse 1+2, Ollie, Grand Deliard, Dvvic | | $1.65 | 12-19-2008 |
NON FEDERAL LEVEE REPAIRS -- PLAQUEMINES (1 contract)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
NF-02 | Braithwaite to Scarsdale Non-Federal | HUBZONE | $1.39 | 06-15-2006 |
NON FEDERAL LEVEE REPAIRS -- GRAND ISLE (1 contract)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
NF-01 | Grand Isle Non Federal | 8(a) | $5-20M | Q-4-2009 |
WEST BANK & VICINITY NEW ORLEANS, LA -- PLAQUEMINES (1 contract)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
WBV-09b | Hero Canal to Oakville - Structures | Unrestricted - Best Value | $0-5M | Q-3-2010 |
SCADA -- NEW ORLEANS METRO (1 contract)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
SCADA-01 | SCADA system for 17th Street, London and Orleans Avenue Canals | Unrestricted | $5.43 | 04-19-2006 |
PERMANENT CANAL CLOSURES AND PUMP STATIONS -- NEW ORLEANS METRO (1 contract)
Contract ID | Contract | Contracting Package | Contract Estimate (in millions $) | Contract Awards (quarters based on calendar year) |
PCCP-01 | Outfall Canal Closures | Design Build | $100-500M | Q-2-2010 |