National Plan of Integrated Airport Systems (NPIAS) Reports
2009-2013 NPIAS Report
(Editorially Updated: 10/15/2008)
The Secretary of Transportation transmitted the 2009-2013 National Plan of Integrated Airport Systems (NPIAS) to Congress on September 30, 2008. The AIP-eligible development needs identified in this report were compiled as of December 2007 with selected updates through February 2008. The 5-year development totals shown in Appendix A will be used for calculation of FY 2009 and FY 2010 nonprimary entitlements.
We have divided the latest report into sections for easy downloading.
- NPIAS Narrative (PDF, 2.98 MB) - 86 pages, includes Executive Summary and Chapters 1-4
- Appendix A: List of NPIAS Airports with 5-Year Forecast Activity and Development Cost
Parts Airports Included Pages Part 1 (PDF, 1.33 MB) Explanation of Terms, New Airports Expected Within 5 Years, AL, AK, AZ, AR, CA 1-22 Part 2 (PDF, 1.04 MB) CO, CT, DE, FL, GA, HI, ID, IL, IN, IA 23-41 Part 3 (PDF, 1.28 MB) KS, KY, LA, ME, MD, MA, MI, MN, MS, MO, MT 42-62 Part 4 (PDF, 1.61 MB) NE, NV, NH, NJ, NM, NY, NC, ND, OH, OK, OR, PA, RI, SC, SD 63-91 Part 5 (PDF, 1.18 MB) TN, TX, UT, VT, VA, WA, WV, WI, WY, AS, GU, MP, PR, VI 92-116 Complete (MS Excel) Excel File of all airports in Appendix A - Appendix B: State and Territory Maps of NPIAS Airports
Parts Airports Included Pages Part 1 (PDF, 1.87 MB) Explanation of maps, US Map, AL, AK, AZ, AR, CA 1-12 Part 2 (PDF, 1.88 MB) CO, CT, DE, FL, GA, HI, ID, IL, IN, IA, KS 13-24 Part 3 (PDF, 1.77 KB) KY, LA, ME, MD, MA, MI, MN, MS, MO, MT 25-34 Part 4 (PDF, 1.79 MB) NE, NV, NH, NJ, NM, NY, NC, ND, OH 35-44 Part 5 (PDF, 1.99 MB) OK, OR, PA, RI, SC, SD, TN, TX, UT 45-56 Part 6 (PDF, 1.32 MB) VT, VA, WA, WV, WI, WY, AS, GU, MP, PR, VI 57-67 - Appendix C: Regional Offices' Addresses and Telephone Numbers (PDF)