AIRPORT TECHNOLOGY R & D BRANCH
H-Bar Strain Gage H90 |
| Gage# |
H90 |
Slab |
B3 |
Slab North |
0.5 |
Slab East |
5 |
Denver North |
61315.5 |
Denver East |
86148.75 |
PCC Thickness |
17.55 |
Depth |
3.3 |
Orientation |
E-W |
Calibration |
150.23 |
Location |
TETL |
Cross Reference |
H37 |
Mode |
|
Operational |
|
Back to H-Bar Listing
|
Contact the Project Lead: Dr. David
Brill, AAR-410
Last Update: 01/28/03
|