When responding to the first part of Evaluative Measures, be certain to address each of the three required performance measures.
Scores for performance measures are on a 1-10 scale, which is parallel to the BPHC Grantee Satisfaction Survey results scale of 1-100.
Existing NTA recipients are aware of their individual survey results and may use that as a baseline.
For organizations that do not have a baseline, the most recent BPHC survey results indicate a National Cooperative Agreements satisfaction score of 71 or a 7 on the performance measure scale. If an applicant chooses to include additional measures, please be certain to adhere to the guidelines present in the second part of Criterion 3.
> National Technical Assistance Cooperative Agreement Program Details
|