No-rise Certification for Floodways

NFIP Policy Index

Definition/Description:

Any project in a floodway must be reviewed to determine if the project will increase flood heights. An engineering analysis must be conducted before a permit can be issued. The community's permit file must have a record of the results of this analysis, which can be in the form of a No-rise Certification. This No-rise Certification must be supported by technical data and signed by a registered professional engineer. The supporting technical data should be based on the standard step-backwater computer model used to develop the 100-year floodway shown on the Flood Insurance Rate Map (FIRM) or Flood Boundary and Floodway Map (FBFM).

Back To Top

NFIP Requirement:

Back To Top

Other Applicable NFIP Regulations:

Back To Top

Guidance:

Back To Top

Related Keywords:

Back To Top

Special Topic Resources:

Back To Top

Last Modified: Tuesday, 17-Apr-2007 09:42:04 EDT