ATOP Controller Equipment
|
|
In May 2003, Lockheed-Martin completed "Phase 1" of the ATOP equipment installation at ZAN. A supervisor's desk, seven controller workstations, and two workstations for handicapped controllers were installed in the north end of the operational control room. Three workstations were also installed in the training area (DYSIM). "Phase 2", starting in September, will populate these stations with processors, monitors, and associated equipment. |
|
The ATOP Training (DYSIM) Area |
|
|
|
The Supervisor's Desk |
Supe's Desk (Other side) |
|
|
Controller Workstations (East) |
Controller Workstations (West) |
|
|