You know it as one of the great natural wonders of the world. But did you know that the power behind Niagara Falls also helps generate some of the least expensive electricity anywhere?

The United States and Canada have shared the Niagara River's water power—along with a commitment to preserve the beauty of the Falls—for nearly half a century.  And our Niagara Power Project will continue to produce steady supplies of clean, carbon-free hydroelectricity for another 50 years with a new federal license which took effect September 1, 2007.

When the Niagara project produced its first power in 1961, it was the largest hydropower facility in the Western world at the time. Today, Niagara is the biggest electricity producer in New York State, generating 2.4 million kilowatts—enough power to light 24 million 100-watt bulbs at once! This low-cost electricity saves the state's residents and businesses hundreds of millions of dollars a year.

In 2006, the Power Authority completed a $300-million upgrade and modernization at the project’s Robert Moses Niagara Power Plant. All 13 turbines have been replaced and other improvements were made to generating equipment in the power dam, enabling the project to operate at maximum efficiency well into the 21st century.

Here's how it works:
The Niagara project, located about 4 1/2 miles downstream from the Falls, consists of two main facilities: the Robert Moses Niagara Power Plant, with 13 turbines, and the Lewiston Pump-Generating Plant, with 12 pump-turbines. In between the two plants is a forebay capable of holding about 740 million gallons of water; behind the Lewiston plant, a 1,900-acre reservoir holds additional supplies of this liquid fuel.

Put very simply, we divert water from the Niagara River—up to 375,000 gallons a second—and convey it through conduits under the City of Niagara Falls to Lewiston. From there, water flowing through the Robert Moses plant spins turbines that power generators, converting this mechanical energy into electrical energy.

At night, when electricity demand is low, the Lewiston units operate as pumps, transporting water from the forebay up to the plant's reservoir.

During the daytime, when electricity use peaks, the Lewiston pumps are reversed and become generators, similar to those at the Moses plant. In this way, the water can be used to produce electricity twice, increasing production and efficiency.

To balance the need for power with a desire to preserve the beauty of Niagara Falls, the United States and Canada signed a treaty in 1950 that regulates the amount of water diverted for hydroelectricity production. On average, more than 200,000 cubic feet per second (cfs), or 1.5 million gallons of water a second, flow from Lake Erie into the Niagara River. The 1950 pact requires that at least 100,000 cfs of water spill over the Falls during the daylight hours in the tourist season, April through October. This flow may be cut in half at night during this period and at all times the rest of the year.

Breaking the ice:
Each winter, we at the Power Authority work cooperatively with Ontario Power Generation, a neighboring utility, to prevent ice on the upper Niagara River from impeding power production and causing the flooding of shoreline property.

One of our joint efforts is an 8,800-foot-long ice boom, consisting of steel pontoons linked together and anchored to the river bottom at Lake Erie's outlet to the Niagara River. The boom prevents the buildup of ice, yet allows water to continue flowing downstream.

When gale winds blow and temperatures drop below zero, three special-duty boats are used to patrol the river, breaking up the ice and maneuvering it over the Falls. The Power Authority's primary icebreaker, the William H. Latham, is a 77-ton vessel that literally glides over the top of the ice, crushing it into manageable chunks. The Breaker, a modified tugboat, assists the Latham. Ontario Hydro operates a similar icebreaker called the Niagara Queen.

How it began:
The history of Niagara Falls begins with ice. Some 12,000 years ago, the ice that had blanketed North America began to thaw. This water gradually formed the Great Lakes, carving out the Niagara Gorge and the 350-foot drop that enables us to produce our power today.

The first hydroelectric generating station on the Niagara River was built in 1881. An 86-foot cascade of water generated electricity, which ran the machinery of local mills and lit up some of the village streets.

Photo of Niagara Project fishing pier

By 1896, the first long-distance transmission of electricity began flowing from Niagara Falls to Buffalo, some 26 miles away. The success of hydropower plants was evident with additional generating stations built along the Niagara River. But disaster struck in 1956 when the region's largest hydropower station was partially destroyed in a landslide.

With power production drastically cut, tens of thousands of manufacturing jobs were at stake and a long-simmering debate over Niagara's hydropower rights had come to a head. In 1957, Congress passed the Niagara Redevelopment Act, which granted the Power Authority a federal license to fully develop the United States' share of the Niagara River's hydroelectric potential. Within three years—on exactly the day predicted by Robert Moses, the "Master Builder" and then chairman of the Power Authority—the Niagara project produced first power.

President John F. Kennedy called the project, "an outstanding engineering achievement" and "an example to the world." Its reputation has attracted engineers and other visitors from around the world. You can see this outstanding achievement—and more—at the Power Vista, our visitors center.

 

 

News:

October 30, 2008 - NY Power Authority Creates New Habitat to Protect Fish in Niagara River (includes photo and caption)

October 16, 2008 - Applications to be Accepted for Greenway Projects in Eerie County

May 20, 2008- Three Niagara Falls Manufacturers Receive Low-Cost Niagara Hydropower Allocations for 139 New Jobs and Nearly $20 Million in Capital Investment

May 1. 2008 - Hydro Allocations to Support Creation of 110 New Jobs in Western New York

March 31, 2008 - Polly king Paintings on Display at Niagara Power Project

March 27, 2008 - Power Authority to Reopen Niagara Fishing Pier

March 24, 2008 - NYPA Marking 50th Anniversary of Niagara Construction Start (includes photos and captions)

January 25, 2008 - Multi-Year Maintenance Project Starts on Water Intake Structures for Niagara Power Project

January 18, 2008 - First Greenway Dollars Awarded: State Parks Standing Committee funds restoration projects (Joint press release with NYS Office of Parks, Recreation and Historic Preservation-Western District Niagara Falls, NY)

NYPA Niagara relicensing web site

Read Western New York Update, our community newsletter covering NYPA activities in the region near our plant.

Be Smart, Be Safe at the Niagara Power Project - brochure - .pdf (printer-friendly) version; .html (text-only) version

Highlights:

September 14, 2007 - NYPA President Kelley Cites Benefits of Niagara Power to Businesses (excerpts from remarks)

September 6, 2007 - New 50-year License for Niagara Power Project, Now Effective, Signifies Substantial New Benefits for Region

August 30, 2007 - NYPA Allocates Additional Low-Cost Power to Lewiston

August 9, 2007 - Niagara Power Project Construction Veterans Return (includes photos)

August 7, 2007  - State Office of Parks and New York Power Authority Announce Funding for Niagara River Greenway Commission (Jointly issued by NYPA and NYS Office of Parks, Recreation & Historic Preservation)

Niagara Capacity Report and Load Study - March 2007

March 15, 2007 - Commission Relicenses 2,755-MW Niagara Hydro Project; environmental improvements to renewable power source (Federal Energy Regulatory Commission press release)

March 15, 2007 - Joint Statement by NYPA Chairman Frank S. McCullough, Jr., and President & CEO Timothy S. Carey on Approval of New Federal Operating License for Niagara Power Project

December 21, 2006 - NYPA Completes Upgrade of Niagara Project

May 23, 2006 - N.Y. Power Authority and Niagara University Reach Agreement for the Relicensing of Niagara Power Project: Agreement Includes $10.5 Million in Funding for University and NYPA’s Transfer of 24-Acre Parcel of Land