PGI 204.7103-2 Numbering procedures.
(See DFARS 204.7103-2 - Pop-up window, PGI Viewer mode)
(a) Contract line items shall consist of four numeric digits 0001 through 9999. Do not use numbers beyond 9999. Within a given contract, the item numbers shall be sequential but need not be consecutive.
(b) The contract line item number shall be the same as the solicitation line item number unless there is a valid reason for using different numbers.
(c) Once a contract line item number has been assigned, it shall not be assigned to another, different, contract line item in the same contract.
PGI
204.7104 Contract subline items.
(See DFARS 204.7104 - Pop-up window, PGI Viewer mode)
PGI
204.7104-2 Numbering procedures.
(See DFARS 204.7104-2 -Pop-up window, PGI Viewer mode)
(a) Number subline items by adding either two numeric characters or two alpha characters to the basic contract line item number.
(1) Information subline item numbers. Use numeric characters only for information subline items, running 01 through 99. Do not use spaces or special characters to separate the subline item number from the contract line item number that is its root. For example, if the contract line item number is 0001, the first three subline items would be 000101, 000102, and 000103. Do not use a designation more than once within a contract line item.
(2) Separately identified subline items. Use alpha characters only for separately identified subline items, running AA through ZZ. Do not use spaces or special characters to separate the subline item number from the contract line item number that is its root. For example, if the contract line item number is 0001, the first three subline items would be 0001AA, 0001AB, and 0001AC.
(i) Do not use the letters I or O as alpha characters.
(ii) Use all 24 available alpha characters in the second position before selecting a different alpha character for the first position. For example, AA, AB, AC, through AZ before beginning BA, BB, and BC.
(b) Within a given contract line item, the subline item numbers shall be sequential but need not be consecutive.
(c) Exhibits may be used as an alternative to setting forth in the schedule a long list of contract subline items. If exhibits are used, create a contract subline item citing the exhibit's identifier. See DFARS 204.7105.
(d) If a contract line item involves ancillary functions, like packaging and handling, transportation, payment of state or local taxes, or use of reusable containers, and these functions are normally performed by the contractor and the contractor is normally entitled to reimbursement for performing these functions, do not establish a separate subline item solely to account for these functions. However, do identify the functions in the contract schedule. If an offeror separately prices these functions, the contracting officer may establish separate subline items for the functions; however, the separate subline items must conform to the requirements of DFARS 204.7104-1.
(e) The following examples illustrate subline items numbering—
(1) Subline items structured to identify destinations for identical items, identically priced (delivery schedule shall be established for each subline item, not the contract line item).
ITEM NO. |
SUPPLIES/SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
0001 |
NSN 1615-00-591-6620 Shim, Aluminum Alloy,... Apbl, Rotor, Helicopter PRON A1-9-63821-M1-M1 ACRN:AA |
|
|
|
|
0001AA |
A3168R-9030-4025 A2537M IPD: 2 RDD: 334 PROJ: 501 |
10 |
EA |
$100.00 |
$1,000.00 |
0001AB |
A3168R-9030-4026 A51AXBM IPD: 2 RDD: 325 PROJ: 502 |
10 |
EA |
$100.00 |
$1,000.00 |
0001AC |
A3168R-9030-4027 A67KBCM IPD: 2 RDD: 349 PROJ: 503 |
15 |
EA |
$100.00 |
$1,500.00 |
(2) Subline items structured to identify destinations for identical items, not identically priced (delivery schedule shall be established for each subline item, not the contract line item).
ITEM NO. |
SUPPLIES/SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
0001 |
NSN 1615-00-591-6620 Shim, Aluminum Alloy,... Apbl, Rotor, Helicopter PRON A1-9-63821-M1-M1 ACRN:AA |
|
|
|
|
0001AA |
A3168R-9030-4025 A2537M IPD: 2 RDD: 334 PROJ: 501 |
10 |
EA |
$100.00 |
$1,000.00 |
0001AB |
A3168R-9030-4026 A51AXBM IPD: 2 RDD: 325 PROJ: 502 |
20 |
EA |
$99.00 |
$1,980.00 |
0001AC |
A3168R-9030-4027 A67KBCM IPD: 2 RDD: 349 PROJ: 503 |
30 |
EA |
$98.00 |
$2,940.00 |
NOTE: Difference in prices for identical items is due to separate destinations for FOB destination delivery.
(3) Subline items structured to identify different sizes of an item that are identically priced (delivery schedule shall be established for each subline item, not the contract line item).
ITEM NO. |
SUPPLIES/ SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
0013 |
Boots Insulated, Cold Weather White, Type II, Class 1 |
|
PR |
$38.35 |
$13,422.50 |
0013AA |
8430-00-655-5541 Size 5N |
50 |
|
|
|
0013AB |
8430-00-655-5544 Size 8N |
70 |
|
|
|
0013AC |
8430-00-655-5551 Size 9N |
30 |
|
|
|
0013AD |
8430-00-655-5535 Size 9R |
200 |
|
|
|
NOTE: Unit price and total amount shown at line item level rather than at subline item level.
(4) Subline items structured to identify different sizes of an item that are not identically priced (delivery schedule shall be established for each subline item, not the contract line item).
ITEM NO. |
SUPPLIES/ SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
0002 |
Body Armor Ground Troops Variable Type Small Arms, Fragmentation Protective Nylon Felt Vest, Front and Back Plates, Ceramic Plate, Type I |
|
|
|
|
0002AA |
First Article |
1 |
LO |
NSP |
|
0002AB |
8470-00-141-0935 Medium Regular |
1936 |
SE |
$331.77 |
$642,306.72 |
0002AC |
8470-00-141-0936 Large Regular |
625 |
SE |
$355.77 |
$222,356.25 |
0002AD |
8470-00-141-0937, Medium Long |
1237 |
SE |
$346.77 |
$428,954.49 |
0002AE |
8470-00-141-0938, Large Long |
804 |
SE |
$365.77 |
$294,079.08 |
(5) Subline items structured to provide the capability for relating subordinate separately priced packaging costs to the overall contract line item. (Separate delivery schedules shall be established for the subline item identifying the contractor's product and for the subline item identifying packaging. No schedule will be established for the contract line item.)
ITEM NO. |
SUPPLIES/ SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
0001 |
6105-00-635-6568 50380 Ref No 63504-WZ Armature Motor ACRN: AA |
|
|
|
|
0001AA |
6105-00-635-6568 50380 Ref No 63504-WZ Armature Motor ACRN: AA |
2 |
EA |
$2,895.87 |
$5,791.74 |
0001AB |
Packaging ACRN:AA |
2 |
EA |
$289.58 |
$579.16 |
(6) Subline items structured to identify different accounting classifications for identical items (delivery schedule shall be established for each subline item, not the contract line item).
AJ: 17X150518350315069100000192B000000000000000000
AK: 17X150518370317569100000192B000000000000000000
AL: 17X150519350314369100000192B000000000000000000
ITEM NO. |
SUPPLIES/ SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
0002 |
Pulse Decoder KY-312/A5Q-19 |
|
EA |
$3,037.40 |
|
0002AA |
Pulse Decoder KY-312/A5Q-19 ACRN: AJ |
2 |
|
|
$6,074.80 |
0002AB |
Pulse Decoder KY-312/A5Q-19 ACRN: AK |
6 |
|
|
$18,224.40 |
0002AC |
Pulse Decoder KY-312/A5Q-19 ACRN: AL |
2 |
|
|
$6,074.80 |
NOTE: Unit price may be shown at line item level and total amounts shown at subline item level.
(7) Informational subline items established to identify multiple accounting classification citations assigned to a single contract line item.
ITEM NO. |
SUPPLIES/ SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
0001 |
Air Vehicle |
1 |
EA |
$6,700,000 |
$6,700,000 |
|
000101 ACRN:AA $3,300,000 |
|
|
|
|
|
000102 ACRN:AB $2,000,000 |
|
|
|
|
|
000103 ACRN:AC $1,400,000 |
|
|
|
|
(8) Subline items structured to identify parts of an assembly (delivery schedule and price shall be established for each identified part at the subline item level, not for the assembly at the contract line item level).
ITEM NO. |
SUPPLIES/ SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
|
0003 |
Automatic Degausing System Consisting of: (2 ea @ $52,061; $104,122 total) |
|
|
|
|
|
0003AA |
Switchboard |
2 |
EA |
$52,061.00 |
$104,122.00 |
|
0003AB |
Remote Control Panel |
2 |
EA |
NSP |
|
|
0003AC |
Power Supply (M Coil) SSM Type 145 Amps, 220 V DC) |
2 |
EA |
NSP |
|
|
* |
* |
* |
|
|
* |
* |
0003AF |
Power Supply (A Coil) SSM Type (118 Amps, 220 V DC) |
2 |
EA |
NSP |
|
|
(9) Subline items structured to identify parts of a kit (delivery schedule and price shall be established for each identified part at the subline item level, not for the kit at the contract line item level).
ITEM NO. |
SUPPLIES/ SERVICE |
QUANTITY |
UNIT |
UNIT PRICE |
AMOUNT |
|
0031 |
Conversion Kit to Convert Torpedo MK 45 Mod 0 to Torpedo MK 45 Mod 1 (50 Kt @ $10,868.52; $543,426 total) |
|
|
|
|
|
0031AA |
Integrator Assy LD 620106 |
50 |
EA |
$10,868.52 |
$543,426.00 |
|
0031AB |
Pulse Generator Assy LD 587569 |
50 |
EA |
NSP |
|
|
0031AC |
Drive Shaft Assy LD 587559 |
50 |
EA |
NSP |
|
|
* |
* |
* |
|
|
* |
|
0031BF |
Actual Panel Assy LD 542924 |
50 |
EA |
NSP |
|
|
NOTE: In this example, the prices of subline items 0031AB through 0031BF are included in the Integrator Assembly.
PGI
204.7105 Contract exhibits and attachments.
(See DFARS 204.7105 - Pop-up window, PGI Viewer mode)
(a) Use of exhibits.
(1) Exhibits may be used instead of putting a long list of contract line items or subline items in the contract schedule. Exhibits are particularly useful in buying spare parts.
(2) When using exhibits, establish a contract line or subline item and refer to the exhibit.
(3) Identify exhibits individually.
(4) Each exhibit shall apply to only one contract line item or subline item, except—
(i) One exhibit may apply to one or more option line item(s) when the data required under the exhibits is identical in all respects except the period during which the option is to be exercised; and
(ii) An exhibit may apply to more than one contract line item if the exhibit is not separately priced and the exhibit deliverable is identical for all applicable contract line items.
(5) More than one exhibit may apply to a single contract line item.
(6) Data items on a DD Form 1423, Contract Data Requirements List, may be either separately priced or not separately priced.
(i) Separately priced. When data are separately priced, enter the price in Section B of the contract.
(ii) Not separately priced. Include prices in a priced contract line item or subline item.
(7) The contracting officer may append attachments to exhibits, as long as the attachment does not identify a deliverable requirement that has not been established by a contract or exhibit line or subline item.
(b) Numbering exhibits and attachments.
(1) Use alpha characters to identify exhibits. The alpha characters shall be either single or double capital letters. Do not use the letters I or O.
(2) Once an identifier has been assigned to an exhibit, do not use it on another exhibit in the same contract.
(3) The identifier shall always appear in the first or first and second positions of all applicable exhibit line item numbers.
(4) If the exhibit has more than one page, cite the procurement instrument identification number, exhibit identifier, and applicable contract line or subline item number on each page.
(5) Use numbers to identify attachments.
(c) Numbering exhibit line items and subline items.
(1) Criteria for establishing. The criteria for establishing exhibit line items and subline items is the same as those for establishing contract line items and subline items (see DFARS 204.7103 and 204.7104, respectively).
(2) Procedures for numbering.
(i) Number items in an exhibit in a manner similar to contract line items and subline items.
(ii) Number line items using a four-position number.
(A) The first position or the first and second position contain the exhibit identifier.
(B) The third and fourth positions contain the alpha or numeric character serial numbers assigned to the line item.
(iii) Assign alpha or numeric characters to the line item on the basis of the same criteria outlined in contract subline items at DFARS 204.7104.
(iv) Exhibit line item numbers shall be sequential within the exhibit.
(3) Examples.
(i) Two-position serial number for double letter exhibit identifier.
Cumulative No. of Line Items |
Serial Number Sequence |
1-33
34-67
68-101
102-135
136-169
170-203
204-237
238-271
272-305
306-339
340-373
374-407
408-441
442-475
476-509
510-543
544-577
578-611
612-645
646-679
680-713
714-747
748-781
782-815
816-849
850-883
884-917
918-951
952-985
986-1019
1020-1053
1054-1087
1088-1121
1122-1155 |
01 thru 09, then 0A thru 0Z, then
10 thru 19, then 1A thru 1Z, then
20 thru 29, then 2A thru 2Z, then
30 thru 39, then 3A thru 3Z, then
40 thru 49, then 4A thru 4Z, then
50 thru 59, then 5A thru 5Z, then
60 thru 69, then 6A thru 6Z, then
70 thru 79, then 7A thru 7Z, then
80 thru 89, then 8A thru 8Z, then
90 thru 99, then 9A thru 9Z, then
A0 thru A9, then AA thru AZ, then
B0 thru B9, then BA thru BZ, then
C0 thru C9, then CA thru CZ, then
D0 thru D9, then DA thru DZ, then
E0 thru E9, then EA thru EZ, then
F0 thru F9, then FA thru FZ, then
G0 thru G9, then GA thru GZ, then
H0 thru H9, then HA thru HZ, then
J0 thru J9, then JA thru JZ, then
K0 thru K9, then KA thru KZ, then
L0 thru L9, then LA thru LZ, then
M0 thru M9, then MA thru MZ, then
N0 thru N9, then NA thru NZ, then
P0 thru P9, then PA thru PZ, then
Q0 thru Q9, then QA thru QZ, then
R0 thru R9, then RA thru RZ, then
S0 thru S9, then SA thru SZ, then
T0 thru T9, then TA thru TZ, then
U0 thru U9, then UA thru UZ, then
V0 thru V9, then VA thru VZ, then
W0 thru W9, then WA thru WZ, then
X0 thru X9, then XA thru XZ, then
Y0 thru Y9, then YA thru YZ, then
Z0 thru Z9, then ZA thru ZZ |
(ii) Three-position numbers.
Cumulative No. of Line Items |
Serial Number Sequence |
1-33
34-67
68-101
102-135
136-305
|
01 thru 009, then 00A thru 00Z, then
010 thru 019, then 01A thru 01Z, then
020 thru 029, then 02A thru 02Z, then
030 thru 039, then 03A thru 03Z and
so on to
|
306-339
340-373
374-407
408-441
442-1121
1122-1155
1156-1189
1190-1223
1224-1257
1258-1461
1462-1495
1496-1529
1530-1563
1564-2277
2278-2311
2312-2345
2346-2379
2380-2413
2414-2617
2618-2651
2652-2685
2686-2719
2720-3433
3434-3467
3468-3501
3502-10403
10404-10437
10438-10471
10472-10709
10710-10743
10744-10777
10778-10811
10812-11525
11526-11559 |
090 thru 099, then 09A thru 09Z, then
0A0 thru 0A9, then 0AA thru 0AZ, then
0B0 thru 0B9, then 0BB thru 0BZ, then
0C0 thru 0C9, then 0CA thru 0CZ, and
so on to
0Z0 thru 0Z9, then 0ZA thru 0ZZ, then
100 thru 109, then 10A thru 10Z, then
110 thru 119, then 11A thru 11Z, then
120 thru 129, then 12A thru 12Z, and
so on to
190 thru 199, then 19A thru 19Z, then
1A0 thru 1A9, then 1AA thru 1AZ, then
1B0 thru 1B9, then 1BA thru 1BZ, and
so on to
1Z0 thru 1Z9, then 1ZA thru 1ZB, then
200 thru 109, then 10A thru 10Z, then
210 thru 219, then 21A thru 21Z, then
220 thru 229, then 22A thru 22Z, and
so on to
290 thru 299, then 29A thru 29Z, then
2A0 thru 2A9, then 2AA thru 2AZ, then
2B0 thru 2B9, then 2BA thru 2BZ, and
so on to
2Z0 thru 2Z9, then 2ZA thru 2ZZ, then
300 thru 309, then 30Z thru 30Z, and
so on to
900 thru 909, then 90A thru 90Z, then
910 thru 919, then 91A thru 91Z, and
so on to
990 thru 999, then 99A thru 99Z, then
9A0 thru 9A9, then 9AA thru 9AZ, then
9B0 thru 9B9, then 9BA thru 9BZ, and
so on to
9Z0 thru 9Z9, then 9ZA thru 9ZZ
|
PGI
204.7107 Contract accounting classification reference number (ACRN).
(See DFARS 204.7107 - Pop-up window, PGI Viewer mode)
(a) The contracting office issuing the contract is responsible for assigning ACRNs. This authority shall not be delegated. If more than one office will use the contract (e.g., ordering officers, other contracting officers), the contract must contain instructions for assigning ACRNs.
(b) Procedures for establishing ACRNs. ACRNs shall be established in accordance with the following guidelines:
(1) Do not use the letters I and O.
(2) In no case shall an ACRN apply to more than one accounting classification citation, nor shall more than one ACRN be assigned to one accounting classification citation.
(c) Using the ACRN in the contract.
(1) Show the ACRN as a detached prefix to the accounting classification citation in the accounting and appropriations data block or, if there are too many accounting classification citations to fit reasonably in that block, in section G (Contract Administration Data).
(2) ACRNs need not prefix accounting classification citations if the accounting classification citations are present in the contract only for the transportation officer to cite to Government bills of lading.
(3) If the contracting officer is making a modification to a contract and using the same accounting classification citations, which have had ACRNs assigned to them, the modification need cite only the ACRNs in the accounting and appropriations data block or on the continuation sheets.
(d) Showing the ACRN in the contract. If there is more than one ACRN in a contract, all the ACRNs will appear in several places in the schedule (e.g., ACRN:AA).
(1) Ship-to/mark-for block. Show the ACRN beside the identity code of each activity in the ship-to/mark-for block unless only one accounting classification citation applies to a line item or subline item. Only one ACRN may be assigned to the same ship-to/mark-for within the same contract line or subline item number unless multiple accounting classification citations apply to a single nonseverable deliverable unit such that the item cannot be related to an individual accounting classification citation.
(2) Supplies/services column.
(i) If only one accounting classification citation applies to a line item or a subline item, the ACRN may be shown in the supplies/services column near the item description.
(ii) If more than one accounting classification citation applies to a single contract line item, identify each assigned ACRN and the amount of associated funds using informational subline items (see DFARS 204.7104-1(a)).
PGI
204.7108 Payment instructions.
(See DFARS 204.7108 - Pop-up window, PGI Viewer mode)
(a) Scope. This section applies to contracts and any separately priced orders that--
(1) Include contract line items that are funded by multiple accounting classification citations for which a contract line item or items are not broken out into separately identifiable subline items (informational subline items are not separately identifiable subline items);
(2) Contain cost-reimbursement or time-and-materials/labor-hour line items; or
(3) Authorize financing payments.
(b) For contracts and orders covered by this subpart, the contracting officer shall establish instructions in Section G (Contract Administration Data), under the heading “Payment Instructions for Multiple Accounting Classification Citations,” to permit the paying office to charge the accounting classification citations assigned to that contract line item (see DFARS 204.7104-1(a)) in a manner that reflects the performance of work on the contract. If additional accounting classification citations are subsequently added, the payment instructions must be modified to include the additional accounting classification citations. Also, contracting officers shall not issue modifications that would create retroactive changes to payment instructions. All payment instruction changes shall be effective as of the date of the modification.
(c) Payment instructions—
(1) Shall provide a methodology for the payment office to assign payments to the appropriate accounting classification citation(s), based on anticipated contract work performance;
(2) Shall be consistent with the reasons for the establishment of separate contract line items.
(3) For contracts or orders other than those that provide for progress payments based on costs, shall be selected from those provided in paragraph (d) of this section;
(4) For contracts or orders that provide for progress payments based on costs, shall use the instructions in paragraph (d)(11) of this section unless the administrative contracting officer authorizes use of one of the other options in paragraph (d);
(5) Shall be revised to address the impact of changes to contract funding or significant disparities between existing instructions and actual contract performance.
(6) Shall state at what level (contract, contract line, subline, exhibit line, or ACRN) the payment instructions should be applied.
(7) Shall not be mixed within a level by contract type. For example, if the instructions apply at the contract level, there can be only one payment instruction for each contract type. If the instructions apply at the contract line or subline level, there can only be one payment instruction per contract line or subline item.
(8) For contracts or orders that contain a combination of fixed-price, cost-reimbursement, and/or time-and-materials/labor-hour line items, shall at a minimum include separate instructions for each contract type of contract line item (e.g., contract-wide proration for fixed-price line items and contract-wide ACRN level for cost-reimbursement line items.
(9) For contracts or orders that contain foreign military sales requirements, shall include instructions for distribution of the contract financing payments to each country's account.
(10) Shall use one of the standard payment instructions in paragraphs (d)(7) through (11) of this section unless the contracting officer documents in the contract file that there are significant benefits of requiring contractor identification of the contract line item on the payment request.
(d) The numbered payment instructions ((d)(1) through (12)) below correspond to the automated payment instructions in the supporting systems; therefore, care should be exercised when identifying the numbered paragraph below in Section G of the contract. Include either one contract-wide instruction or one or more line item specific instructions. The contracting officer shall not use a combination of contract-wide and line item specific instructions.
(1) Line item specific: single funding. If there is only one source of funding for the contract line item (i.e., one ACRN), the payment office will make payment using the ACRN funding of the line item being billed.
(2) Line item specific: sequential ACRN order. If there is more than one ACRN within a contract line item, the payment office will make payment in sequential ACRN order within the line item, exhausting all funds in the previous ACRN before paying from the next ACRN using the following sequential order: Alpha/Alpha; Alpha/numeric; numeric/alpha; and numeric/numeric.
(3) Line item specific: contracting officer specified ACRN order. If there is more than one ACRN within a contract line item, the payment office will make payment within the line item in the sequence ACRN order specified by the contracting officer, exhausting all funds in the previous ACRN before paying from the next ACRN.
(4) Line item specific: by fiscal year. If there is more than one ACRN within a contract line item, the payment office will make payment using the oldest fiscal year appropriations first, exhausting all funds in the previous fiscal year before disbursing from the next fiscal year. In the event there is more than one ACRN associated with the same fiscal year, the payment amount shall be disbursed from each ACRN within a fiscal year in the same proportion as the amount of funding obligated for each ACRN within the fiscal year.
(5) Line item specific: by cancellation date. If there is more than one ACRN within a contract line item, the payment office will make payment using the ACRN with the earliest cancellation date first, exhausting all funds in that ACRN before disbursing funds from the next. In the event there is more than one ACRN associated with the same cancellation date, the payment amount shall be disbursed from each ACRN with the same cancellation date in the same proportion as the amount of funding obligated for each ACRN with the same cancellation date.
(6) Line item specific: proration. If there is more than one ACRN within a contract line item, the payment office will make payment from each ACRN in the same proportion as the amount of funding currently unliquidated for each ACRN.
(7) Contract-wide: sequential ACRN order. The payment office will make payment in sequential ACRN order within the contract or order, exhausting all funds in the previous ACRN before paying from the next ACRN using the following sequential order: alpha/alpha; alpha/numeric; numeric/alpha; and numeric/numeric.
(8) Contract-wide: contracting officer specified ACRN order. The payment office will make payment in sequential ACRN order within the contract or order, exhausting all funds in the previous ACRN before paying from the next ACRN in the sequence order specified by the contracting officer.
(9) Contract-wide: by fiscal year. The payment office will make payment using the oldest fiscal year appropriations first, exhausting all funds in the previous fiscal year before disbursing from the next fiscal year. In the event there is more than one ACRN associated with the same fiscal year, the payment amount shall be disbursed from each ACRN within a fiscal year in the same proportion as the amount of funding obligated for each ACRN within the fiscal year.
(10) Contract-wide: by cancellation date. The payment office will make payment using the ACRN with the earliest cancellation date first, exhausting all funds in that ACRN before disbursing funds from the next. In the event there is more than one ACRN associated with the same cancellation date, the payment amount shall be disbursed from each ACRN with the same cancellation date in the same proportion as the amount of funding obligated for each ACRN with the same cancellation date.
(11) Contract-wide: proration. The payment office will make payment from each ACRN within the contract or order in the same proportion as the amount of funding currently unliquidated for each ACRN.
(12) Other. If none of the standard payment instructions identified in paragraphs (d)(1) through (11) of this section are appropriate, the contracting officer may insert other payment instructions, provided the other payment instructions--
(i) Provide a significantly better reflection of how funds will be expended in support of contract performance; and
(ii) Are agreed to by the payment office and the contract administration office.